60<br />

Axial stress in concrete top slab – continuity support section<br />

0,00<br />

0 50 100 150 200 250 300 350 400<br />

-2,00<br />

Tiro Internal dei cavi tendons interni<br />

prestressing<br />

Axial stress [MPa]<br />

Tensioni Normali [MPa]<br />

-4,00<br />

-6,00<br />

-8,00<br />

-10,00<br />

-12,00<br />

Tiro First dei 50% cavi of esterni external<br />

campate prestressing laterali (50%) on<br />

lateral spans<br />

Applicazione Permanent loads carichi<br />

permanenti introduction portati<br />

First 50% of external<br />

Tiro dei cavi esterni Second 50% of external<br />

prestressing on central Ritesatura cavi esterni<br />

campate spans centrali (50%) prestressing everywhere<br />

Tempi [gg]<br />

Time [days]