14.05.2015 Views

WIG20 futures contracts with a multiplier of PLN 20 - GPW

WIG20 futures contracts with a multiplier of PLN 20 - GPW

WIG20 futures contracts with a multiplier of PLN 20 - GPW

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

THE WARSAW STOCK EXCHANGE<br />

<strong>WIG<strong>20</strong></strong> FUTURES CONTRACTS WITH A MULTIPLIER OF <strong>PLN</strong> <strong>20</strong><br />

-1-


Changes to <strong>WIG<strong>20</strong></strong> Futures Contracts<br />

The WSE is planning to introduce <strong>WIG<strong>20</strong></strong> <strong>futures</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong><br />

<strong>20</strong> into trading on the exchange on 23 September <strong>20</strong>13<br />

<strong>WIG<strong>20</strong></strong> <strong>futures</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> will replace currently listed<br />

<strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10<br />

This presentation explains how existing <strong>contracts</strong> will be replaced <strong>with</strong> new<br />

<strong>contracts</strong> and what are the advantages <strong>of</strong> the change<br />

The above date <strong>of</strong> the introduction <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> into trading is the scheduled date. The actual<br />

date <strong>of</strong> the introduction <strong>of</strong> the new instruments will be determined in the relevant resolution <strong>of</strong> the Exchange Management<br />

Board which will be published on the WSE website. The timeline <strong>of</strong> the replacement <strong>of</strong> <strong>contracts</strong> shown in the presentation<br />

assumes that the process will begin on 23 September <strong>20</strong>13.<br />

-2-


What Is a Multiplier?<br />

WIG <strong>20</strong> <strong>futures</strong> <strong>contracts</strong> are listed in index points. In order to determine the value<br />

<strong>of</strong> a contract, it is necessary to determine the value <strong>of</strong> an index point. This value is<br />

determined by the <strong>multiplier</strong> <strong>of</strong> a contract.<br />

Currently the WSE lists <strong>WIG<strong>20</strong></strong> <strong>futures</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10<br />

In September <strong>20</strong>13, the WSE is planning to introduce <strong>futures</strong> <strong>contracts</strong> <strong>with</strong> a<br />

<strong>multiplier</strong> which will be double the existing <strong>multiplier</strong> and equal to <strong>PLN</strong> <strong>20</strong><br />

-3-


How to Determine Contract Value?<br />

To determine the value <strong>of</strong> a <strong>WIG<strong>20</strong></strong> <strong>futures</strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong>,<br />

multiply the price <strong>of</strong> the <strong>futures</strong> <strong>contracts</strong> by <strong>PLN</strong> <strong>20</strong><br />

The value <strong>of</strong> a <strong>WIG<strong>20</strong></strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> will be double the value <strong>of</strong><br />

a <strong>WIG<strong>20</strong></strong> <strong>futures</strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10<br />

Example<br />

Price <strong>of</strong> a <strong>WIG<strong>20</strong></strong> contract = 2,300 index points<br />

Value <strong>of</strong> a <strong>WIG<strong>20</strong></strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 = <strong>PLN</strong> 23,000<br />

Value <strong>of</strong> a <strong>WIG<strong>20</strong></strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> = 46,000<br />

-4-


What Will Be the Amount <strong>of</strong> Margins?<br />

A higher value <strong>of</strong> a <strong>futures</strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> implies* higher<br />

margins.<br />

Ask your brokerage house about the amount <strong>of</strong> margins on<br />

<strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong><br />

*Day traders should ask their brokers about intraday margins. Intraday margins are lower than margins on<br />

positions that are not closed <strong>with</strong>in the trading session. Some brokerage houses <strong>of</strong>fer or are planning to <strong>of</strong>fer<br />

intraday margins.<br />

-5-


What Will Be the Tick Value?<br />

The tick <strong>of</strong> a <strong>WIG<strong>20</strong></strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 is 1 index point and the tick<br />

value is <strong>PLN</strong> 10.<br />

For <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong>, the tick is also 1 index point but the<br />

tick value is double the existing tick value and equal to <strong>PLN</strong> <strong>20</strong><br />

Any change in the price <strong>of</strong> new <strong>contracts</strong> by 1 index point will imply<br />

a GAIN* or LOSS* <strong>of</strong> <strong>PLN</strong> <strong>20</strong> to the investor<br />

