Non-Finito - ACES
Non-Finito - ACES Non-Finito - ACES
CFRP Column Wrapping 1995 XXSYS Technologies, Frieder Seible et all.
Active column wrapping
- Page 27 and 28: Efficiency 300 250 Capacity [kN] 20
- Page 29 and 30: Creep experiments
- Page 31 and 32: Cross section of T-Beam
- Page 33 and 34: Cross section of T-Beam
- Page 35 and 36: Cross section of T-Beam
- Page 37 and 38: Shear strengthening
- Page 40 and 41: Cable dredger
- Page 42 and 43: Juli 2009
- Page 44: Roof truss of church Homberg-Efze D
- Page 47: Seismic retrofitting of masonry wal
- Page 57 and 58: The Dome of Pavia lantern 62 m 41 m
- Page 59 and 60: Selected Problems of Dome possible
- Page 61 and 62: Solution possible concept for rehab
- Page 63 and 64: Worldwide thousands of columns need
- Page 65 and 66: CFRP wrapping of rectangular column
- Page 67 and 68: Active column wrapping woven fabric
- Page 69 and 70: Active column wrapping woven fabric
- Page 71 and 72: Active column wrapping injecting po
- Page 73 and 74: Active column wrapping injecting po
- Page 75: Active column wrapping Mark Green,
- Page 80 and 81: Mark Green, Olav Huth, Andreas Wini
- Page 82 and 83: Dr. Hanspeter Kaiser (1989) Prof. D
- Page 84: Pre-tensioning equipment Type: tens
- Page 89 and 90: Verification experiment Christoph C
- Page 91: Mechanised and computer-controlled
- Page 94 and 95: 5 hours ≡ 1.45 m 5 hours ≡ 1.45
- Page 96 and 97: Pre-tensioned CFRP strips • Why s
- Page 98 and 99: Heritage structures: Post-tensionin
- Page 100 and 101: Heritage structures: Post-tensionin
- Page 102 and 103: Hagia Sophia, Istanbul since 641 pr
- Page 104 and 105: Airbags save lives in the automotiv
- Page 106 and 107: Hagia Sophia, Istanbul high risk zo
- Page 108 and 109: Hagia Sophia, Istanbul crosshead U-
- Page 110 and 111: Hagia Sophia, Istanbul
- Page 112 and 113: 1943: to avoid another “Tacoma-Ca
- Page 114 and 115: Bronx-Whitestone Bridge 1943, insta
- Page 116 and 117: Some Problems with Suspension Bridg
- Page 118 and 119: 2003: GFRP-Wind Fairings Cable Susp
- Page 120 and 121: Net weight “loss” of 5’600 to
- Page 122 and 123: What happens when another 20% is go
- Page 124 and 125: What if we get to-morrow a contract
- Page 126 and 127: Hanger-/Main-Cable Connection Humbe
CFRP Column Wrapping 1995<br />
XXSYS Technologies, Frieder Seible et all.