10.06.2015 Views

ESTMZ

ESTMZ

ESTMZ

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ESTMZ</strong> Enhanced Single-Trip<br />

Multizone FracPac System<br />

Ricki Jannise<br />

Senior Product Champion – <strong>ESTMZ</strong><br />

281 988 2282 or 713 702 6716<br />

Ricki.jannise@halliburton.com<br />

Overview


DID YOU KNOW<br />

SAFE DRIVING STARTS AND ENDS<br />

WITH CLICKING AND COMPREHENDING.<br />

When it comes to driving, it’s the little things that often make the biggest<br />

difference. Like fastening your seatbelt before you take to the highway.<br />

According to the U.S. National Highway Traffic Safety Administration,<br />

seat belts reduce serious crash-related injuries and deaths by roughly<br />

50%. That’s a huge number for such a simple action.<br />

Another smart but simple thing safe drivers practice is reading<br />

comprehension. Not just reading every single highway sign, but<br />

understanding and acting on them all. Obeying signs saves time<br />

and speeding tickets. It also alerts you to dangers that can easily<br />

cost you your life.<br />

At Halliburton, solving customer challenges is second only to<br />

keeping everyone safe and healthy. You can find more safety tips<br />

at www.halliburton.com/HSE<br />

Driving Safety<br />

The Halliburton 10 to Zero Life Rules are a compilation of basic rules<br />

that all Halliburton employees know and live by. These are key<br />

components for identifying and managing the hazards in our business.<br />

© 2013 Halliburton. All rights reserved.


What is it?<br />

Halliburton’s Enhanced Single-Trip Multizone (<strong>ESTMZ</strong>) FracPac<br />

System is a downhole tool system that allows the stimulation and<br />

gravel packing of multiple zones in a single trip of the work string into<br />

the well bore.<br />

• Treat and pack multiple zones in one trip<br />

• Isolate zones from each other<br />

• Access zones for treatment<br />

• Open zones for production<br />

<strong>ESTMZ</strong><br />

© 2012 Halliburton. All rights reserved.


Stack-Pack Multizone Completions<br />

•8 trips<br />

•3 perforating runs<br />

•2 cleanout trips<br />

•3 pickling operations<br />

•Formation exposure<br />

to fluids<br />

•Lots of time and $$$$<br />

© 2012 HALLIBURTON. ALL RIGHTS RESERVED.


Halliburton STMZ<br />

Single-Trip Multizone Sand<br />

Control Completion<br />

•Introduced in 1993<br />

•Saves time and trips<br />

•Run in China, Indonesia and<br />

Italy<br />

•>300 jobs with >1,000 zones<br />

•6,000 psi rated – low rate packs<br />

•Two inner strings – space-out<br />

seals<br />

© 2012 Halliburton. All rights reserved.


Enhancements?<br />

•10,000 psi pressure rating<br />

•45 BPM frac pack rating<br />

•3,750,000 lbs of proppant<br />

(cumulative), 16/30 high-strength<br />

proppant, 750,000 lbs per zone<br />

•4.75 inch minimum ID<br />

•Formation isolation<br />

•Easier to run<br />

© 2012 Halliburton. All rights reserved.


Time Savings Analysis<br />

12,000’ Well Depth – 3 zones<br />

<strong>ESTMZ</strong> Installation<br />

• 15-38 Rig Days<br />

• 4 Work String Trips<br />

• $22,800,000 Estimated<br />

Rig Costs<br />

Stacked pack<br />

• 21-68 Rig Days<br />

• 8 Work String Trips<br />

• $40,800,000 Estimated<br />

Rig Costs<br />

<strong>ESTMZ</strong> can save<br />

$18,000,000<br />

© 2012 Halliburton. All rights reserved.