* gross gain/loss net <strong>of</strong> transaction fees<br />

-6-


What Will Be the Transaction Fee?<br />

The transaction fee charged by the WSE to Exchange Members (brokerage houses)<br />

on trading in <strong>WIG<strong>20</strong></strong> <strong>futures</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> will be the same as<br />

the fee charged on trading in <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10<br />

Clients <strong>of</strong> brokerage houses should ask their broker<br />

about the amount <strong>of</strong> commissions on trading in<br />

<strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong><br />

-7-


Advantages <strong>of</strong> the New Multiplier (1)<br />

The key advantage <strong>of</strong> new <strong>contracts</strong> is the tick value, which is double that <strong>of</strong><br />

currently listed <strong>contracts</strong><br />

The tick value <strong>of</strong> existing <strong>futures</strong> <strong>contracts</strong> is <strong>PLN</strong> 10 and that <strong>of</strong> new <strong>contracts</strong> will<br />

be <strong>PLN</strong> <strong>20</strong><br />

Assuming that commissions charged by brokers to clients will remain unchanged,<br />

many investors will for the first time be able to make gains on change <strong>of</strong><br />

the contract price by only one tick<br />

-8-


Advantages <strong>of</strong> the New Multiplier (2)<br />

Example<br />

The commission per contract is <strong>PLN</strong> 6<br />

Consequently, the commission for opening and closing a position in one contract is<br />

<strong>PLN</strong> 12 (i.e., <strong>PLN</strong> for opening + <strong>PLN</strong> 6 for closing <strong>of</strong> the position)<br />

If the price <strong>of</strong> a <strong>WIG<strong>20</strong></strong> contract <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> changes by 1 index<br />

point in the direction expected by the investor, the investor will gain <strong>PLN</strong> 8 (<strong>PLN</strong> <strong>20</strong><br />

– <strong>PLN</strong> 12)<br />

For <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10, a change <strong>of</strong> the contract price by 1<br />

index point does not <strong>of</strong>fset the transaction cost<br />

-9-


Advantages <strong>of</strong> the New Contract (3)<br />

The table below presents a comparison <strong>of</strong> Gain / Loss on investment in <strong>contracts</strong><br />

<strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> and <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 (assuming a<br />

commission on <strong>contracts</strong> at <strong>PLN</strong> 6)<br />

Change <strong>of</strong> contract price<br />

Gain / Loss on a contract <strong>with</strong><br />

a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong><br />

Gain / Loss on a contract <strong>with</strong><br />

a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10<br />

1 point<br />

(one tick)<br />

+ <strong>PLN</strong> 8 - <strong>PLN</strong> 2<br />

2 points + <strong>PLN</strong> 28 + <strong>PLN</strong> 8<br />

3 points + <strong>PLN</strong> 48 + <strong>PLN</strong> 18<br />

-10-


Other Parameters in the Standard<br />

Specification <strong>of</strong> New Contracts<br />

New <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> will be different from currently listed <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> only in<br />

terms <strong>of</strong> the <strong>multiplier</strong>. All other parameters <strong>of</strong> the standard specification <strong>of</strong><br />

<strong>contracts</strong> will remain unchanged<br />

Since <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 and <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong><br />

are scheduled to be listed in parallel until <strong>20</strong> June <strong>20</strong>14, the ticker symbol <strong>of</strong> new<br />

<strong>contracts</strong> will be different from the ticker symbol <strong>of</strong> existing <strong>contracts</strong><br />

The ticker symbol <strong>of</strong> new <strong>contracts</strong> will be determined in the standard specification<br />

<strong>of</strong> the instrument. In this presentation, new <strong>contracts</strong> are marked <strong>with</strong> an asterisk,<br />

e.g., FW<strong>20</strong>Z13*<br />

-11-


New Contracts Introduction Timeline (1)<br />

Futures <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> will replace currently listed <strong>contracts</strong><br />

<strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10.<br />

Changes to the listing schedule <strong>of</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10:<br />

After the expiration <strong>of</strong> the series FW<strong>20</strong>U13 on <strong>20</strong> September <strong>20</strong>13, the next series<br />

will not be introduced to trading on the exchange (the series that would otherwise<br />

be scheduled to be introduced into trading is FW<strong>20</strong>U14. This series will not be<br />

introduced into trading);<br />

As <strong>of</strong> 23 September <strong>20</strong>13, only 3 series will remain listed on the exchange:<br />

