Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
To safeguard the amenities of the occupiers of neighbouring properties, <strong>and</strong> to<br />
avoid overlooking <strong>and</strong> loss of privacy <strong>and</strong> the potential for additional noise <strong>and</strong><br />
disturbance, in accordance with Policy DM H9 <strong>and</strong> DM A9 of the Development<br />
Management Local Plan 2013.<br />
14) The sound proofing details identified within the External Noise Assessment Spring<br />
Vale Dated May 2013 shall be implemented prior to the occupation of the<br />
residential units hereby approved, <strong>and</strong> thereafter be permanently retained.<br />
To ensure that the amenity of occupiers of the development site are not adversely<br />
affected by noise from transport [industrial/ commercial noise sources], in<br />
accordance with Policy DM H9 of the Development Management Local Plan 2013.<br />
15) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />
approved in writing by the Council, of an enhanced sound insulation value DnT,w<br />
<strong>and</strong> LnT,w for the floor/ceiling/ wall structures separating different types of rooms/<br />
uses in adjoining dwellings. The details as approved shall be implemented prior to<br />
occupation of the development <strong>and</strong> thereafter be permanently retained.<br />
To ensure that the amenity of occupiers of the development site is not adversely<br />
affected by noise, in accordance with Policies H11, DM H9 of the Development<br />
Management Local Plan 2013.<br />
16) The development hereby permitted shall not commence until further details of a<br />
Sustainable Urban Drainage System (SUDS), including maintenance programme<br />
have been submitted to <strong>and</strong> approved in writing by the council. The SUDS scheme<br />
shall be implemented in accordance with the approved details prior to occupation<br />
of the development hereby permitted, <strong>and</strong> thereafter permanently retained <strong>and</strong><br />
maintained in line with the agreed plan.<br />
To ensure that surface water run-off is managed in a sustainable manner, in<br />
accordance with policy 5.13 of The London Plan 2011, Policy CC2 of the Core<br />
Strategy 2011 <strong>and</strong> policy DM H3 of the Development Management Local Plan<br />
2013.<br />
17) The development hereby permitted shall not be occupied before implementation of<br />
the energy efficiency <strong>and</strong> renewable energy measures detailed in the submitted<br />
Energy Statement Spring Vale Dated May 2013. All details shall be implemented<br />
prior to occupation or use of the development hereby permitted, <strong>and</strong> thereafter<br />
permanently retained.<br />
To ensure a satisfactory external appearance <strong>and</strong> the integration of energy<br />
generation from renewable sources, consistent with the Mayor's sustainable<br />
design objectives in accordance with Policies DM G1<strong>and</strong> DM H1 of the<br />
Development Management Local Plan 2013, Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The<br />
London Plan (2011), <strong>and</strong> Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />
18) The development hereby permitted shall not be occupied before implementation of<br />
the sustainable design <strong>and</strong> construction measures detailed in the submitted<br />
Sustainability Statement Spring Vale Dated May 2013. All details shall be<br />
implemented prior to occupation or use of the development hereby permitted, <strong>and</strong><br />
thereafter permanently retained.