Introduction<br />

Overview<br />

If the <strong>PM</strong>-7 is shipped in a vertical position:<br />

Move the <strong>PM</strong>-7 with a heavy-duty hand truck (dolly) and strapping.<br />

1. Installation of the Foot Detector<br />

Pull out all the packing material around the lead shielding. Connect the<br />

foot scintillator to its coaxial cable. Place the foot scintillator flat on the<br />

bottom rectangular piece of lead, aligning the scintillator's coaxial<br />

connector with the coaxial cable entry hole. Place the ramp on the<br />

monitor.<br />

2. Installation of the Side Detectors (#4 and #5 bottom, #2 and #3 top)<br />

and their Lead Shielding<br />

The side scintillators will be located behind the large, flat panels that are<br />

between the beveled edges of the <strong>PM</strong>-7 columns. After they are<br />

unlocked, the panels are removed by rotating the top edge away from<br />

the column and raising the bottom off of two locating pins.<br />

a. Lead Installation<br />

The side assembly requires three sizes of lead:<br />

• Long, slender pieces<br />

• Long slender pieces with notches<br />

• Pieces with four mounting holes.<br />

The long, slender pieces of lead are to be mounted at the sides of the<br />

detector bays. Complete the installation of lead shielding in one<br />

side's lower bay before starting the upper bay.<br />

Place the notched edge of the lead shield so that in coincides with<br />

the notch that has the detector cable installed in it, notch pointing<br />

outward.<br />

The scintillator back is shielded with two of the large plates that<br />

have holes drilled in them. Place the first one at the bottom of the<br />

bay, between the side pieces of lead, and so the holes line up with<br />

threaded inserts in the frame. Secure the three pieces of lead with<br />

two of the angle brackets before stacking the second plate with holes<br />

on top of the first. The angle brackets (16 in total) and mounting<br />

screws (1/4-20 x 1-1/4” 1 long flatter supplied in a separate box.<br />

1 1-1/4” is equal to 31.75 mm<br />

Thermo Fisher Scientific<br />

<strong>PM</strong> -7 Manager User’s Guide_1-3_