Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Planning Applications PDF 1 MB - Meetings, agendas and minutes
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
to occupation of the development hereby approved <strong>and</strong> permanently maintained<br />
thereafter.<br />
To ensure a safe <strong>and</strong> secure environment for users of the development, in<br />
accordance with policy DM G1 of the Development Management Local Plan 2013.<br />
9) Prior to commencement of the development hereby approved, details of the<br />
measures taken to ensure compliance with Lifetime Homes st<strong>and</strong>ards, <strong>and</strong> that<br />
the proposed office is accessible to all users, shall be submitted to <strong>and</strong> approved<br />
in writing by the Council. The development shall be carried out in accordance with<br />
such details as approved <strong>and</strong> permanently retained thereafter.<br />
To ensure that the new dwellings are built to `Lifetime Homes' st<strong>and</strong>ards <strong>and</strong> that<br />
the office provides an accessible environment, in accordance with Policy H4 of the<br />
Core Strategy 2011, Policy 3.8 of The London Plan (2011), Policy DM A4 <strong>and</strong><br />
DM G1 of the Development Management Local Plan 2013 <strong>and</strong> Design Policy 1 of<br />
the <strong>Planning</strong> Guidance SPD.<br />
10) Notwithst<strong>and</strong>ing the provisions of the Town <strong>and</strong> Country <strong>Planning</strong> (General<br />
Permitted Development) Order 1995 (or any Order revoking or re-enacting that<br />
Order with or without modification), no aerials, antennae, satellite dishes or related<br />
telecommunications equipment shall be erected on any part of the development<br />
hereby permitted, without planning permission first being obtained.<br />
To ensure that that the visual impact of telecommunication equipment can be<br />
considered in accordance with Policies DM G1 <strong>and</strong> DM G7 of the Development<br />
Management Local Plan 2013.<br />
11) The development shall not be commence until full details of the refuse storage<br />
arrangements, including provision for the storage of recyclable materials, have<br />
been submitted to <strong>and</strong> approved in writing by the Council. Such details as are<br />
approved shall be fully implemented prior to the occupation of the development. All<br />
refuse/recycling generated by the development hereby approved shall be stored<br />
within the agreed areas. These areas shall be permanently retained for this use.<br />
To ensure the satisfactory provision of refuse storage <strong>and</strong> recycling in accordance<br />
with policy DM H5 of the Development Management Local Plan 2013.<br />
12) The development shall not be occupied until the cycle storage arrangements<br />
indicated on approved drawings ref 109 Rev F <strong>and</strong> 110 Rev G have been<br />
constructed <strong>and</strong> completed <strong>and</strong> the provision shall be retained thereafter for the<br />
lifetime of the development.<br />
To ensure the suitable provision of cycle parking within the development to meet<br />
the needs of future site occupiers <strong>and</strong> users, in accordance with policies 6.9 <strong>and</strong><br />
6.13 of the London Plan 2011 <strong>and</strong> policy DM J5 of the Development Management<br />
Local Plan 2013.<br />
13) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />
approved in writing by the Council, of the sound insulation of the floor/ ceiling/<br />
walls separating the commercial parts of the premises from dwellings. Details<br />
shall demonstrate that the sound insulation value DnT,w [<strong>and</strong> L'nT,w ] is<br />
sufficiently enhanced <strong>and</strong>, where necessary, additional mitigation measures are