25.05.2015 Views

Preparing for an ACGME Site Visit Workshop PPT Slides

Preparing for an ACGME Site Visit Workshop PPT Slides

Preparing for an ACGME Site Visit Workshop PPT Slides

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PREPARING THE PIF<br />

Timeline:<br />

<strong>Site</strong> <strong>Visit</strong> July 1<br />

• Notification from RRC: 110-120 days March 1<br />

• <strong>Site</strong> visitor sends instructions March 8<br />

• <strong>Site</strong> visitor: 2 weeks be<strong>for</strong>e site visit June 15<br />

• DIO: 3 weeks be<strong>for</strong>e site visit June 8<br />

• Final PIF: 4-6 weeks be<strong>for</strong>e site visit June 1<br />

• First draft: 2-3 months be<strong>for</strong>e site visit April 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!