is selected. If desired, both inlets may be connected to the same gas source with<br />

a "T" fitting.<br />

Adjust the gas control to obtain a flow of 800 cc/minute as indicated by the<br />

second flowmeter (Note that the flow indication may require 2-3 minutes to<br />

stabilize. Do not permit the flow rate to exceed 1000 cc/min at any time).<br />

Maintain this rate for about 4 hours minimum to ensure that the detectors are fully<br />

purged, then decrease flow rate to 200 cc/minute as indicated by the first<br />

flowmeter. If the hand probe option is installed, a third flow meter is provided;<br />

purge this probe at 25 cc/minute for 1-2 hours, then decrease its flow to 5-10<br />

cc/minute for normal operation.<br />

If a gas manager is installed, refer to the Gas Management System (Option 12)<br />

portion of the Options Section for proper gas adjustment instructions.<br />

Accessing The<br />

Computer<br />

Either the front panel keypad or the main computer keyboard may be used to<br />

control the instrument, however for calibration it is suggested that the larger<br />

keyboard be deployed next to the CRT display. To access the computer, press the<br />

ESCAPE key, then type the high-level system password (default value = 9999)<br />

followed by the ENTER key. This will give access to the main menu.<br />

Using the four arrow keys, select the OVERRIDE PARAMETERS screen which<br />

is located under the EDIT heading of the main menu. Press the ENTER key to<br />

open this screen, and enter a typical high voltage setting for gas proportional<br />

detectors operating at your altitude, followed by ENTER. Press ESCAPE to<br />

leave this screen and store the new voltage setting. Use the arrow keys to select<br />

the BACKGROUND AVERAGES screen under the main menu DATA heading.<br />

Background count rates for all detectors will be displayed within 1-2 minutes and<br />

will be updated regularly thereafter. Once these values have stabilized, the unit is<br />

ready for calibration and gas flows may be reduced as described above.<br />

Before proceeding, use the arrow keys, ENTER and ESCAPE to navigate through<br />

the various menus and submenus of the <strong>PCM</strong>-2 program. Examine each screen<br />

and learn where various functions are located. Refer to the technical manual for<br />

explanations of anything which is unclear.<br />

Detector Voltage<br />

Selection<br />

Two high voltage plateau programs are provided, and it is recommended that both<br />

be run before the instrument is put into service. Both are selected from the<br />

CALIBRAnON menu.<br />

Due to the large number of detectors on the <strong>PCM</strong>-2, it is not practical to run a<br />

full voltage plateau on each. The BACKGROUND PLATEAU routine uses<br />

natural background radiation as a calibration source and can run all detectors at<br />

the same time. This test should be run over a wide range of voltages (typically<br />

2-6<br />