13.05.2015 Views

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

Planning Applications PDF 1 MB - Meetings, agendas and minutes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

London Borough Of Hammersmith & Fulham<br />

---------------------------------------------------------------------------------------------------------------------<br />

<strong>Planning</strong> <strong>Applications</strong> Committee<br />

Agenda for 31st July 2013<br />

Index of <strong>Applications</strong>, Enforcement Actions, Advertisements etc.<br />

---------------------------------------------------------------------------------------------------------------------<br />

WARD: SITE ADDRESS: PAGE:<br />

REG NO:<br />

S<strong>and</strong>s End<br />

2013/02622/FR3<br />

S<strong>and</strong>s End<br />

2013/02623/CACHF<br />

Shepherd's Bush Green<br />

2013/01768/FUL<br />

Wormholt And White<br />

City<br />

2013/00643/FUL<br />

Watermeadow Court L<strong>and</strong> Including Charlow Close<br />

And Bounded By Potters Road And Watermeadow<br />

Lane London<br />

Watermeadow Court L<strong>and</strong> Including Charlow Close<br />

And Bounded By Potters Road And Watermeadow<br />

Lane London<br />

Westfield London Shopping Centre Ariel Way<br />

London<br />

Pope John School Commonwealth Avenue White<br />

City Estate London W12 7QR<br />

6<br />

20<br />

24<br />

48<br />

Shepherd's Bush Green<br />

2013/01084/FUL<br />

Shepherd's Bush Green<br />

2013/01085/CAC<br />

Hammersmith Park South Africa Road London 78<br />

Hammersmith Park South Africa Road London 106<br />

Ravenscourt Park<br />

2013/01619/FUL<br />

Palco House 11 - 21 Beavor Lane London W6<br />

9AR<br />

110<br />

Avonmore And Brook<br />

Green<br />

2013/01865/FR3<br />

Avonmore And Brook<br />

Green<br />

2013/01866/CACHF<br />

Spring Vale Estate Ceylon Road London W14 0PY 134<br />

Spring Vale Estate Ceylon Road London W14 0PY 160


---------------------------------------------------------------------------------------------------------------------<br />

Ward: S<strong>and</strong>s End<br />

Site Address:<br />

Watermeadow Court L<strong>and</strong> Including Charlow Close And<br />

Bounded By Potters Road And Watermeadow Lane London<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/02622/FR3<br />

Date Valid:<br />

27.06.2013<br />

Case Officer:<br />

Faye Mesgian<br />

Conservation Area:<br />

S<strong>and</strong>s End Conservation Area - Number 41<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

LBHF<br />

Mr Neil Kirby 3rd Floor, Extension King Street London<br />

W6 9JU<br />

Description:<br />

Demolition of all the existing buildings; <strong>and</strong> the implementation of a l<strong>and</strong>scaping scheme<br />

to include a 1.8m high fence for a temporary period of up to 18 months<br />

Drg Nos: SK-04; <strong>and</strong>SK-03 Rev B<br />

SK-03 Rev B; <strong>and</strong>SK-04<br />

Application Type:<br />

Full Regulation 3 - LBHF is Developer<br />

Officer Recommendation:<br />

Subject to there being no contrary direction from the Secretary of State that the<br />

application be approved pursuant to Regulation 3 of the Town <strong>and</strong> Country <strong>Planning</strong><br />

General Regulations 1992 subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) The development shall not commence prior to the submission <strong>and</strong> approval in<br />

writing by the Council of details of the design <strong>and</strong> appearance of the boundary<br />

treatment which shall then be provided in accordance with the approved details.<br />

The boundary treatment shall thereafter be retained in its approved form.<br />

In order to ensure full compliance with the planning application hereby approved<br />

<strong>and</strong> to prevent harm arising through deviations from the approved plans, in<br />

accordance with Borough wide Strategic Policy BE1 of the Core Strategy <strong>and</strong><br />

Policies DM G3 <strong>and</strong> DM G7 of the Development Management Local Plan.<br />

3) The development shall not commence prior to the submission <strong>and</strong> approval in<br />

writing by the Council of details of the l<strong>and</strong>scaping planting schedule <strong>and</strong><br />

l<strong>and</strong>scaping management strategy. The l<strong>and</strong>scaping/planting shall be carried out<br />

in accordance with the approved details in the next winter planting season<br />

following the commencement of the demolition works.<br />

In order to ensure full compliance with the planning application hereby approved<br />

<strong>and</strong> to ensure a satisfactory external appearance, in accordance with Borough<br />

wide Strategic Policy BE1 of the Core Strategy <strong>and</strong> Policies DM G3 <strong>and</strong> DM G7 of<br />

the Development Management Local Plan.<br />

4) Prior to commencement of the development hereby approved, a demolition<br />

method statement shall be submitted to <strong>and</strong> approved in writing by the Council.


Details shall include control measures for dust, noise, vibration, lighting,<br />

delivery/collection locations, restriction of hours of work <strong>and</strong> all associated<br />

activities audible beyond the site boundary to 0800-1800hrs Mondays to Fridays<br />

<strong>and</strong> 0800-1300hrs on Saturdays, advance notification to neighbours <strong>and</strong> other<br />

interested parties of proposed works <strong>and</strong> public display of contact details including<br />

accessible phone contact to persons responsible for the site works for the duration<br />

of the works. Approved details shall be implemented throughout the project<br />

period.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise, vibration, dust, lighting or other emissions from the building site,<br />

in accordance in accordance with Policies DM H5, DM H6, DM H8, DM H9, DM<br />

H10 <strong>and</strong> DM H11 of the Development Management Local Plan.<br />

5) Prior to commencement of the development hereby approved, a construction<br />

logistics plan shall be submitted to <strong>and</strong> approved in writing by the Council. This<br />

should include details of the proposed routing of vehicles to <strong>and</strong> from the site for<br />

demolition <strong>and</strong> construction purposes, vehicle entry <strong>and</strong> egress from the site, <strong>and</strong><br />

any other activities on the public highway in order to demonstrate that construction<br />

materials can be delivered, <strong>and</strong> waste removed in a safe, efficient <strong>and</strong><br />

environmentally-friendly way, The construction logistics plan should also identify<br />

how deliveries could be reduced, re-timed or even consolidated, particularly during<br />

peak periods.<br />

In order to reduce congestion on local roads <strong>and</strong> ease pressure on the<br />

environment in accordance with policy DM J1 of the Development Management<br />

Local Plan.<br />

6) No advertisements or signage shall be displayed on any elevation of the<br />

development, unless full details of proposed advertisements or signage has been<br />

submitted <strong>and</strong> approved in writing by the Council.<br />

In order to ensure a satisfactory appearance of the development <strong>and</strong> to prevent<br />

harm to the street scene <strong>and</strong> the conservation area in accordance with Policies<br />

