Chapter 4.<br />

Experimental Procedures and Protocols for Analyses<br />

1.4.2.1 Preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Die<br />

<br />

<br />

<strong>The</strong> base must be placed <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> bench top. It must be carefully checked that <str<strong>on</strong>g>the</str<strong>on</strong>g> bottom O-Ring seal<br />

is properly positi<strong>on</strong>ed in its groove. <strong>The</strong> body is assembled <strong>on</strong> base.<br />

One <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> metallic pellets was carefully placed, polished face up and a polyimide circular film was<br />

placed in <str<strong>on</strong>g>the</str<strong>on</strong>g> bore <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> body. <strong>The</strong> evacuati<strong>on</strong> tube was c<strong>on</strong>nected to a vacuum pump capable <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

providing a pressure <str<strong>on</strong>g>of</str<strong>on</strong>g> less than two mm Hg. If vacuum setup is not available <str<strong>on</strong>g>the</str<strong>on</strong>g>n manual<br />

CARVER hydraulic press is used for compressi<strong>on</strong>.<br />

1.4.2.2 Loading <str<strong>on</strong>g>the</str<strong>on</strong>g> Die<br />

<br />

<br />

Using a funnel, <str<strong>on</strong>g>the</str<strong>on</strong>g> powder mixture is poured into <str<strong>on</strong>g>the</str<strong>on</strong>g> bore <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> body. <strong>The</strong> side <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> die is tapped<br />

lightly to be sure that <str<strong>on</strong>g>the</str<strong>on</strong>g> powder is evenly distributed. Completely even powder distributi<strong>on</strong> is<br />

accomplished by inserting <str<strong>on</strong>g>the</str<strong>on</strong>g> plunger into <str<strong>on</strong>g>the</str<strong>on</strong>g> bore and rotating it lightly a few times. <strong>The</strong> plunger<br />

is <str<strong>on</strong>g>the</str<strong>on</strong>g>n withdrawn slowly.<br />

A sec<strong>on</strong>d metallic pellet is inserted, polished face down, into <str<strong>on</strong>g>the</str<strong>on</strong>g> upper half <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> bore followed by<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> plunger. If more than <strong>on</strong>e pellet is required, a polyimide film is put <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> metallic pellet and<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g>n powder <strong>on</strong> it. <strong>The</strong> procedure is repeated till 3 sample pellets are required. One must be sure that<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> top O-Ring seal is in place around <str<strong>on</strong>g>the</str<strong>on</strong>g> plunger and properly seated in <str<strong>on</strong>g>the</str<strong>on</strong>g> chamber.<br />

1.4.2.3 Processing <str<strong>on</strong>g>the</str<strong>on</strong>g> Pellets<br />

<br />

<br />

<br />

<strong>The</strong> die assembly must be placed in <str<strong>on</strong>g>the</str<strong>on</strong>g> hydraulic press. Without applying pressure, <str<strong>on</strong>g>the</str<strong>on</strong>g> die must be<br />

evacuated for 2 - 5 minutes (depending <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> dryness <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> sample).<br />

With c<strong>on</strong>tinued evacuati<strong>on</strong>, 150 bars pressure is applied to <str<strong>on</strong>g>the</str<strong>on</strong>g> die for 20 minutes and <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

temperature (45−60 o C) is maintained as per requirement.<br />

<strong>The</strong> pressure is released slowly and <str<strong>on</strong>g>the</str<strong>on</strong>g> vacuum removed.<br />

1.4.2.4 Removing <str<strong>on</strong>g>the</str<strong>on</strong>g> Pellets<br />

<br />

<br />

<strong>The</strong> base is removed from <str<strong>on</strong>g>the</str<strong>on</strong>g> body leaving <str<strong>on</strong>g>the</str<strong>on</strong>g> plunger in positi<strong>on</strong>.<br />

<strong>The</strong> assembly is inverted <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> plate <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> hydraulic press and <str<strong>on</strong>g>the</str<strong>on</strong>g> polycarb<strong>on</strong>ate ring is placed <strong>on</strong><br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> centre <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> body opposite <str<strong>on</strong>g>the</str<strong>on</strong>g> plunger end. Using <str<strong>on</strong>g>the</str<strong>on</strong>g> hydraulic press, pressure is applied<br />

slowly until <str<strong>on</strong>g>the</str<strong>on</strong>g> plunger moves <str<strong>on</strong>g>the</str<strong>on</strong>g> lower pellet and disc clear <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> bore.<br />

In <str<strong>on</strong>g>the</str<strong>on</strong>g> preliminary experiments polymer powders <str<strong>on</strong>g>of</str<strong>on</strong>g> ~ 0.150 g <str<strong>on</strong>g>of</str<strong>on</strong>g> weight have been moulded by<br />

compressi<strong>on</strong> at 150 bars and 60°C for 20 minutes. Our compressi<strong>on</strong> moulding setup has initially allowed 3<br />

pellets <str<strong>on</strong>g>of</str<strong>on</strong>g> polymer to be prepared simultaneously. Finally, pellets have a thickness <str<strong>on</strong>g>of</str<strong>on</strong>g> 0.9 − 1.1 mm. In order<br />

to prepare pellets in bulk quantity, a modified procedure is fur<str<strong>on</strong>g>the</str<strong>on</strong>g>r adopted. We prepare 12, 15 or 18 pellets,<br />

by varying <str<strong>on</strong>g>the</str<strong>on</strong>g> weight <str<strong>on</strong>g>of</str<strong>on</strong>g> polymer powder taken into account, in <strong>on</strong>e batch by using polyimide film as shown<br />

in Figure 4.9-d.<br />

1.5 Preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Pellets by Wet Method<br />

In <str<strong>on</strong>g>the</str<strong>on</strong>g> wet method, pellets have been prepared by dissolving composite powder in a good solvent<br />

(acet<strong>on</strong>e or chlor<str<strong>on</strong>g>of</str<strong>on</strong>g>orm). Polymer and filler powder have been ground by knife mill, tumbling ball mill and<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g>n sieving as described earlier. <strong>The</strong> soluti<strong>on</strong> mixture is heated for minimum 10 minutes in a water bath at<br />

temperature 5 o C above <str<strong>on</strong>g>the</str<strong>on</strong>g> polymer or composite T g . When <str<strong>on</strong>g>the</str<strong>on</strong>g> soluti<strong>on</strong> mixture becomes homogenous, it is<br />

- 93 -