CONFIGUR<strong>AT</strong>ION OF THE PROPOSED POWER PLANT<br />
INTRODUCTION<br />
SEL has been in the process of discussions with variious companies world wide<br />
over the technical configurations, which would be the most appropriate for the<br />
proposed power plant. The objective of these discussions has been to decide on<br />
the configuration, suitable for Indian conditions for it’s operational economics as<br />
well as for the simplicity of design. The plant configuration finally decided <strong>up</strong>on<br />
is described as under.<br />
PROCESS PLANT CONFIGUR<strong>AT</strong>ION<br />
Out of various options offered by various vendors, which were thoughfully<br />
perused for the consideration towards the optimum capital cost of the project, the<br />
availability of land and the locational logistic, it was decided to <strong>set</strong>-<strong>up</strong> two parallel<br />
trains in a phase manner. <strong>To</strong> start with the power plant in it’s first phase of<br />
implementation would be further augmented, integrated and optimized in the<br />
second phase of the project with the installation of the second train.<br />
It is further considered that the construction of the civil foundations and other<br />
s<strong>up</strong>port structures for the installation of the second modular train would also be got<br />
constructed and kept ready during he implementation of the first phase of the<br />
project itself. This way the plant in operation would experience least disturbance<br />
during the installation of the plant and machinery for second phase whenever<br />
executed.