Tirupathi Urban Development Authority<br />

4.6 Extension of Bid Validity period<br />

4.6.1 In exceptional circumstances, prior to expiry of the original Bid Validity Period, TUDA may<br />

request the Bidders to extend the period of validity for a specified additional period. The<br />

request and the Bidders’ responses shall be made in writing. TUDA reserves the right to<br />

reject the Bid submitted by any Bidder who fails to extend the period of validity of its Bid<br />

in line with the provisions of this Section. A Bidder accepting TUDA’s request for<br />

extension of validity shall not be permitted to modify his Bid in any other respect.<br />

4.6.2 The Bid Validity Period of the Selected Developer shall be automatically extended till the<br />

date on which the Development Agreement is signed and is in force.<br />

4.7 Project Inspection and Site Visits<br />

The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine<br />

the site of Project and its surroundings and obtain all information that may be necessary<br />

for preparing the Proposal. The costs of visiting the site shall be borne by the Bidder.<br />

TUDA shall not be liable for such costs, regardless of the outcome of the Bidding<br />

process.<br />

4.8 Bidders’ Responsibilities<br />

4.8.1 The Bidder is expected to examine carefully the contents of all the documents provided.<br />

Failure to comply with the requirements of RFP will be at the Bidders’ own risk.<br />

4.8.2 It would be deemed that prior to the submission of the Bid, the Bidder has:<br />

(i) Made a complete and careful examination of requirements and other information set<br />

forth in this RFP;<br />

(ii) Received all such relevant information as it has requested from TUDA; and<br />

(iii) Made a complete and careful examination of the various aspects of the Project<br />

including but not limited to:<br />

(a) The Project site<br />

(b) Existing facilities and structures<br />

(c) The conditions of the access roads and utilities in the vicinity of the Project<br />

site<br />

(d) Conditions affecting transportation, access, disposal, handling and storage of<br />

the materials.<br />

(e) Availability of land for the Project; and<br />

(f) All other matters that might affect the Bidder’s performance under the terms<br />

of this RFP.<br />

4.8.3 TUDA shall not be liable for any mistake or error or neglect by the Bidder in respect of the<br />

above.<br />

Request For Proposal<br />

Development of Integrated Tourism Temple Township on Public Private Partnership Basis<br />