13.05.2015 Views

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13) The development hereby approved shall not commence until details of floodlights<br />

<strong>and</strong> other external lighting (including to the car park) have been submitted to <strong>and</strong><br />

approved in writing by the Council. Details shall demonstrate that the<br />

recommendations of the Institution of Lighting Engineers in the `Guidance Notes<br />

For The Reduction Of Light Pollution 2011' will be met, particularly with regard to:<br />

- minimising glare,<br />

- limiting the use of lights to periods of need for safety, security or permitted<br />

site use,<br />

- preventing upward illumination <strong>and</strong> sky glow,<br />

- controlling vertical illuminance of neighbouring property facades to a<br />

maximum of 10 lux at ground floor level <strong>and</strong> 5 lux at first floor.<br />

- minimising light pollution by correctly using, locating, aiming <strong>and</strong> shielding<br />

- luminaries<br />

The development shall not be occupied or used until the details as approved have<br />

been carried out.<br />

To ensure that the amenity of occupiers of the development site <strong>and</strong> surrounding<br />

premises is not adversely affected by lighting, in accordance with Policy DM H10<br />

of the Development Management Local Plan 2013.<br />

14) Prior to commencement of development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council of the rear louvres to be fitted to all floodlights<br />

on the perimeter of the site <strong>and</strong> any other louvres, as necessary. Approved details<br />

shall be implemented prior to occupation or use of the development <strong>and</strong> thereafter<br />

be permanently retained as such.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise from the operation of the site, in accordance with Policy DM H9<br />

of the Development Management Local Plan 2013.<br />

15) Prior to use of any proposed sports pitch any floodlighting shall be installed with<br />

individually controlled lights. When a pitch is not in use the floodlights to that pitch<br />

shall be switched off. The lighting shall be permanently maintained in this form.<br />

To ensure that the amenity of neighbouring occupiers is not adversely affected by<br />

light from the operation of the site, in accordance with Policy DM H10 of the<br />

Development Management Local Plan 2013.<br />

16) A post-installation light spillage survey shall be carried out <strong>and</strong> submitted to the<br />

Council for its written approval within one month of the first use of the<br />

development. The survey shall show how the recommendations of the Institution<br />

of Lighting Engineers in the `Guidance Notes For The Reduction Of Light Pollution<br />

2011' have been achieved, with particular regard to the control of illuminance of<br />

neighbouring residential facades within the recommended limits, with any<br />

mitigation measures as necessary. The approved details shall be permanently<br />

maintained as such.<br />

To ensure that the amenity of occupiers of the development site <strong>and</strong> surrounding<br />

premises is not adversely affected by lighting, in accordance with Policy DM H10<br />

of the Development Management Local Plan 2013.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!