60<br />
Axial stress in concrete top slab – continuity support section<br />
0,00<br />
0 50 100 150 200 250 300 350 400<br />
-2,00<br />
Tiro Internal dei cavi tendons interni<br />
prestressing<br />
Axial stress [MPa]<br />
Tensioni Normali [MPa]<br />
-4,00<br />
-6,00<br />
-8,00<br />
-10,00<br />
-12,00<br />
Tiro First dei 50% cavi of esterni external<br />
campate prestressing laterali (50%) on<br />
lateral spans<br />
Applicazione Permanent loads carichi<br />
permanenti introduction portati<br />
First 50% of external<br />
Tiro dei cavi esterni Second 50% of external<br />
prestressing on central Ritesatura cavi esterni<br />
campate spans centrali (50%) prestressing everywhere<br />
Tempi [gg]<br />
Time [days]