FW<strong>20</strong>Z13; FW<strong>20</strong>H14; FW<strong>20</strong>M14. These series will expire as scheduled (if there is<br />

no open interest in any <strong>of</strong> these series, trading in the relevant series will be<br />

suspended until the expiration <strong>of</strong> the series).<br />

-12-


New Contracts Introduction Timeline (2)<br />

The figure below presents changes to the listing schedule <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>futures</strong> <strong>contracts</strong><br />

<strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10:<br />

The series FW<strong>20</strong>U13 (in green) will expire on <strong>20</strong><br />

September <strong>20</strong>13. The next series (FW<strong>20</strong>U14, in<br />

white) WILL NOT BE introduced into trading on<br />

the exchange. This series WILL NOT BE listed on 23<br />

September <strong>20</strong>13<br />

The last series <strong>of</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 will be the series FW<strong>20</strong>Z13;<br />

FW<strong>20</strong>H14 and FW<strong>20</strong>M14 (in blue). These series will expire as scheduled. The last<br />

series (FW<strong>20</strong>M14) will expire on <strong>20</strong> June <strong>20</strong>14 (if there is no open interest in any <strong>of</strong><br />

these series, trading in the relevant series will be suspended until the expiration <strong>of</strong><br />

the series).<br />

-13-


New Contracts Introduction Timeline (3)<br />

The scheduled date <strong>of</strong> the introduction <strong>of</strong> the first series <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>futures</strong><br />

<strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> into trading is 23 September <strong>20</strong>13.<br />

The following 4 series <strong>of</strong> such <strong>contracts</strong><br />

will be introduced into trading on the exchange:<br />

Ticker symbol<br />

Expiration date<br />

FW<strong>20</strong>Z13* <strong>20</strong> December <strong>20</strong>13<br />

FW<strong>20</strong>H14* 21 March <strong>20</strong>14<br />

FW<strong>20</strong>M14* <strong>20</strong> June <strong>20</strong>14<br />

FW<strong>20</strong>U14* 19 September <strong>20</strong>14<br />

-14-


New Contracts Introduction Timeline (4)<br />

The figure below presents the listing schedule <strong>of</strong> the first series <strong>of</strong> <strong>contracts</strong> <strong>with</strong> a<br />

<strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> to be introduced into trading on 23 September <strong>20</strong>13<br />

-15-


New Contracts Introduction Timeline (5)<br />

The date <strong>of</strong> the introduction <strong>of</strong> the first series <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong><br />

<strong>of</strong> <strong>PLN</strong> <strong>20</strong> into trading scheduled on 23 September <strong>20</strong>13* may not be feasible. In<br />

that case, the new <strong>contracts</strong> will be introduced into trading as soon as reasonably<br />

practicable after that date.<br />

Any postponement <strong>of</strong> the date <strong>of</strong> the introduction <strong>of</strong><br />

<strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> into trading<br />

does not affect the rules for <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 described above<br />

(the dates and actions described therein will be binding).<br />

*The date <strong>of</strong> the introduction <strong>of</strong> the first series <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> into trading will be determined in<br />

the relevant resolution <strong>of</strong> the Exchange Management Board (the resolution will be published on the WSE website).<br />

-16-


New Contracts Introduction Timeline (6)<br />

The figures below present:<br />

the listing schedule <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10<br />

the timeline <strong>of</strong> the introduction <strong>of</strong> the first series <strong>of</strong> <strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong><br />

<strong>PLN</strong> <strong>20</strong> into trading<br />

Listing schedule <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>futures</strong><br />

<strong>contracts</strong> <strong>with</strong> a <strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> 10 (see<br />

slide 13 for a detailed description)<br />

Timeline <strong>of</strong> the introduction <strong>of</strong> the first<br />

series <strong>of</strong> <strong>WIG<strong>20</strong></strong> <strong>futures</strong> <strong>contracts</strong> <strong>with</strong> a<br />

<strong>multiplier</strong> <strong>of</strong> <strong>PLN</strong> <strong>20</strong> into trading<br />

-17-


The Warsaw Stock Exchange<br />

4, Książęca St., 00-498 Warsaw, Poland<br />

tel. (022) 628 32 32, fax (022) 628 17 54, 537 77 90<br />

www.gpw.pl<br />

www.gpwtrader.pl<br />

pochodne@gpw.pl<br />

-18-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!