DM G7 <strong>and</strong> DM G8 of the Development Management Local Plan (2013).<br />

7) No development shall commence until a preliminary risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall comprise: a<br />

desktop study which identifies all current <strong>and</strong> previous uses at the site <strong>and</strong><br />

surrounding area as well as the potential contaminants associated with those<br />

uses; a site reconnaissance; <strong>and</strong> a conceptual model indicating potential pollutant<br />

linkages between sources, pathways <strong>and</strong> receptors, including those in the<br />

surrounding area <strong>and</strong> those planned at the site; <strong>and</strong> a qualitative risk assessment<br />

of any potentially unacceptable risks arising from the identified pollutant linkages<br />

to human health, controlled waters <strong>and</strong> the wider environment including ecological<br />

receptors <strong>and</strong> building materials. All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

To ensure that no unacceptable risks are caused to humans, controlled waters or<br />

the wider environment during <strong>and</strong> following the development works, in accordance


with Borough Wide Strategic Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7<br />

<strong>and</strong> H11 of the Development Management Local Plan.<br />

8) No development shall commence until a site investigation scheme is submitted to<br />

<strong>and</strong> approved in writing by the Council. This scheme shall be based upon <strong>and</strong><br />

target the risks identified in the approved preliminary risk assessment <strong>and</strong> shall<br />

provide provisions for, where relevant, the sampling of soil, soil vapour, ground<br />

gas, surface <strong>and</strong> groundwater . All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

To ensure that no unacceptable risks are caused to humans, controlled waters or<br />

the wider environment during <strong>and</strong> following the development works, in accordance<br />

with Borough Wide Strategic Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7<br />

<strong>and</strong> H11 of the Development Management Local Plan.<br />

9) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, following a site investigation undertaken in compliance with the<br />

approved site investigation scheme, a quantitative risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall: assess the<br />

degree <strong>and</strong> nature of any contamination identified on the site through the site<br />

investigation; include a revised conceptual site model from the preliminary risk<br />

assessment based on the information gathered through the site investigation to<br />

confirm the existence of any remaining pollutant linkages <strong>and</strong> determine the risks<br />

posed by any contamination to human health, controlled waters <strong>and</strong> the wider<br />

environment. All works must be carried out in compliance with <strong>and</strong> by a competent<br />

person who conforms to CLR 11: Model Procedures for the Management of L<strong>and</strong><br />

Contamination (Defra 2004) or the current UK requirements for sampling <strong>and</strong><br />

testing.<br />

To ensure that no unacceptable risks are caused to humans, controlled waters or<br />

the wider environment during <strong>and</strong> following the development works, in accordance<br />

with Borough Wide Strategic Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7<br />

<strong>and</strong> H11 of the Development Management Local Plan.<br />

10) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, a remediation method statement is submitted to <strong>and</strong> approved in<br />

writing by the Council. This statement shall detail any required remediation works<br />

<strong>and</strong> shall be designed to mitigate any remaining risks identified in the approved<br />

quantitative risk assessment. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

To ensure that no unacceptable risks are caused to humans, controlled waters or<br />

the wider environment during <strong>and</strong> following the development works, in accordance<br />

with Borough Wide Strategic Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7<br />

<strong>and</strong> H11 of the Development Management Local Plan.


11) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until the approved remediation method statement has been carried out<br />

in full <strong>and</strong> a verification report confirming these works has been submitted to, <strong>and</strong><br />

approved in writing, by the Council. This report shall include: details of the<br />

remediation works carried out; results of any verification sampling, testing or<br />

monitoring including the analysis of any imported soil; all waste management<br />

documentation showing the classification of waste, its treatment, movement <strong>and</strong><br />

disposal; <strong>and</strong> the validation of gas membrane placement. If, during development,<br />

contamination not previously identified is found to be present at the site, the<br />

Council is to be informed immediately <strong>and</strong> no further development (unless<br />

otherwise agreed in writing by the Council) shall be carried out until a report<br />

indicating the nature of the contamination <strong>and</strong> how it is to be dealt with is<br />

submitted to, <strong>and</strong> agreed in writing by, the Council. Any required remediation shall<br />

be detailed in an amendment to the remediation statement <strong>and</strong> verification of<br />

these works included in the verification report. All works must be carried out in<br />

compliance with <strong>and</strong> by a competent person who conforms to CLR 11: Model<br />

Procedures for the Management of L<strong>and</strong> Contamination (Defra 2004) or the<br />

current UK requirements for sampling <strong>and</strong> testing.<br />

To ensure that no unacceptable risks are caused to humans, controlled waters or<br />

the wider environment during <strong>and</strong> following the development works, in accordance<br />

with Borough Wide Strategic Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7<br />

<strong>and</strong> H11 of the Development Management Local Plan.<br />

12) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until an onward long-term monitoring methodology report is submitted<br />

to <strong>and</strong> approved in writing by the Council where further monitoring is required past<br />

the completion of development works to verify the success of the remediation<br />

undertaken. A verification report of these monitoring works shall then be submitted<br />

to <strong>and</strong> approved in writing by the Council when it may be demonstrated that no<br />

residual adverse risks exist. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

To ensure that no unacceptable risks are caused to humans, controlled waters or<br />

the wider environment during <strong>and</strong> following the development works, in accordance<br />

with Borough Wide Strategic Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7<br />

<strong>and</strong> H11 of the Development Management Local Plan.<br />

13) The temporary l<strong>and</strong>scaping <strong>and</strong> boundary treatment hereby approved shall be<br />

replaced within 18 months of the date of commencement of development with a<br />

more permanent proposal unless otherwise agreed in writing with the Council.<br />

Before such time, details of a permanent replacement scheme shall be submitted<br />

for approval to the Council.<br />

Reason: In order to ensure a satisfactory long term development is secured which<br />

enhances the street scene <strong>and</strong> the conservation area in accordance with Policies<br />

DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan (2013).


