13.05.2015 Views

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

policies 5.2 <strong>and</strong> 5.7 of the London Plan (2011), policy CC1 of the Core Strategy<br />

(2011) <strong>and</strong> policies DM H1 <strong>and</strong> DM H2 of the Development Management Local<br />

Plan (2013).<br />

30) The building development hereby permitted shall not be occupied until the<br />

proposed works to the public highway on Canada Way <strong>and</strong> Commonwealth<br />

Avenue to relocate the two existing vehicular accesses are fully completed to the<br />

Council's Streetsmart st<strong>and</strong>ards.<br />

To ensure a satisfactory st<strong>and</strong>ard of appearance <strong>and</strong> to maintain pedestrian <strong>and</strong><br />

highway safety, in accordance with policies DM G1, DM J4 <strong>and</strong> DM J6 of the<br />

Development Management Local Plan (2013).<br />

31) No development shall commence until details are submitted to, <strong>and</strong> approved in<br />

writing by, the Council of the position, number <strong>and</strong> noise output of the proposed air<br />

source heat pumps, the position <strong>and</strong> number of solar collectors <strong>and</strong> natural<br />

ventilation stacks, <strong>and</strong> the final position, number <strong>and</strong> angle relative to the surface<br />

of the roof of the proposed PV panels, to be provided as part of the approved<br />

development. The development shall be carried out in accordance with the details<br />

as approved <strong>and</strong> permanently retained in this form.<br />

To ensure a satisfactory st<strong>and</strong>ard of external appearance <strong>and</strong> to prevent noise<br />

<strong>and</strong> disturbance to neighbouring residents, in accordance with policies DM H1, DM<br />

H2 <strong>and</strong> DM H11 of the Development Management Local Plan (2013).<br />

32) No development shall commence until a preliminary risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall comprise: a<br />

desktop study which identifies all current <strong>and</strong> previous uses at the site <strong>and</strong><br />

surrounding area as well as the potential contaminants associated with those<br />

uses; a site reconnaissance; <strong>and</strong> a conceptual model indicating potential pollutant<br />

linkages between sources, pathways <strong>and</strong> receptors, including those in the<br />

surrounding area <strong>and</strong> those planned at the site; <strong>and</strong> a qualitative risk assessment<br />

of any potentially unacceptable risks arising from the identified pollutant linkages<br />

to human health, controlled waters <strong>and</strong> the wider environment including ecological<br />

receptors <strong>and</strong> building materials. All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

33) No development shall commence until a site investigation scheme is submitted to<br />

<strong>and</strong> approved in writing by the Council. This scheme shall be based upon <strong>and</strong><br />

target the risks identified in the approved preliminary risk assessment <strong>and</strong> shall<br />

provide provisions for, where relevant, the sampling of soil, soil vapour, ground<br />

gas, surface <strong>and</strong> groundwater . All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!