13.05.2015 Views

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sustainability: The proposed development has been designed to a BREEAM rating<br />

of Very Good. The proposed development will include passive design measures<br />

which are set out in the Energy Strategy. The proposed C02 emissions for the<br />

development itself are in general compliance with the requirement set out in<br />

London Plan policy 5.2. The proposed development is therefore considered<br />

acceptable in accordance with policies 5.1, 5.2, 5.3, 5.6, 5.7, 5.8, 5.9, 5.11, 5.12,<br />

5.13, 5.14, 5.15, <strong>and</strong> 7.19 of the London Plan (2011), <strong>and</strong> policies CC1, CC2 <strong>and</strong><br />

H3 of the London Borough of Hammersmith <strong>and</strong> Fulham Core Strategy (2011) <strong>and</strong><br />

policies H1, H2 <strong>and</strong> H3 of the Development Management Local Plan.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 30th April 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

Royal Borough Of Kensington And Chelsea<br />

Dated:<br />

08.05.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

27 Stebbing House 5 Queensdale Crescent London W11 4TE 29.05.13<br />

1.0 BACKGROUND<br />

1.1 The application site relates to the roof space to the north of the Net-a-Porter offices<br />

situated on the eastern side of the Westfield Shopping Centre, in Shepherd's Bush.<br />

The roof space currently houses rooftop plant <strong>and</strong> machinery which serves the existing<br />

centre.<br />

1.2 The Net-a-Porter offices are located on the upper floors of the shopping centre<br />

within a two storey rectangular box which part overhangs the eastern access road at<br />

roof level. <strong>Planning</strong> permission has recently been granted for a roof top extension above<br />

the Marks & Spencer's to provide new retail <strong>and</strong> leisure uses (in May 2013). This<br />

extension would infill part of the gap in the roof level between the Vue cinema roof<br />

addition on the northern side of the shopping centre <strong>and</strong> the Net-a-Porter offices on the<br />

eastern side. There would be a resulting gap between the retail <strong>and</strong> leisure extension<br />

<strong>and</strong> the existing Net-a-Porter offices which this proposal seeks to infill.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!