14) To submit details of a permanent replacement scheme to the Council for approval<br />

within 15 months of the date of the planning permission unless otherwise agreed<br />

in writing with the Council.<br />

Reason: In order to ensure a satisfactory long term development is secured which<br />

enhances the street scene <strong>and</strong> the conservation area in accordance with Policies<br />

DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan (2013).<br />

Justification for Approving the Application:<br />

1) Justification<br />

1. Demolition: The proposal represents a high quality l<strong>and</strong>scaping scheme which<br />

would enhance the character <strong>and</strong> appearance of the conservation area. The<br />

development is therefore considered to be acceptable in accordance with Policies<br />

7.1, 7.2, 7.3, 7.4, 7.5, 7.6 <strong>and</strong> 7.8 of the London Plan (2011) <strong>and</strong> policy BE1 of the<br />

Core Strategy <strong>and</strong> Polices DM G7, DM G1 <strong>and</strong> DM E4 of the Development<br />

Management Local Plan (2013).<br />

2. Design: The proposal represents a high quality development which would make<br />

a positive contribution to the public realm <strong>and</strong> enhances the character <strong>and</strong><br />

appearance of the conservation area. The development is therefore considered to<br />

be acceptable in accordance with Policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6 <strong>and</strong> 7.8 of the<br />

London Plan (2011) <strong>and</strong> policy BE1 of the Core Strategy <strong>and</strong> Polices DM G7, DM<br />

G1 <strong>and</strong> DM E4 of the Development Management Local Plan (2013)<br />

3. Flood Risk: A Flood Risk Assessment (FRA) has been submitted <strong>and</strong> has<br />

considered risks of flooding to the site <strong>and</strong> adequate preventative measures have<br />

been identified <strong>and</strong> secured. The development is therefore considered to be<br />

acceptable in accordance with the NPPF <strong>and</strong> London Plan Policy 5.12 <strong>and</strong> Core<br />

Strategy Policies CC1 <strong>and</strong> CC2.<br />

4. Temporary loss of housing (including affordable housing): Although London<br />

Plan Policy 3.14 seeks to retain existing housing in London, London Plan Policy<br />

3.4 seeks to optimise housing potential. In this regard the quality of the existing<br />

housing on site is poor <strong>and</strong> redevelopment of the Site would enable the provision<br />

of better quality, fit for purpose housing whilst optimising the potential of the site<br />

which has been indentified in the SHLAA as having potential for an approximate<br />

50% increase in capacity. Increasing the density on site would be more<br />

sustainable in line with the objectives of the NPPF. The demolition would assist<br />

<strong>and</strong> accelerate a future housing scheme coming forward in 2014 <strong>and</strong> the Council<br />

have sufficient comfort from the advanced stage of the Council's JV programme<br />

that this will occur.<br />

--------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 24th June 2013<br />

Drawing Nos: see above


Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

Environment Agency - <strong>Planning</strong> Liaison<br />

Fulham Society<br />

Dated:<br />

05.07.13<br />

03.07.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

1.0 SITE CONTEXT<br />

1.1 The Site covers an area of approximately 0.48 hectares <strong>and</strong> accommodates<br />

Watermeadow Court which is owned by the London Borough of Hammersmith <strong>and</strong><br />

Fulham (LBHF). Watermeadow Court originally comprised 80 flats with 61 tenants <strong>and</strong><br />

19 leaseholders. The Site was determined by LBHF's Cabinet in 2008 to be `surplus to<br />

Community Services Department requirements'. Following the Council's decision in<br />

2008, the building has been decanted of all but one tenant. Full vacancy of<br />

Watermeadow Court is expected Autumn 2013.<br />

1.2 Watermeadow Court is arranged within two blocks of three <strong>and</strong> four stories in<br />

height. The buildings are located around a central amenity <strong>and</strong> parking area. The<br />

properties, constructed in the 1980s are constructed of brick <strong>and</strong> have pitched tiled<br />

roofs. The buildings have little architectural merit <strong>and</strong> now appear dated having become<br />

an unsightly feature in the local townscape.<br />

1.3 The Site is located within the Thames Policy Area, <strong>and</strong> Zone 3 flood risk area<br />

(high flood risk). The Site is not located within an Archaeological Priority Area or within<br />

a strategic viewing corridor, <strong>and</strong> none of the buildings are statutory or locally listed.<br />

There are a number of trees <strong>and</strong> shrubs on the Site which are considered to have little<br />

amenity value. The Public Transport Accessibility Level (PTAL) rating for the Site is<br />

PTAL 3, representing a medium public transport accessibility level.<br />

1.4 Watermeadow Court site is located within the S<strong>and</strong>s End Conservation Area,<br />

which was designated in March 1991. A profile of the Conservation Area, produced in<br />

1999, after the construction of Watermeadow Court, noted that there are `no buildings<br />

or structures of merit on site'. No buildings on site are listed or included on the Local<br />

Register of Buildings of Merit.<br />

SURROUNDING AREA<br />

1.5 The Site is bound by Townmead Road, Watermeadow Lane <strong>and</strong> Potters Road.<br />

Charlow Close is the main pedestrian <strong>and</strong> vehicular access into the Site. The Site is<br />

located within the South Fulham Riverside Area near the southern edge of Imperial<br />

