08.06.2015 Views

PCM-2 Manual.pdf - Voss Associates

PCM-2 Manual.pdf - Voss Associates

PCM-2 Manual.pdf - Voss Associates

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

------ ----------<br />

3, 19" lengths<br />

notes<br />

( <strong>PCM</strong>-2 Base Weldrne .. l, ref<br />

:: I i<br />

I I<br />

C) :<br />

0,,_1<br />

I I<br />

;;ii'"<br />

I I c' u<br />

I I C"-')<br />

I<br />

I<br />

III .".<br />

FRONT VIEW<br />

Film lake-up roll, see notes\<br />

,------------------------,<br />

'II Foot Detector I<br />

L ~<br />

Film supply<br />

Poly Film routinq<br />

FRONT VIEW enlarged<br />

NOTES'<br />

Apply 3 lengths of item 070, foam tope, equally spoced to item 010, roll core,<br />

providing the minimum spacing noted at each end of roll core. Then, wrap biock<br />

electrical tape around both ends of the foam lope and the roll core<br />

pl"oviding the minimum spacing of the<br />

tape from the roll core ends.<br />

Insert t'rHS expansion plug into one e:ld of item 101, roll core, and tighten the<br />

socket head screw until the plug expands to a secure fit within the roll core.<br />

Verify that the expansion plug and socket screw head ere not protruding from the<br />

end of the roll core.<br />

ROute the Film as shown onto the toke-up roll in order to trop ony contaminated<br />

paticles inside the roll.<br />

Poly Fjllll DjSjH1l1Sel' Assembly, <strong>PCM</strong>-2, 11534-D320, sheet J of 2.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!