<strong>Belimo</strong> <strong>VRD2</strong><br />

Supply/Extract Air Slave Control<br />

for Dual Duct Unit TVM<br />

Commissioning Signal<br />

Adjuster ZEV Connections<br />

Room temperature<br />

controller<br />

Cold duct controller <strong>VRD2</strong><br />

Warm duct controller <strong>VRD2</strong><br />

Slave controller<br />

<strong>VRD2</strong> (NMV-D2)<br />

Operating mode S<br />

Room temperature<br />

controller<br />

Operating mode M, F<br />

Room Temperature<br />

controller, switch<br />

cabinet or step<br />

distributor<br />

11<br />

Volume Flow Control of TVM Units<br />

The two controllers fitted to the dual duct unit TVM (cold,<br />

warm) must be wired by the customer as shown in the<br />

circuit diagram opposite (including the 24 VAC/VDC<br />

cross-connection).<br />

The room temperature controller provides the cold duct<br />

controller with its set point signal.<br />

In most cases, the proportion of warm air is increased<br />

from 0 to the required V · warm as a maximum set point.<br />

The warm duct controller (V · total is measured) is therefore<br />

set as a constant value controller and does not require<br />

a control signal.<br />

For a more detailed functional description, refer to the<br />

TVM literature.<br />

Supply/Extract Air Slave Control with<br />

Dual Duct TVM<br />

The actual value output signal U5 of the warm duct controller<br />

is proportional to the total volume flow V · total. It<br />

can therefore be used as the control signal for a slave<br />

controller.<br />

Commissioning Connections<br />

It is advisable that the signal line for connecting the adjuster<br />

ZEV is linked up in an easily accessible location.<br />

This means that ceiling panels do not need be removed<br />

in order to take measurements.<br />

Suitable locations include: spare terminals in room temperature<br />

controller or wall mounted enclosure.<br />

It is important to ensure that the ground (and 24 V) is also<br />

available. Therefore, a 3-wire connection is required to<br />

the commissioning point connection.<br />

IMPORTANT<br />

The commissioning connection will also work if the U5 signal is used for slave circuits or monitoring. However,<br />

the U5 signal differs from the actual value when the ZEV<br />

unit is connected.<br />

ZEV Function<br />

The indicating lights come on when the control knob<br />

settings match the current values. To adjust the control<br />

mode, set the mode knob, for example to 0 - 10 VDC,<br />

and press the Set button. The volume settings can only<br />

be read.