Non-Finito - ACES
Non-Finito - ACES Non-Finito - ACES
„Structural Wallpaper“, daily business In average 20% cheaper due to less labor hours
Patience, patience, patience ……….. 160 140 120 100 80 60 40 first idea feasibility o.k. tons of CFRP in CH 1982 1987 0 20 1991 1993 1995 1997 1999 2001 13 years
- Page 1 and 2: To help protect your privacy, Power
- Page 3 and 4: Non-Finito = simply uncompleted wor
- Page 5 and 6: Outline • The Past • The Presen
- Page 7 and 8: Corrosion built in 1912 strengthene
- Page 9 and 10: Strengthening with CFRP • light
- Page 11: Ibach bridge 1991 CFRP strips are g
- Page 15 and 16: CFRP wires and strips • very high
- Page 17 and 18: Stork bridge 1996 (124 m span, 2 la
- Page 19 and 20: Laminated CFRP strap
- Page 21 and 22: Laminated CFRP strap
- Page 23 and 24: Relative strength vs. radii ro 0.80
- Page 25 and 26: σ // σ ⊥ τ //⊥ non-laminated
- Page 27 and 28: Efficiency 300 250 Capacity [kN] 20
- Page 29 and 30: Creep experiments
- Page 31 and 32: Cross section of T-Beam
- Page 33 and 34: Cross section of T-Beam
- Page 35 and 36: Cross section of T-Beam
- Page 37 and 38: Shear strengthening
- Page 40 and 41: Cable dredger
- Page 42 and 43: Juli 2009
- Page 44: Roof truss of church Homberg-Efze D
- Page 47: Seismic retrofitting of masonry wal
- Page 57 and 58: The Dome of Pavia lantern 62 m 41 m
- Page 59 and 60: Selected Problems of Dome possible
- Page 61 and 62: Solution possible concept for rehab
Patience, patience, patience ………..<br />
160<br />
140<br />
120<br />
100<br />
80<br />
60<br />
40<br />
first idea<br />
feasibility o.k.<br />
tons of CFRP in CH<br />
1982 1987<br />
0<br />
20<br />
1991 1993 1995 1997 1999 2001<br />
13 years