Introduction<br />
Overview<br />
If the <strong>PM</strong>-7 is shipped in a vertical position:<br />
Move the <strong>PM</strong>-7 with a heavy-duty hand truck (dolly) and strapping.<br />
1. Installation of the Foot Detector<br />
Pull out all the packing material around the lead shielding. Connect the<br />
foot scintillator to its coaxial cable. Place the foot scintillator flat on the<br />
bottom rectangular piece of lead, aligning the scintillator's coaxial<br />
connector with the coaxial cable entry hole. Place the ramp on the<br />
monitor.<br />
2. Installation of the Side Detectors (#4 and #5 bottom, #2 and #3 top)<br />
and their Lead Shielding<br />
The side scintillators will be located behind the large, flat panels that are<br />
between the beveled edges of the <strong>PM</strong>-7 columns. After they are<br />
unlocked, the panels are removed by rotating the top edge away from<br />
the column and raising the bottom off of two locating pins.<br />
a. Lead Installation<br />
The side assembly requires three sizes of lead:<br />
• Long, slender pieces<br />
• Long slender pieces with notches<br />
• Pieces with four mounting holes.<br />
The long, slender pieces of lead are to be mounted at the sides of the<br />
detector bays. Complete the installation of lead shielding in one<br />
side's lower bay before starting the upper bay.<br />
Place the notched edge of the lead shield so that in coincides with<br />
the notch that has the detector cable installed in it, notch pointing<br />
outward.<br />
The scintillator back is shielded with two of the large plates that<br />
have holes drilled in them. Place the first one at the bottom of the<br />
bay, between the side pieces of lead, and so the holes line up with<br />
threaded inserts in the frame. Secure the three pieces of lead with<br />
two of the angle brackets before stacking the second plate with holes<br />
on top of the first. The angle brackets (16 in total) and mounting<br />
screws (1/4-20 x 1-1/4” 1 long flatter supplied in a separate box.<br />
1 1-1/4” is equal to 31.75 mm<br />