Wharf <strong>and</strong> is within a short walking distance of the River Thames <strong>and</strong> approximately 20


<strong>minutes</strong> walk to Fulham Town Centre. The closest public transport nodes are Imperial<br />

Wharf rail <strong>and</strong> overground station <strong>and</strong> Fulham Broadway underground station.<br />

1.6 The opposite side of Townmead Road is characterised by two storey Victorian<br />

Terrace dwellings. To the south across Watermeadow Lane is the Chelsea Harbour<br />

Club, comprising outdoor tennis courts <strong>and</strong> a four storey building with a warehouse type<br />

appearance. To the east of the site between Potters Road <strong>and</strong> William Morris Way is<br />

Quayside Lodge, a three storey office building. The Imperial Wharf development<br />

adjoins the site to the north east <strong>and</strong> contains four storey terrace dwellings, plus<br />

mansard roof accommodation.<br />

2.0 PLANNING HISTORY<br />

2.1 There is no relevant planning history for the Site.<br />

3.0 BACKGROUND AND PROPOSALS<br />

3.1 In 2008, Watermeadow Court was declared surplus to requirements by the Council<br />

<strong>and</strong> was identified as a site suitable for disposal. This was because the building<br />

provided sub-st<strong>and</strong>ard living accommodation particularly in relation to the size of the<br />

properties <strong>and</strong> the internal circulation space. Furthermore, the Council is aware of<br />

potential ground contamination issues on site. Having a cleared site would enable the<br />

Council to carry out further below ground investigative work. Following the Council's<br />

decision in 2008, the building has been decanted of all but one resident leaseholder.<br />

The Council is currently negotiating with this leaseholder <strong>and</strong> full vacancy is expected in<br />

Autumn 2013.<br />

3.2 Demolition of Watermeadow Court was agreed in principle by the Council at a<br />

Cabinet meeting on 12th November 2012. The main reasons for this are outlined<br />

below:<br />

• Stop repeat incidents of squatting <strong>and</strong> fly tipping<br />

• Allow for more detailed intrusive site surveys to be undertaken in terms of<br />

ground contamination<br />

• Accelerate the development programme following the establishment of the<br />

Housing <strong>and</strong> Regeneration Joint Venture (JV) vehicle<br />

• Reduce the ongoing management <strong>and</strong> security costs<br />

3.3 In November 2012, Cabinet also agreed to market the Site as one of the first<br />

Opportunity Sites for the Housing <strong>and</strong> Regeneration Joint Venture vehicle. It is<br />

anticipated that the Council will identify a preferred private sector partner for the Joint<br />

Venture in September 2013 <strong>and</strong> appoint one in January 2014. As part of the private<br />

sector partner procurement process, the Bidders are developing proposals for<br />

redevelopment of the Site for residential purposes <strong>and</strong> a planning application is<br />

expected to be submitted in Spring 2014. The current programme for the demolition is<br />

completion during December 2013. It is anticipated that the residential redevelopment<br />

proposal will commence early 2015 with completions in late 2016 (subject to planning<br />

permissions).


Proposals<br />

3.4 In advance of the redevelopment proposals coming forward in 2014, this planning<br />

application proposes the demolition of all the existing buildings on site <strong>and</strong> the<br />

subsequent implementation of a l<strong>and</strong>scaping scheme, with a 1.8m green screen fence<br />

for a temporary period of up to 18 months. Having a cleared site will also enable below<br />

ground investigative works to take place in order to establish the extent of ground<br />

contamination.<br />

3.5 The main elements of the l<strong>and</strong>scaping proposal include high quality planting,<br />

with a 1.8m high green screen fence, incorporating the following details:<br />

• A 1.8m high green screen fence comprised of a weldmesh fence with pregrown<br />

ivy screen which will form a living screen wall around all three sides of<br />

the site<br />

• Access to the Site will be as existing from Townmead Road where gates will<br />

replace the green screen fence<br />

• A 5m deep planting bed with lower growing ground cover planting along the<br />

edge nearest the public footpath is proposed around all three sides of the site.<br />

The back of the planting bed will contain larger shrubs<br />

• A double row of street trees approximately 4m in height will be planted within<br />

the planting bed<br />

• In four locations a line of trees will be planted extending into the site so as to<br />

provide a depth of planting within the Site<br />

• At the junction of Townmead Road <strong>and</strong> Watermeadow Lane, a small public<br />

space will be created providing a feature within the wider public realm. This<br />

area will incorporate benches <strong>and</strong> a paved area<br />

• Part of the planting will be located in timber planters where tree <strong>and</strong> shrub<br />

planting is proposed over the existing concrete slab foundation<br />

• The proposed l<strong>and</strong>scaping will also retain the existing trees that are located<br />

along the top of the western boundary of the site<br />

3.6 Details submitted:<br />

Drawings SK-03 Rev B & SK-04<br />

4.0 PUBLICITY AND CONSULTATION<br />

4.1 The application has been advertised by way of a site notices <strong>and</strong> a press advert.<br />

In addition, individual notification letters were sent to neighbouring properties.<br />

4.2 The application has generated no objection letters from local residents.<br />

4.3 The Fulham Society made the following comments:<br />

• Replacing the existing poorly designed buildings is a positive step<br />

• Raised concerns over the loss of housing (particularly affordable housing)<br />

The Fulham Society also made reference to a previous representation which made the<br />

following comments:<br />

• Agreed the buildings in their current form had little or no merit historically or<br />

architecturally <strong>and</strong> that there was not issue in removing them<br />

• Raised concerns relating to the loss of social housing <strong>and</strong> the lack of clarity<br />

around a future development scheme coming forward


• Raised a number of queries relating to the remaining resident on site <strong>and</strong> the<br />

proposed tenure of any future scheme<br />

4.4 English Heritage raised no objections to the proposals.<br />

4.5 The Environment Agency raised no objections to the proposals.<br />

5.0 PLANNING ISSUES<br />

5.1 The main planning issues are considered to be demolition of a building within a<br />

conservation area; temporary loss of housing (including affordable housing); design<br />

