Non-Finito - ACES
Non-Finito - ACES Non-Finito - ACES
Strain versus load 1.6 1.4 1.2 Strain [%] 1 0.8 0.6 0.4 0.2 Layer 10 Layer 6 Layer 4 Layer 2 Layer 1 0 0 5 10 15 20 25 30 Load [kN] Andreas Winistörfer
Efficiency 300 250 Capacity [kN] 200 150 100 50 0 1 10 20 30 40 50 60 70 Andreas Winistörfer Number of layers [N]
- Page 1 and 2: To help protect your privacy, Power
- Page 3 and 4: Non-Finito = simply uncompleted wor
- Page 5 and 6: Outline • The Past • The Presen
- Page 7 and 8: Corrosion built in 1912 strengthene
- Page 9 and 10: Strengthening with CFRP • light
- Page 11 and 12: Ibach bridge 1991 CFRP strips are g
- Page 13 and 14: Patience, patience, patience ……
- Page 15 and 16: CFRP wires and strips • very high
- Page 17 and 18: Stork bridge 1996 (124 m span, 2 la
- Page 19 and 20: Laminated CFRP strap
- Page 21 and 22: Laminated CFRP strap
- Page 23 and 24: Relative strength vs. radii ro 0.80
- Page 25: σ // σ ⊥ τ //⊥ non-laminated
- Page 29 and 30: Creep experiments
- Page 31 and 32: Cross section of T-Beam
- Page 33 and 34: Cross section of T-Beam
- Page 35 and 36: Cross section of T-Beam
- Page 37 and 38: Shear strengthening
- Page 40 and 41: Cable dredger
- Page 42 and 43: Juli 2009
- Page 44: Roof truss of church Homberg-Efze D
- Page 47: Seismic retrofitting of masonry wal
- Page 57 and 58: The Dome of Pavia lantern 62 m 41 m
- Page 59 and 60: Selected Problems of Dome possible
- Page 61 and 62: Solution possible concept for rehab
- Page 63 and 64: Worldwide thousands of columns need
- Page 65 and 66: CFRP wrapping of rectangular column
- Page 67 and 68: Active column wrapping woven fabric
- Page 69 and 70: Active column wrapping woven fabric
- Page 71 and 72: Active column wrapping injecting po
- Page 73 and 74: Active column wrapping injecting po
- Page 75: Active column wrapping Mark Green,
Efficiency<br />
300<br />
250<br />
Capacity [kN]<br />
200<br />
150<br />
100<br />
50<br />
0<br />
1 10 20 30 40 50 60 70<br />
Andreas Winistörfer<br />
Number of layers [N]