23.05.2015 Views

PROJECT AT A GLANCE i. Project : To set up a 280 MW Gas Based ...

PROJECT AT A GLANCE i. Project : To set up a 280 MW Gas Based ...

PROJECT AT A GLANCE i. Project : To set up a 280 MW Gas Based ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The laboratory has been regularly participating in Analytical Quality Control<br />

(AQC) exercises conducted annually by Central Pollution Control Board (CPCB).<br />

The result rank us amongst the top twenty (on a scale of 100) environmental<br />

laboratories in the country.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!