(including public realm <strong>and</strong> trees); <strong>and</strong> flood Risk.<br />

Demolition of buildings within a conservation area<br />

5.2 The NPPF advocates a positive strategy for conserving <strong>and</strong> enhancing the historic<br />

environment, taking account of (amongst other things) the desirability of new<br />

development to make a positive contribution to local character <strong>and</strong> distinctiveness.<br />

Paragraph 137 of the NPPF says that Local Authorities should look for opportunities for<br />

new development within Conservation Areas to enhance or better reveal their<br />

significance.<br />

5.3 Paragraph 138 of the NPPF says that the loss of buildings which make a positive<br />

contribution to a conservation area should not be permitted. However, Paragraph 138<br />

also notes that not all elements will necessarily contribute to the conservation area.<br />

Furthermore, Paragraph 135 says that a balanced judgement will be required having<br />

regard to the scale of any harm or loss <strong>and</strong> the significance of a non-designated<br />

heritage asset.<br />

5.4 Paragraph 136 of the NPPF says that local planning authorities should not permit<br />

the loss of the whole or part of a heritage asset without taking all reasonable steps to<br />

ensure new development will proceed after the loss has occurred. In this regard,<br />

officers have considered the current contribution the buildings make to the conservation<br />

area as a `heritage asset' <strong>and</strong> the redevelopment programme that is in place to provide<br />

a replacement housing scheme. The l<strong>and</strong>scaping proposal, while planned as an interim<br />

measure, would nonetheless result in the removal of unsightly buildings <strong>and</strong> enhance<br />

the character <strong>and</strong> appearance of the conservation area.<br />

5.5 When considering development proposals in Conservation Areas, London Plan<br />

Policy 7.8 states that development affecting heritage assets <strong>and</strong> their settings should<br />

conserve their significance.<br />

5.6 Core Strategy Policy BE1 requires all new development to create a high quality<br />

urban environment that respects the surrounding setting, including heritage assets<br />

which protects <strong>and</strong> enhances conservation areas. Policy DM G7 of the Development<br />

Management Local Plan seeks to protect, restore or enhance the quality, character,<br />

appearance <strong>and</strong> setting of conservation areas.<br />

5.7 The S<strong>and</strong>s End Conservation Area Character Profile describes the special<br />

character of the S<strong>and</strong>s End Conservation Area, identifying buildings of note, historic<br />

facts <strong>and</strong> showing how the buildings, open spaces <strong>and</strong> streets work together to create<br />

an environment worthy of protection. The main feature within the conservation area,


<strong>and</strong> the principle elements in defining the character, are the river itself, the riverbank<br />

<strong>and</strong> the views along <strong>and</strong> across the Thames. Many of the historic buildings within the<br />

conservation area of architectural merit have an industrial character which represents<br />

the history of the area.<br />

5.8 The Heritage Statement that accompanied the planning application considered the<br />

relevant heritage assets which contribute to the conservation area. Officers agree with<br />

the Report's assessment that the buildings at Watermeadow Court are of no<br />

architectural or historic interest <strong>and</strong> are located some distance from those elements<br />

which contribute positively to the character <strong>and</strong> appearance of the conservation area.<br />

Accordingly the report states that the application site does not make a positive<br />

contribution to the significance of this part of the conservation area. Furthermore, the<br />

existing buildings on site do not engage with the street edge in a coherent or<br />

appropriate manner <strong>and</strong> therefore have a poor relationship with the street scene, with<br />

limited hard <strong>and</strong> soft l<strong>and</strong>scaping. In line with paragraphs 138 <strong>and</strong> 129 of the NPPF the<br />

existing buildings have therefore been assessed for their significance <strong>and</strong> it is<br />

recognised that no harm to the conservation area would occur as a result of the<br />

proposed demolition. English Heritage has been consulted on the proposals <strong>and</strong> has<br />

raised no objection to the proposed demolition. The Fulham Society also made<br />

representations on the application <strong>and</strong> confirmed that replacing the existing poorly<br />

designed buildings would be a positive step.<br />

5.9 Council officers are also of the opinion that the building design has a lack of<br />

architectural detailing <strong>and</strong> interest, using poor quality materials. Officers consider the<br />

existing architectural style to be poor <strong>and</strong> out of character with the wider conservation<br />

area. Furthermore, in order to prevent squatting <strong>and</strong> v<strong>and</strong>alism within the existing<br />

buildings, the windows have been bricked up. This is considered to add to the<br />

detrimental visual impact of the existing buildings on the character <strong>and</strong> appearance of<br />

the conservation area. Removal of all buildings on Site would therefore improve the<br />

current situation <strong>and</strong> would also provide the opportunity to visually enhance the area in<br />

the short term by way of l<strong>and</strong>scaping <strong>and</strong> in the long term when the redevelopment<br />

proposals come forward in early 2014. The proposals are therefore considered to be in<br />

line with Paragraph 137 of the NPPF as set out above.<br />

5.10 Whilst security measures have been put in place at the Site, the Site has been<br />

subject to significant fly tipping over recent years giving the general perception of a<br />

deprived <strong>and</strong> deteriorating area. This has had a negative impact on the character <strong>and</strong><br />

appearance of the conservation area <strong>and</strong> on this part of the Borough in general. The<br />

Site has also been subject to squatting in the past which has had an overall detrimental<br />

impact on the locality <strong>and</strong> the conservation area. The development proposals are<br />

specifically designed to improve security at the Site with a view to minimising the<br />

negative impact fly tipping <strong>and</strong> squatting has on the visual appearance of the area. The<br />

proposed l<strong>and</strong>scaping <strong>and</strong> fencing will therefore provide a much improved situation to<br />

what is currently on Site.<br />

5.11 In addition, demolition of the existing buildings would enable below ground<br />

investigative survey work to be undertaken in order to establish the extent of any ground<br />

contamination. Although the level of ground contamination is currently unknown, the<br />

Site's history indicates the potential for significant ground contamination. Demolition of<br />

the existing buildings would assist this survey work, thereby minimising delay to the<br />

construction programme, ensuring the comprehensive redevelopment of the Site at the<br />

earliest opportunity <strong>and</strong> in line with the JV timetable.


