13.06.2015 Views

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Evaluation and <strong>assessment</strong> <strong>of</strong> Uruguayan Forest Certification scheme <strong>against</strong> the requirements <strong>of</strong> the <strong>PEFC</strong> Council<br />

25 4.2.3 Group Certification This introduction relates in fact to the SFM system which<br />

relates to 5.3 <strong>of</strong> GD2<br />

25 35)<br />

The criteria and requirements for group certification as set<br />

The criteria and<br />

out in SD07 comply with <strong>PEFC</strong>C requirements.<br />

requirements for group There is no need to repeat the <strong>PEFC</strong>C reference!<br />

certification within <strong>UFCS</strong><br />

(SD07) comply with <strong>PEFC</strong>C<br />

requirements detailed in<br />

Annex 3, 4.1b.<br />

26 43) Comment – Under 7, it is explicit for the member but it is<br />

implicit for the Group Administrator!<br />

... forest area under his/her management should be added<br />

by <strong>PEFC</strong>C<br />

Comments noted. Text amended accordingly.<br />

Comments valid. Text amended accordingly<br />

Comments noted.<br />

p. 27,<br />

4.2.4, 46<br />

The consultants agree with the comment. The<br />

consultants used the exact wording <strong>of</strong> the<br />

<strong>PEFC</strong> Council Minimum Requirements<br />

Checklist (GL 2/<strong>2010</strong>), but would recommend<br />

that <strong>PEFC</strong>C considers amending the<br />

documentation so that it does not contain<br />

gender specific references.<br />

27 45) The shading is missing for the Conforms Comments valid. Report has been amended<br />

27 48)<br />

… on ad hoc basis … … on an ad hoc basis …<br />

28 49)<br />

… on ad hoc basis … … on an ad hoc basis …<br />

28 4.4 Overall Assessment Comment: I have a real concern on the <strong>assessment</strong> for 7),<br />

10), 14), 17) and 43) – I would seek further evidence to<br />

justify the current <strong>assessment</strong>.<br />

5. Assessment <strong>of</strong> <strong>UFCS</strong> Forest Management Standards <strong>against</strong> PEOLG<br />

accordingly.<br />

Comments valid. Report has been amended<br />

accordingly.<br />

Comments valid. Report has been amended<br />

accordingly.<br />

Comments noted. Assessment modified to<br />

recognise non-conformity associated with a<br />

lack <strong>of</strong> documentation requirements for<br />

making summary <strong>of</strong> FMP publicly available.<br />

29 5.1 Assessment Framework,<br />

1st Para<br />

<strong>UFCS</strong> utilizes Norm<br />

(Standard) 1152: 2009 …<br />

The <strong>UFCS</strong> utilizes Norm (Standard) UNIT 1152: 2009 …<br />

The conformity <strong>of</strong> the Criteria and Indicators <strong>of</strong> Standard …<br />

It is the C&I which provide the equivalence with the<br />

Comments were noted. Report has been<br />

amended accordingly.<br />

Text amended.<br />

www.itsglobal.net Page 81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!