Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
17) Prior to commencement of the development, details of anti-vibration measures<br />
shall be submitted to <strong>and</strong> approved in writing by the Council. The measures shall<br />
ensure that machinery (including the proposed car lift), plant/ equipment, extract/<br />
ventilation system <strong>and</strong> ducting are mounted with proprietary anti-vibration isolators<br />
<strong>and</strong> fan motors are vibration isolated from the casing <strong>and</strong> adequately silenced.<br />
Approved details shall be implemented prior to occupation of the development <strong>and</strong><br />
thereafter be permanently retained.<br />
To ensure that the amenity of occupiers of the development site is not adversely<br />
affected by noise, in accordance with Policy DM H9 of the Development<br />
Management Local Plan 2013.<br />
18) The use of the office shall not be permitted during the hours of 20:00 - 07:30<br />
Mondays to Fridays, 20:00 -07:30 on Saturdays nor at any time on Sundays <strong>and</strong><br />
Public/Bank Holidays.<br />
To ensure that the amenity of occupiers of surrounding premises is not adversely<br />
affected by noise from activities or people at or leaving the site, in accordance with<br />
Policy DM H9 of the Development Management Local Plan 2013.<br />
19) The development hereby permitted shall not commence until further details of a<br />
Sustainable Urban Drainage System (SUDS), including maintenance programme<br />
have been submitted to <strong>and</strong> approved in writing by the council. The SUDS scheme<br />
shall be implemented in accordance with the approved details prior to occupation<br />
of the development hereby permitted, <strong>and</strong> thereafter permanently retained <strong>and</strong><br />
maintained in line with the agreed plan.<br />
To ensure that surface water run-off is managed in a sustainable manner, in<br />
accordance with policy 5.13 of The London Plan 2011, Policy CC2 of the Core<br />
Strategy 2011 <strong>and</strong> policy DM H3 of the Development Management Local Plan<br />
2013.<br />
20) The development hereby permitted shall not be occupied before implementation of<br />
the energy efficiency <strong>and</strong> renewable energy measures detailed in the submitted<br />
Energy Strategy dated April 2013. All details shall be implemented prior to<br />
occupation or use of the development hereby permitted, <strong>and</strong> thereafter<br />
permanently retained.<br />
To ensure a satisfactory external appearance <strong>and</strong> the integration of energy<br />
generation from renewable sources, consistent with the Mayor's sustainable<br />
design objectives in accordance with Policies DM G1<strong>and</strong> DM H1 of the<br />
Development Management Local Plan 2013, Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The<br />
London Plan (2011), <strong>and</strong> Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />
21) The development hereby permitted shall be constructed in accordance with the<br />
sustainable design <strong>and</strong> construction measures detailed in the submitted<br />
Sustainability Statement for 11 Beavor Lane dated April 2013. All details shall be<br />
implemented prior to occupation or use of the development hereby permitted, <strong>and</strong><br />
thereafter permanently retained.<br />
To ensure a sustainable development, consistent with the Mayor's sustainable<br />
design objectives in accordance with Policies DM G1, DM H2 of the Development