5.12 Although most applications for demolition in a conservation area would normally<br />

be accompanied by an application for a replacement scheme, the circumstances in this<br />

particular case, are considered unique in that LBHF are the l<strong>and</strong>owners <strong>and</strong> Officers are<br />

therefore confident that a subsequent redevelopment proposal will come forward during<br />

2014 as part of the JV. Allowing early demolition of the buildings in this case is<br />

considered acceptable because it would assist in the below ground investigative work<br />

required on site. Furthermore, the existing buildings are unsightly <strong>and</strong> not fit for<br />

purpose <strong>and</strong> allowing early demolition of the buildings would accelerate the construction<br />

programme, thereby ensuring that a replacement scheme is completed at the earliest<br />

possible date. Preventing squatting <strong>and</strong> fly tipping <strong>and</strong> associated problems by<br />

securing the Site <strong>and</strong> the proposed high quality l<strong>and</strong>scaping scheme would enhance the<br />

character <strong>and</strong> appearance of the conservation area in the short term.<br />

5.13 In summary, the existing buildings are unsightly <strong>and</strong> prone to squatting <strong>and</strong> fly<br />

tipping. Their demolition <strong>and</strong> replacement with (largely boundary) l<strong>and</strong>scaping is<br />

considered to protect <strong>and</strong> enhance the character <strong>and</strong> appearance of the conservation<br />

area. Enabling early demolition would accelerate the construction programme allowing<br />

for below ground investigative works to take place prior a subsequent planning<br />

approval. As Officers are confident that a subsequent housing proposal will come<br />

forward during 2014 as part of the JV, allowing early demolition of the buildings in<br />

advance of a replacement scheme is therefore deemed acceptable in this case.<br />

Temporary loss of housing (including affordable housing)<br />

5.14 Paragraph 49 of the NPPF states that housing applications should be considered<br />

in the context of the presumption in favour of sustainable development.<br />

5.15 London Plan Policy 3.3 sets out the Boroughs housing target <strong>and</strong> Core Strategy<br />

Policy H1 <strong>and</strong> Development Management Local Plan Policy DM A1 aim to exceed the<br />

London Plan housing targets. London Plan Policy 3.14 <strong>and</strong> Core Strategy Policy H1<br />

seek to prevent the loss of existing housing, including affordable housing, except where<br />

replacement housing is being proposed at the same or higher densities.<br />

5.16 Core Strategy Policy SFR sets out the vision for the regeneration of the South<br />

Fulham Riverside area <strong>and</strong> seeks to deliver 2, 200 additional dwellings by 2032 <strong>and</strong> 300<br />

to 500 jobs in this part of the borough.<br />

5.17 The LBHF Strategic Housing L<strong>and</strong> Availability Assessment identifies the potential<br />

of the Site to accommodate at least 120 units. This is an increase of 40 units compared<br />

with the existing development which represents a 50% increase in residential units. The<br />

Site is also identified in the South Fulham Riverside SPD. This provides a robust<br />

planning policy context for future residential development of the Site.<br />

5.18 Watermeadow Court is recognised by the Council as providing subst<strong>and</strong>ard<br />

housing accommodation, particularly in relation to the size of the units <strong>and</strong> the internal<br />

circulation space. For these reasons Watermeadow Court has been identified as<br />

surplus to requirements <strong>and</strong> has been subsequently decanted with only one leaseholder<br />

remaining on the Site.<br />

5.19 Although demolition of the existing buildings would constitute a loss of housing,<br />

Watermeadow Court is not fit for purpose <strong>and</strong> requires replacement. Therefore, its<br />

demolition would facilitate <strong>and</strong> assist a replacement housing scheme. Any new housing


would have to be built to current housing design guidelines <strong>and</strong> st<strong>and</strong>ards <strong>and</strong> could<br />

fully optimise the contribution the site makes to meeting housing need <strong>and</strong> dem<strong>and</strong> in<br />

the Borough by increasing the capacity by approximately 50%.<br />

5.20 The demolition of the existing buildings would enable below ground investigative<br />

survey work to be undertaken in order to establish the extent of any ground<br />

contamination. Having a cleared site would speed up the council's JV development<br />

process enabling construction to commence at the earliest opportunity.<br />

5.21 In summary, the established use of the site <strong>and</strong> the planning policy context<br />

remains in favour of residential development. The current housing is vacant (save for<br />

one leaseholder) <strong>and</strong> is no longer fit for occupation. The proposal would assist a<br />

housing redevelopment scheme coming forward in the near future allowing the<br />

investigative site works to commence providing certainty <strong>and</strong> speeding up the overall<br />

construction programme. The new housing would be built to current housing st<strong>and</strong>ards<br />

<strong>and</strong> should fully optimise the site.<br />

Design (including public realm <strong>and</strong> trees)<br />

5.22 The NPPF (paragraph 56) states that the Government attaches great importance<br />

to the design of the built environment. Good design is a key aspect of sustainable<br />

development, is indivisible from good planning, <strong>and</strong> should contribute positively to<br />

making places better for people.<br />

5.23 London Plan Policies 7.1, 7.4, 7.5 <strong>and</strong> 7.6 require new developments to respond<br />

to the surrounding scale <strong>and</strong> setting to provide high quality design <strong>and</strong> public realm that<br />

makes a positive contribution to the immediate, local <strong>and</strong> wider area. Policy 7.3<br />

requires new development to design out crime.<br />

5.24 Core Strategy Policy BE1 requires the creation of a high quality urban<br />

environment, which enhances the townscape <strong>and</strong> heritage assets <strong>and</strong> respects the local<br />

character <strong>and</strong> context. The character <strong>and</strong> appearance of the boroughs Conservation<br />

