m - ACES
m - ACES
m - ACES
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
62<br />
Axial stress in concrete bottom slab – continuity support section<br />
0,00<br />
0 50 100 150 200 250 300 350 400<br />
Axial stress [MPa]<br />
Tensioni Normali [MPa]<br />
-1,00<br />
-2,00<br />
-3,00<br />
-4,00<br />
-5,00<br />
-6,00<br />
-7,00<br />
-8,00<br />
-9,00<br />
Tiro Internal dei cavi tendons interni<br />
prestressing<br />
First 50% of external<br />
Tiro prestressing dei cavi esterni on central<br />
campate spans centrali (50%)<br />
First Tiro 50% dei cavi of external esterni<br />
Ritesatura Second 50% cavi esterni of external<br />
prestressing campate on laterali (50%) spans<br />
prestressing everywhere<br />
Applicazione Permanent loads carichi<br />
permanenti introduction portati<br />
Tempi [gg]<br />
Time [days]