Time Savings Analysis<br />

25,000’ Well Depth – 3 zones<br />

<strong>ESTMZ</strong> Installation<br />

• 24-65 Rig Days<br />

• 4 Work String Trips<br />

• $39,000,000 Estimated<br />

Rig Costs<br />

Stacked pack<br />

• 46-144 Rig Days<br />

• 8 Work String Trips<br />

• $86,400,000 Estimated<br />

Rig Costs<br />

<strong>ESTMZ</strong> can save<br />

$47,400,000<br />

© 2012 Halliburton. All rights reserved.


Candidate Selection<br />

• 9 5/8” 47 – 53.5 ppf ID casing<br />

• 7” 29 – 32 ppf ID casing<br />

• 8-1/2” open hole - consolidated<br />

• Multiple zones – 2 to 5…various lengths okay<br />

• Similar pressure gradients<br />

• Sand / hydrocarbon influx controlled<br />

• Zone spacing: ~3,200’ max and ≥45’ between<br />

zones<br />

© 2012 Halliburton. All rights reserved.


Where it Will Work<br />

• Ultra-deepwater environment<br />

at depths of 30,000 feet<br />

• Shallow multizone sand<br />

control completions<br />

• Domestic United States –<br />

Gulf of Mexico<br />

• International environments –<br />

Far East<br />

© 2012 Halliburton. All rights reserved.


Challenges Addressed<br />

• Improve net recovery from<br />

new and old fields by<br />

allowing the completion of<br />

layered zones and stringers<br />

previously bypassed<br />

• Access deep water and<br />

deeply buried access by<br />

improving the economics of<br />

ultra-deepwater and deep<br />

reservoirs<br />

© 2012 Halliburton. All rights reserved.


<strong>ESTMZ</strong> System<br />

•Treat and pack multiple zones in one trip<br />

•Isolate zones from each other<br />

•Access zones for treatment<br />

•Open zones for production<br />

© 2012 Halliburton. All rights reserved.


<strong>ESTMZ</strong> Installation<br />

• The sump packer is set<br />

• All zones are perforated<br />

• The perforations have been de-burred and<br />

the hole clean<br />

• Fluid loss and cross-flow are stopped<br />

• Make-up, test and space-out <strong>ESTMZ</strong><br />

system<br />

• Run in the hole and sting into the sump<br />

packer<br />

• Set the VCH (top) packer<br />

• Set the isolation packers<br />

• Perform work string pickle operation<br />

© 2012 Halliburton. All rights reserved.


FracPac Tool Assembly<br />

(Frac Sequence)<br />

• Pressure test the service tool<br />

• Perform treatment on the lower zone<br />

• Reverse-out and test<br />

• Perform treatment on the middle zone<br />

• Reverse-out and test<br />

• Perform treatment on the upper zone<br />

• Reverse-out and test<br />

• Pull out of the hole<br />

© 2012 Halliburton. All rights reserved.


<strong>ESTMZ</strong> Production Options<br />

• Production seals<br />

– Intervention to open production sleeves<br />

• Intermediate completion string<br />

– Hang from a packer<br />

– Fluid loss valve<br />

– Shifters to open sleeves<br />

– Seal MCSZ closing sleeves<br />

– Perforated tubing for commingled flow<br />

– DuraSleeves ® sliding sleeve for selective<br />

flow<br />

• SmartWell ® system with ICV’s<br />

© 2012 Halliburton. All rights reserved.


Real Time Visualization Service<br />

RTVS is a multi‐faceted program that utilizes a<br />

steppedprocesstoaidincompletionplanning,<br />

provide real time monitoring of down‐hole tool<br />

movement during the completion process, and<br />

provide replay capability; for analysis after the<br />

completion process.<br />

© 2012 Halliburton. All rights reserved.


Who to Contact, Where to get more information<br />

Ricki Jannise<br />

Senior Product Champion - <strong>ESTMZ</strong><br />

Ricki.jannise@halliburton.com<br />

Phone: 281-988-2282<br />

Fax: 281-575-4995<br />

Cell: 713-702-6716<br />

www.halliburton.com/estmz<br />

© 2012 Halliburton. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!