Areas should also be protected <strong>and</strong> enhanced. Policy DM G1 of the Development<br />

Management Local Plan builds on the above mentioned policies, seeking development<br />

which is of a high st<strong>and</strong>ard of design <strong>and</strong> compatible with the scale <strong>and</strong> character of<br />

existing development <strong>and</strong> Policy DM G1 of the Development Management Local Plan<br />

seeks to protect, restore or enhance the quality, character, appearance <strong>and</strong> setting of<br />

conservation areas.<br />

5.25 The proposed l<strong>and</strong>scaping takes the form of different layers, with low <strong>and</strong> medium<br />

level shrub planting creating a human level environment in the foreground. A small<br />

public open space is proposed at the junction of Townmead Road <strong>and</strong> Watermeadow<br />

Lane where seating would be provided. Views along the street will be enhanced with<br />

two rows of street trees of differing species, adding depth <strong>and</strong> height to the planting.<br />

Four `fingers' of planting will extend into the site adding interest from the more distant<br />

views <strong>and</strong> giving the impression that the planting extends beyond the boundary into the<br />

Site.<br />

5.26 Policy DM E4 of the Development Management Local Plan promotes greening of<br />

the Borough <strong>and</strong> aims to enhance biodiversity <strong>and</strong> green infrastructure by way of<br />

retaining existing trees <strong>and</strong> planting new ones. In this regard the existing trees on the


western boundary will be retained <strong>and</strong> the proposed development includes a significant<br />

number of new trees.<br />

5.27 The existing buildings at Watermeadow Court are considered to be of poor design,<br />

providing a low quality urban environment. They have a poor relationship with the<br />

surrounding context, providing limited opportunity for l<strong>and</strong>scaping <strong>and</strong> public realm<br />

improvements. The proposed demolition <strong>and</strong> l<strong>and</strong>scaping are considered to enhance<br />

the townscape <strong>and</strong>, due to the level of tree planting, offers significant greening <strong>and</strong><br />

improvements to the street scene.<br />

5.28 The l<strong>and</strong>scaping proposals are considered to comply with the relevant regional<br />

<strong>and</strong> local planning policies, providing a high quality scheme that will protect <strong>and</strong><br />

enhance the character <strong>and</strong> appearance of the conservation area.<br />

Flood Risk<br />

5.29 The NPPF outlines that inappropriate development in areas at risk of flooding<br />

should be avoided by directing development away from areas at highest risk. London<br />

Plan Policy 5.12 states that new development must comply with the flood risk<br />

assessment <strong>and</strong> management requirements of the former PPS25 (Development <strong>and</strong><br />

Flood Risk) <strong>and</strong> Core Strategy Policies CC1 <strong>and</strong> CC2 require new development be<br />

designed to take account of increasing risks of flooding.<br />

5.30 A Flood Risk Assessment (FRA) was submitted as part of the application. The<br />

Environment Agency was consulted on the FRA. The Environment Agency <strong>and</strong> the<br />

council raised no objection to the application being approved on the basis that the<br />

development would result in low risk of flooding.<br />

Social <strong>and</strong> Physical Infrastructure <strong>and</strong> Community Infrastructure Levy<br />

5.31 Mayoral CIL came into effect in April 2012 <strong>and</strong> is a material consideration to which<br />

regard must be had when determining any planning application. The proposed<br />

development would not be subject to the London-wide community infrastructure levy as<br />

no new floorspace is being created. However, when the residential scheme comes<br />

forward in 2014, S106 <strong>and</strong> CIL are likely to be chargeable.<br />

6.0 RECOMMENDATION<br />

6.1 Subject to there being no contrary direction from the Secretary of State That the<br />

application be approved pursuant to Regulation 3 of the Town <strong>and</strong> Country <strong>Planning</strong><br />

General Regulations 1992 subject to the condition(s) set out above.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: S<strong>and</strong>s End<br />

Site Address:<br />

Watermeadow Court L<strong>and</strong> Including Charlow Close And<br />

Bounded By Potters Road And Watermeadow Lane London<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/02623/CACHF<br />

Date Valid:<br />

27.06.2013<br />

Case Officer:<br />

Faye Mesgian<br />

Conservation Area:<br />

: S<strong>and</strong>s End Conservation Area - Number 41<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

LBHF<br />

Mr Neil Kirby 3rd Floor, Extension King Street London<br />

W6 9JU<br />

Description:<br />

Demolition of all the existing buildings.<br />

Drg Nos: SK-04; <strong>and</strong>SK-03 Rev B<br />

Application Type:<br />

Conservation Area Consent LBHF<br />

Officer Recommendation:<br />

Subject to there being no contrary direction from the Secretary of State that the<br />

application be approved pursuant to Regulation 3 of the Town <strong>and</strong> Country <strong>Planning</strong><br />

General Regulations 1992 subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Reason: Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong><br />

Country <strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong><br />

Compulsory Purchase Act 2004).<br />

2) Prior to commencement of the development hereby approved, a demolition<br />

method statement shall be submitted to <strong>and</strong> approved in writing by the Council.<br />

Details shall include control measures for dust, noise, vibration, lighting,<br />

delivery/collection locations, restriction of hours of work <strong>and</strong> all associated<br />

activities audible beyond the site boundary to 0800-1800hrs Mondays to Fridays<br />

<strong>and</strong> 0800-1300hrs on Saturdays, advance notification to neighbours <strong>and</strong> other<br />

interested parties of proposed works <strong>and</strong> public display of contact details including<br />

accessible phone contact to persons responsible for the site works for the duration<br />

of the works. Approved details shall be implemented throughout the project<br />

period.<br />

Reason: To ensure that the amenity of occupiers of surrounding premises is not<br />

adversely affected by noise, vibration, dust, lighting or other emissions from the<br />

building site, in accordance in accordance with Policies DM H5, DM H6, DM H8,<br />

DM H9, DM H10 <strong>and</strong> DM H11 of the Development Management Local Plan.<br />

3) A construction logistics plan is required in respect to the routing of vehicles to <strong>and</strong><br />

from the site for demolition <strong>and</strong> construction purposes, vehicle entry <strong>and</strong> egress<br />

from the site, <strong>and</strong> any other activities on the public highway in order to<br />

demonstrate that construction materials can be delivered, <strong>and</strong> waste removed, in a<br />

safe, efficient <strong>and</strong> environmentally-friendly way, identify deliveries that could be<br />

reduced, re-timed or even consolidated, particularly during peak periods<br />

Reason: In order to reduce congestion on local roads <strong>and</strong> ease pressure on the<br />

environment in accordance with policy DM J1 of the Development Management<br />

Local Plan.


