08.06.2015 Views

PM-7 Operating Manua.. - Voss Associates

PM-7 Operating Manua.. - Voss Associates

PM-7 Operating Manua.. - Voss Associates

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 1 Installation and Setup<br />

Overview<br />

Immediately after unpacking the monitor, inspect it for external damage.<br />

CAUTION <strong>PM</strong>-7 scintillators are delicate and must be handled with care to<br />

prevent jarring. Place the scintillator on a padded surface free of objects or<br />

materials that could damage the protective wrapping. A detector should be laid<br />

flat on a large surface. Do not stack or place anything on the detector. ▲<br />

If the <strong>PM</strong>-7 is shipped in a horizontal position:<br />

-<br />

1. Place the monitor in its<br />

intended location and<br />

unpack it.<br />

2. The monitor ramp must<br />

be installed after the<br />

monitor is in position. All<br />

ramp support pieces are<br />

removable and designed to<br />

allow staff to move the<br />

monitor through a<br />

doorway.<br />

3. If these side pieces must be<br />

removed, begin by taking<br />

off the 1/4-20 hardware<br />

which holds the supports<br />

to the bottom of the<br />

monitor.<br />

Figure 1.1. Unpack the monitor and place it<br />

in the intended location<br />

4. This will be two hex bolts<br />

and two carriage bolts with nuts on each side of the monitor.<br />

5. Once the monitor is in position, reinstall the side support pieces. The<br />

ramp will be installed later.<br />

Thermo Fisher Scientific <strong>PM</strong> -7 Manager User’s Guide_ 1-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!