08.06.2015 Views

KOROR STATE GOVERNMENT MARINE TOUR GUIDE ... - C3

KOROR STATE GOVERNMENT MARINE TOUR GUIDE ... - C3

KOROR STATE GOVERNMENT MARINE TOUR GUIDE ... - C3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sections 2401-11-39 through 2401-11-41 apply but are not limited to all facilities that, on<br />

September 29, 1994, were subject to the SPCC requirements of USEPA. This includes,<br />

but is not limited to all bulk petroleum product storage facilities within the Republic of<br />

Palau. (Effective May 26, 1996)<br />

2401-11-40 Definitions<br />

Unless specifically indicated otherwise, or unless the context clearly requires a different<br />

meaning, for the purposes of this Section,<br />

(A) "Owner or Operator" means any person owning or operating an on-shore facility or<br />

an off-shore facility, and, in the case of an abandoned facility, any person that owned or<br />

operated the facility immediately prior to abandonment.<br />

(B) "SPCC Plan" means the Spill Prevention Control and Countermeasure Plan required<br />

pursuant to 40 CFR Part 112. (Effective May 26, 1996)<br />

2401-11-41 SPCC Requirements<br />

(A) The SPCC Plan and oil spill requirements of 40 CFR Parts 110, 111 and 112 are<br />

hereby adopted by reference, except that the Board shall have the authority to take any<br />

action or impose any requirement that said Parts of the CFR authorize the Administrator<br />

to take or impose.<br />

(B) Any person that owns or operates any facility, whether off-shore or on-shore, shall<br />

complete, maintain, and, as either necessary or as required by the EQPB, revise the<br />

SPCC plan for that facility to the same extent required by 40 CFR Parts 110, 111 and<br />

112. (Effective May 26, 1996)<br />

164

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!