You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Tieback Example with 16” Liner<br />
Example Deepwater Casing Diagram<br />
Drilling Schematic<br />
Well: Subsea Completion #1 Rig: BA Drillship #1<br />
Mudline Location:<br />
WBS No.<br />
API Well Number:<br />
BHL Location:<br />
Latitude/Longitude.:<br />
RT to MSL (ft): ±90'<br />
OBJECTIVES: Water Depth (ft): ±7000<br />
DIRECTIONAL: Straight Hole<br />
RT to ML (ft): ±7000'<br />
18-3/4" HPWH @ -16' 16' AML<br />
38" Housing @ -12' 12' AML<br />
EVAL GEOLOGIC MARKERS HOLE CASING MUD LOT<br />
PROG OBJECTIVES MD TVD SIZE & CEMENT MW OBG/FG<br />
±7400'<br />
16" LS @ ±7,400<br />
MWD/LWD t/ TD ±300' MD<br />
36" Jetted to ±300' BML<br />
±300' BML<br />
26" Hole<br />
TOS @ 8,509'<br />
8,509' BML<br />
±8800' MD<br />
' BML<br />
TVD<br />
±8800'<br />
10 3/4" X 9-7/8" CROSSOVER @ +/- 9,500'<br />
22" to ±8800'<br />
500' Tail, TOC @ Mud-line, 200% OHE<br />
±17000 MD<br />
TVD<br />
17,000'<br />
13-5/8" TOL @ < 17K'<br />
16"to ±17000'