Form No. 1 Application for Building Permission - TIRUPATHI ...
Form No. 1 Application for Building Permission - TIRUPATHI ...
Form No. 1 Application for Building Permission - TIRUPATHI ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Form</strong> <strong>No</strong>. 1 <strong>Application</strong> <strong>for</strong> <strong>Building</strong> <strong>Permission</strong><br />
Tirupati Urban Development Authority<br />
APUD Act 1975 (Under Section 13 & 14) <strong>Form</strong><br />
<strong>No</strong>: __________<br />
Serial<br />
To<br />
Vice Chairman<br />
Urban Development Authority<br />
Tirupati<br />
Sir<br />
I/We hereby apply <strong>for</strong> Development <strong>Permission</strong> in T S <strong>No</strong>. / R S <strong>No</strong>. in ______________<br />
Mandal/ _________ Gram Panchayat / Municipality / Municipal Council.<br />
The names of the persons employed by me <strong>for</strong> the preparation of plans, structural details<br />
and supervision of works are as under:<br />
1 Registered Architect:/Engineer<br />
___________________________<br />
2 Structural reports, details and drawings by:<br />
___________________________<br />
I/We have read the General Development Control Regulations framed by the Authority<br />
and shall fulfill my duties and responsibilities in accordance with the provisions of the<br />
Relations.<br />
Name, address of the Owner/Applicant/:<br />
__________________________<br />
Developer<br />
__________________________<br />
__________________________<br />
Signature of the Owner/Applicant/:<br />
_________________________<br />
Developer<br />
Date:<br />
_________________________
Declaration by Engineer/Surveyor/Architect<br />
1 I have certified the ownership document and it is in confirmation with the Site<br />
Plan<br />
2 I have inspected the site on____________ date _____________ and the<br />
applicant/party started construction and completed up to Basement level/Lintel<br />
level/Floor level/ the party has not commenced construction.<br />
3 After construction of building I will submit a completion certificate that the<br />
applicant has constructed the building as per rules/regulations.<br />
4 I certify that the above statements are correct. If found otherwise my security<br />
deposit may be <strong>for</strong>feited and my license may be revoked / cancelled<br />
Name, address of the Licensed Architect/:<br />
__________________________<br />
Engineer / Surveyor / Planner<br />
__________________________<br />
__________________________<br />
__________________________<br />
Signature of the Licensed Architect/:<br />
_________________________<br />
Engineer / Surveyor / Planner<br />
Date:<br />
_________________________<br />
Enclosed<br />
1 Location Plan<br />
2 Site Plan<br />
3 Sub Division/Layout Plan<br />
4 <strong>Building</strong> Plan<br />
5 Topo Plan<br />
6 Title deed/Ownership<br />
7 Receipt of the Scrutiny Fee (Calculated as per Regulation 4.3)<br />
8 Receipt of Development Charges (Calculated as per Regulation 4.3)