This test procedure defines the necessary operations to perform high voltage and gas<br />

leakage checks required to verify proper and reliable performance of the original and revised<br />

<strong>PCM</strong>-2 gas proportional detector designs. The high voltage test is required to check that the<br />

detector does not exhibit excessive corona discharge or "arcing" at its nominal operating<br />

voitage. Excessive arcing can cause the detector to be electrically "noisy". thereby reducing<br />

its overall alpha sensitivity beyond thresholds defined for etfective usage in the <strong>PCM</strong>-2. The<br />

gas leakage test is required to verify that the completed detector assembly has an adequate gas<br />

seal. "Leaky" detectors can cause excessive and costly P-l 0 counting gas consumption and<br />

lead to reduced overall <strong>PCM</strong>-2 detection performance.<br />

The following tests apply to all three sizes of original <strong>PCM</strong>-2 detector assemblies (part numbers)<br />

YP11534245, YP11534246, YP11534247) and revised <strong>PCM</strong>-2 detector assemblies<br />

(part numbers) YP1l534560, 'YP11534561, YP11534562).<br />

ARC TEST:<br />

Equipment needed:<br />

1. "High-pot" tester with arc detection capability and a voltage capacity<br />

of at least 1800 vdc.<br />

2. A source of P-l 0 counting gas regulated to approximately 5 psi.<br />

3. Vacuum pump and vacuum gage ( 0-30 in. Hg vacuum)<br />

4. I flat and rigid steel or aluminum piate measuring 8" X 38".<br />

5. Several medium-sized C-clamps or bench-mounted quick fixturing clamps.<br />

6. Several wooden spreader blocks.<br />

7. Plastic tubing and detector hose-barbed quick-connect fittings as required.<br />

8. Smoked Plexiglass or Lexan plate(s) 1/8" thick measuring 36-3/8" X 7-1/4".<br />

19-5/8" X 6-1/2" and 8-7/8" X 6-1/2" tor long, medium and small probes<br />

respectively.<br />

Setup and testing:<br />

This test can either be performed on completely constructed probe assemblies<br />

or in support of mass assembly operations, on incomplete probes which have<br />

only been built up to the point of mylar "facing".<br />

I. First purge all air from the probe by flushing with P-I 0 gas. Because<br />

the presence of air in the probe chamber can cause erroneously<br />

successful test results, the noted purging procedure must be<br />

closely followed;<br />

a) For completed (myiar faced) probes. connect up the source of<br />

counting gas to one of the probe's fittings and an exhaust hose to the<br />

other allowing it to purge at a flow rate of 200 cc/min tor:<br />

]0429-A525/<strong>PCM</strong>-2 Oet. Voltage & Leak Test Procedure/Revision/March ]994