Tirupathi Urban Development Authority<br />

2. The Bank Guarantee issued by a Cooperative Bank shall not be accepted<br />

4.4.3 The Bid Security along with the unopened Covers shall be returned to the Bidders whose<br />

Bids are found to be Non-Responsive, or whose Bids are not Technically and Financially<br />

Capable, or whose Techno-Business Proposal is not found to meet the threshold level<br />

set by TUDA. The Bid Security and unopened Cover 1, Cover 2 and Cover 3 of those<br />

Bidders whose Other Submissions get rejected will be returned within a period of 28 days<br />

from the date of intimation of such rejection. The Bid Security and unopened Cover 2 and<br />

Cover 3 of those Bidders whose Qualification Proposal gets rejected will be returned<br />

within a period of 28 days from the date of intimation of such rejection. The Bid Security<br />

and Cover 3 of those Bidders, whose Techno-Business Proposal doesn’t meet the<br />

minimum threshold during detailed technical evaluation, will be returned within a period of<br />

28 days from the date of intimation of such rejection. Notwithstanding anything contrary<br />

provided in instructions elsewhere to Bidders, on issue of the Letter of Award by TUDA,<br />

the validity of the Bid Security of the the top 3 (three) Bidders ranked on the basis of their<br />

Commercial Offers, shall be automatically extended till the date on which the<br />

Development Agreement is signed. The Bid Security shall be returned, subject to the<br />

provisions of this Section to the other unsuccessful Bidders within a period of 56 (fifty six)<br />

days from the Evaluation Date. Provided however, that the bid security of the Bidder who<br />

submitted the Preferred Proposal as determined on the opening of the Commercial Offer,<br />

as well as that of the next two Bidders ranked on the basis of their Commercial Offers,<br />

shall be returned by TUDA after the date of execution of the Development Agreement. In<br />

addition to the above, TUDA will promptly release all Bid Securities in the event TUDA<br />

decides to terminate the bidding proceedings or abandon the Project.<br />

4.4.4 TUDA shall reject the Bid, which does not include the Bid Security.<br />

4.4.5 The entire Bid Security shall be forfeited in the following cases:<br />

(i) If the Bidder withdraws its Bid except as provided in Section 4.13;<br />

(ii) If the Bidder withdraws its Bid during the interval between the Bid Due Date and<br />

expiration of the Bid Validity Period;<br />

(iii) If the Bidder, during Bid Validity Period, in TUDA’s opinion, commits a material<br />

breach of any of the terms and / or conditions contained in the RFP and/ or<br />

subsequent communication from TUDA in this regard;<br />

(iv) If the Selected Developer refuses to accept the Letter of Award;<br />

(v) If the Selected Developer or the Project Company fails to meet its financial<br />

obligations to TUDA under the Development Agreement within the stipulated time or<br />

any extension thereof provided by TUDA;<br />

(vi) As per the provisions of the Development Agreement.<br />

4.5 Bid Validity period<br />

Proposal shall remain valid for a period not less than 280 days from the Bid Due Date.<br />

TUDA reserves the right to reject any Proposal, which does not meet the requirement.<br />

Request For Proposal<br />

Development of Integrated Tourism Temple Township on Public Private Partnership Basis<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!