11.06.2015 Views

KE5 Mission Report - Environmental Protection of International River ...

KE5 Mission Report - Environmental Protection of International River ...

KE5 Mission Report - Environmental Protection of International River ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Environmental</strong> <strong>Protection</strong> <strong>of</strong><br />

<strong>International</strong> <strong>River</strong> Basins Project<br />

Contract No. 2011/279-666<br />

This project is funded by<br />

the European Union<br />

A project implemented by a Consortium<br />

led by Hulla & Co. Human Dynamics KG<br />

CMW Armenia Vahagn Tonoyan (right) with local hydrogeologists near the Arpi lakethe<br />

source <strong>of</strong> Akhuryan river<br />

Photos by Bernardas Paukstys<br />

Annex 6: Fact Finding <strong>Mission</strong> <strong>Report</strong>s<br />

Human Dynamics KG Consortium<br />

Page 4 <strong>of</strong> 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!