13.05.2015 Views

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

document that should be annually reviewed to address any highways issues that may<br />

arise once the buildings are occupied, <strong>and</strong> would also provide a mechanism to monitor<br />

the impact of the development on the surrounding highway.<br />

3.45 Suitable storage space for refuse <strong>and</strong> recycling is required to be provided. It is not<br />

acceptable for waste material to be left on the highway for extended periods of time. A<br />

refuse storage area has been indicated close to the proposed school kitchen <strong>and</strong> would<br />

be accessed via the relocated vehicular access from Commonwealth Avenue. Details<br />

of refuse <strong>and</strong> recycling storage consistent with the requirements set out in the <strong>Planning</strong><br />

Guidance Supplementary <strong>Planning</strong> Document (2013) are required by condition<br />

(condition 26).<br />

SECURED BY DESIGN<br />

3.46 London Plan policy 7.3 requires new development to incorporate crime prevention<br />

measures to provide a safe <strong>and</strong> secure environment. Policy DM G1 of the Development<br />

Management Local Plan requires developments to incorporate the principles of Secured<br />

by Design. The proposed development would be designed to achieve Secured By<br />

Design certification, <strong>and</strong> a condition would be attached requiring final details of the SBD<br />

measures to be incorporated (condition 14).<br />

ACCESSIBILITY<br />

3.47 London Plan policy 7.2 requires that new development to embrace the principles<br />

of accessible <strong>and</strong> inclusive design, <strong>and</strong> this is also a requirement of policy DM G1 of the<br />

Development Management Local Plan. In accordance with this policy position, careful<br />

consideration has been given to the accessibility of the new school building, <strong>and</strong><br />

extensions. The proposed development would significantly improve access for mobility<br />

impaired pupils in existing classes as well as in the new building, with the proposed new<br />

building incorporating lift access.<br />

3.48 It is therefore considered that the proposed development would ensure ease of<br />

access for all users, but a condition is recommended to ensure that the development is<br />

constructed according to these relevant criteria (condition 17).<br />

ENVIRONMENTAL MATTERS<br />

Energy <strong>and</strong> Sustainability<br />

3.49 Policies DM H1 <strong>and</strong> DM H2 of the Development Management Local Plan seek to<br />

promote development which incorporates measures to reduce carbon dioxide <strong>and</strong><br />

utilises sustainable design <strong>and</strong> construction methods. An Energy Report has been<br />

submitted with the application in line with London Plan policy 5.2. This outlines the<br />

energy efficiency <strong>and</strong> low/zero carbon measures that would be implemented in order to<br />

minimise energy use <strong>and</strong> associated CO2 emissions, <strong>and</strong> shows that energy efficiency<br />

<strong>and</strong> renewable energy measures are planned that would improve performance beyond<br />

the 2010 Building Regulations requirements. The use of on-site renewables such as<br />

solar PV, solar water heating <strong>and</strong> heat pump system are expected to achieve significant<br />

CO2 emission reductions for the development.<br />

3.50 The proposed PV panels are to be installed on the roof of the new school building<br />

at its southern end. The proposed ASHPs <strong>and</strong> solar collectors are to be located at the<br />

northern end of the roof of the new building. Natural ventilation stacks would be located<br />

over the centre of the new building towards its northern end. The energy proposals are

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!