2005 - Putzmeister
2005 - Putzmeister
2005 - Putzmeister
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Large construction site<br />
42 43<br />
Numerous concrete pumps<br />
at Germany's largest<br />
construction site<br />
Since September 2004, the new Stuttgart<br />
Trade Fair Centre has been under construction<br />
at spellbinding speed, south of<br />
the regional capital of Baden-Württemberg<br />
between the A8 motorway, the B 27 main<br />
road and the airport. Several concrete<br />
pump service providers use their machines<br />
here almost every day. In order to ensure<br />
that concrete placement proceeds as<br />
smoothly as possible, the use of the many<br />
concrete pumps is scheduled centrally.<br />
motorway with direct access roads and<br />
Stuttgart International Airport, which is<br />
within sight of the complex.<br />
The contract for construction of the trade<br />
fair halls, the congress centre and the<br />
underground car park was awarded to the<br />
Rohbau Landesmesse consortium, consisting<br />
of MAX BÖGL and LEONHARD<br />
WEISS. The two partners have also joined<br />
forces to create a civil engineering consortium,<br />
which will construct two bypass tunnels<br />
– one near the airport and one on the<br />
north side of the A8 – as well as a bridge.<br />
The parking decks of the new Stuttgart<br />
Trade Fair Centre stretch across the A8<br />
motorway – here is a model view<br />
(Fig.: Projektgesellschaft Neue Messe)<br />
By its opening in spring 2007, seven standard<br />
halls with an exhibition area of<br />
10,000 m 2 each, a 25,000 m 2 tall building<br />
(headroom of 14 to 24 m), an international<br />
congress centre and a generously proportioned<br />
convention centre will be constructed<br />
here on a total area of 83 hectares.<br />
Optimal transport connections will be<br />
ensured by a planned ICE long distance<br />
and regional train station, an underground<br />
car park beneath the convention centre, the<br />
new multi-storey car park over the A8<br />
Another consortium consisting of WAYSS<br />
& FREYTAG INGENIEURBAU,<br />
BARESEL and DONGES STAHLBAU,<br />
has been awarded the contract for completion<br />
of the new multi-storey car park,<br />
which, at a length of 440 m, spans across<br />
the A8 motorway and a planned new<br />
stretch of ICE track. The total investment<br />
for the new Stuttgart Trade Fair Centre is<br />
estimated at EUR 806 million. The project<br />
is currently considered to be Germany's<br />
biggest construction site.<br />
41<br />
44<br />
A <strong>Putzmeister</strong> M 52-5 large boom pump during concreting of the foundations<br />
16<br />
PM 3723 GB<br />
Photo: AOP aerial photo<br />
Until recently, the fields on which the new trade fair premises are now being constructed,<br />
were intensively farmed for pointed cabbage – a regional speciality<br />
45<br />
17<br />
PM 3723 GB