Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
policies 5.2 <strong>and</strong> 5.7 of the London Plan (2011), policy CC1 of the Core Strategy<br />
(2011) <strong>and</strong> policies DM H1 <strong>and</strong> DM H2 of the Development Management Local<br />
Plan (2013).<br />
30) The building development hereby permitted shall not be occupied until the<br />
proposed works to the public highway on Canada Way <strong>and</strong> Commonwealth<br />
Avenue to relocate the two existing vehicular accesses are fully completed to the<br />
Council's Streetsmart st<strong>and</strong>ards.<br />
To ensure a satisfactory st<strong>and</strong>ard of appearance <strong>and</strong> to maintain pedestrian <strong>and</strong><br />
highway safety, in accordance with policies DM G1, DM J4 <strong>and</strong> DM J6 of the<br />
Development Management Local Plan (2013).<br />
31) No development shall commence until details are submitted to, <strong>and</strong> approved in<br />
writing by, the Council of the position, number <strong>and</strong> noise output of the proposed air<br />
source heat pumps, the position <strong>and</strong> number of solar collectors <strong>and</strong> natural<br />
ventilation stacks, <strong>and</strong> the final position, number <strong>and</strong> angle relative to the surface<br />
of the roof of the proposed PV panels, to be provided as part of the approved<br />
development. The development shall be carried out in accordance with the details<br />
as approved <strong>and</strong> permanently retained in this form.<br />
To ensure a satisfactory st<strong>and</strong>ard of external appearance <strong>and</strong> to prevent noise<br />
<strong>and</strong> disturbance to neighbouring residents, in accordance with policies DM H1, DM<br />
H2 <strong>and</strong> DM H11 of the Development Management Local Plan (2013).<br />
32) No development shall commence until a preliminary risk assessment report is<br />
submitted to <strong>and</strong> approved in writing by the Council. This report shall comprise: a<br />
desktop study which identifies all current <strong>and</strong> previous uses at the site <strong>and</strong><br />
surrounding area as well as the potential contaminants associated with those<br />
uses; a site reconnaissance; <strong>and</strong> a conceptual model indicating potential pollutant<br />
linkages between sources, pathways <strong>and</strong> receptors, including those in the<br />
surrounding area <strong>and</strong> those planned at the site; <strong>and</strong> a qualitative risk assessment<br />
of any potentially unacceptable risks arising from the identified pollutant linkages<br />
to human health, controlled waters <strong>and</strong> the wider environment including ecological<br />
receptors <strong>and</strong> building materials. All works must be carried out in compliance with<br />
<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />
Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />
for sampling <strong>and</strong> testing.<br />
Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />
or near to, this site. This condition is required to ensure that no unacceptable risks<br />
are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />
following the development works, in accordance with Borough Wide Strategic<br />
Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />
Development Management Local Plan (2013).<br />
33) No development shall commence until a site investigation scheme is submitted to<br />
<strong>and</strong> approved in writing by the Council. This scheme shall be based upon <strong>and</strong><br />
target the risks identified in the approved preliminary risk assessment <strong>and</strong> shall<br />
provide provisions for, where relevant, the sampling of soil, soil vapour, ground<br />
gas, surface <strong>and</strong> groundwater . All works must be carried out in compliance with<br />
<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the