06.06.2015 Views

Soccer City Stadium, Johannesburg, South Africa - BAM International

Soccer City Stadium, Johannesburg, South Africa - BAM International

Soccer City Stadium, Johannesburg, South Africa - BAM International

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project<br />

<strong>Soccer</strong> <strong>City</strong> <strong>Stadium</strong>, <strong>Johannesburg</strong>,<br />

<strong>South</strong> <strong>Africa</strong><br />

The <strong>Soccer</strong> <strong>City</strong> <strong>Stadium</strong> in <strong>Johannesburg</strong> (formerly known as FNB <strong>Stadium</strong>) was identified to<br />

be upgraded as the main stadium for the 2010 FIFA World Cup (hosting, among others, both<br />

the opening and final matches). The calabash, or ‘<strong>Africa</strong>n pot’, was selected as the most<br />

recognisable object to inspire an architectural design representing the <strong>Africa</strong>n continent.<br />

One of the biggest challenges of the project was the structural integration of the existing<br />

western stand into the new stadium. The stadium now has a capacity of 89,000 seats.<br />

Location<br />

Client<br />

Contractor<br />

Contract period<br />

Contract sum<br />

<strong>Johannesburg</strong>, <strong>South</strong> <strong>Africa</strong><br />

<strong>City</strong> of <strong>Johannesburg</strong><br />

Joint venture Grinaker LTA/<strong>BAM</strong> <strong>International</strong> bv (formerly known as Interbeton)<br />

March 2007 – March 2010<br />

€ 315 million<br />

‘Technicolour calabash takes fifth place on the world capacity<br />

rankings for football stadiums.’<br />

January 2010<br />

000482-209


Scope of work<br />

The scope of work comprised the upgrading and extension of the old<br />

FNB stadium into an 89,000-seat modern stadium, including a partial<br />

demolition (75%) of the existing stadium. New offices and changing<br />

rooms were built, as well as a new players’ tunnel and a basement.<br />

The new roof was added with cladding all around and the installation<br />

of state-of-the-art lightning, Public Address systems and replay big<br />

screens were included in the contract.<br />

Façade and roof<br />

The façade of the stadium is made up of glass fibre reinforced<br />

concrete panels. With an arrangement of panels in eight different<br />

colour shades and two different textures, the façade reflects the<br />

shades and textures of the calabash.<br />

The upper roof is cantilevered from an enormous triangular spatial<br />

ring truss and covered by a PTFE membrane in a similar colour to<br />

that of the sand in <strong>Johannesburg</strong>’s old gold mines. A perforated mess<br />

membrane covers the bottom of the trusses, providing an appearance<br />

of a smooth underslung ceiling.<br />

Training centre<br />

Due to the critical skills shortage in the construction industry, the<br />

<strong>Soccer</strong> <strong>City</strong> project embarked on an extensive training initiative, which<br />

not only catered for the immediate needs of the project but also<br />

contributed to the development of skills levels in the local population.<br />

The training took place in a self-sustaining training centre nearby<br />

the site, which was set up in conjunction with a black economic<br />

empowerment (BEE) training provider and the Ministry of Labour.<br />

<strong>BAM</strong> <strong>International</strong> bv<br />

P.O. Box 414<br />

H.J. Nederhorststraat 1<br />

2800 AK Gouda<br />

The Netherlands<br />

T +31 (0)182 59 06 30<br />

F +31 (0)182 59 08 70<br />

E info@baminternational.nl<br />

I www.baminternational.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!