Justification for Approving the Application:<br />

1) 1. Demolition: The proposal represents a high quality l<strong>and</strong>scaping scheme which<br />

would enhance the character <strong>and</strong> appearance of the conservation area. The<br />

development is therefore considered to be acceptable in accordance with Policies<br />

7.1, 7.2, 7.3, 7.4, 7.5, 7.6 <strong>and</strong> 7.8 of the London Plan (2011) <strong>and</strong> policy BE1 of the<br />

Core Strategy <strong>and</strong> Polices DM G7, DM G1 <strong>and</strong> DM E4 of the Development<br />

Management Local Plan (2013).<br />

2. Design: The proposal represents a high quality development which would make<br />

a positive contribution to the public realm <strong>and</strong> enhances the character <strong>and</strong><br />

appearance of the conservation area. The development is therefore considered to<br />

be acceptable in accordance with Policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6 <strong>and</strong> 7.8 of the<br />

London Plan (2011) <strong>and</strong> policy BE1 of the Core Strategy <strong>and</strong> Polices DM G7, DM<br />

G1 <strong>and</strong> DM E4 of the Development Management Local Plan (2013)<br />

3. Flood Risk: A Flood Risk Assessment (FRA) has been submitted <strong>and</strong> has<br />

considered risks of flooding to the site <strong>and</strong> adequate preventative measures have<br />

been identified <strong>and</strong> secured. The development is therefore considered to be<br />

acceptable in accordance with the NPPF <strong>and</strong> London Plan Policy 5.12 <strong>and</strong> Core<br />

Strategy Policies CC1 <strong>and</strong> CC2.<br />

4. Temporary loss of housing (including affordable housing): Although London<br />

Plan Policy 3.14 seeks to retain existing housing in London, London Plan Policy<br />

3.4 seeks to optimise housing potential. In this regard the quality of the existing<br />

housing on site is poor <strong>and</strong> redevelopment of the Site would enable the provision<br />

of better quality, fit for purpose housing whilst optimising the potential of the site<br />

which has been indentified in the SHLAA as having potential for an approximate<br />

50% increase in capacity. Increasing the density on site would be more<br />

sustainable in line with the objectives of the NPPF. The demolition would assist<br />

<strong>and</strong> accelerate a future housing scheme coming forward in 2014 <strong>and</strong> the Council<br />

have sufficient comfort from the advanced stage of the Council's JV programme<br />

that this will occur.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 24th June 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013


Consultation Comments:<br />

Comments from:<br />

English Heritage London Region<br />

Fulham Society<br />

Dated:<br />

10.07.13<br />

03.07.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

See 2013/02622/FUL for full Officer's report


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Shepherd's Bush Green<br />

Site Address:<br />

Westfield London Shopping Centre Ariel Way London<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/01768/FUL<br />

Date Valid:<br />

01.05.2013<br />

Case Officer:<br />

Neil Button<br />

Conservation Area:<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

Westfield Shoppingtowns Ltd<br />

C/o Agent<br />

Description:<br />

Extension of the existing shopping centre at roof level to comprise additional office<br />

floorspace (1490.34 sq.m.) (Class B1), relocation of existing plant <strong>and</strong> addition of new<br />

plant <strong>and</strong> other associated works.<br />

Drg Nos: WL-BGI-M5-80-DR-A-08001, WL-BGI-M5-80-DR-A-08002WL-BGI-M5-60-DR-<br />

A-08001, WL-BGI-M5-60-DR-A-08002WL-BGI-M5-65-DR-A-08001, WL-BGI-M5-65-DR-<br />

A-08002WL-BGI-M5-75-DR-A-08001, WL-BGI-M5-00-DR-A-08001WL-BGI-M5-00-DR-<br />

A-08002, WL-BGI-M5-00-DR-A-08003WL-BGI-M5-00-DR-A-08004, WL-BGI-M5-00-DR-<br />

A-08005WL-BGI-M5-00-DR-A-08006, WL-BGI-M5-00-DR-A-08008<br />

Application Type:<br />

Full Detailed <strong>Planning</strong> Application<br />

Officer Recommendation:<br />

That the application be approved subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1) (a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) The development shall be carried out <strong>and</strong> completed in accordance with the<br />

following plans submitted:<br />

WL-BGI-M5-80-DR-A-08001<br />

WL-BGI-M5-80-DR-A-08002<br />

WL-BGI-M5-60-DR-A-08001<br />

WL-BGI-M5-60-DR-A-08002<br />

WL-BGI-M5-65-DR-A-08001<br />

WL-BGI-M5-65-DR-A-08002<br />

WL-BGI-M5-75-DR-A-08001<br />

WL-BGI-M5-00-DR-A-08001<br />

WL-BGI-M5-00-DR-A-08002<br />

WL-BGI-M5-00-DR-A-08003<br />

WL-BGI-M5-00-DR-A-08004<br />

WL-BGI-M5-00-DR-A-08005<br />

WL-BGI-M5-00-DR-A-08006<br />

WL-BGI-M5-00-DR-A-08008<br />

In order to ensure full compliance with the planning application hereby approved<br />

<strong>and</strong> to prevent harm arising through deviations from the approved plans, in<br />

accordance with policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 7.8 <strong>and</strong> 7.21, of the<br />

London Plan <strong>and</strong> policies DM G1, DM G3 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan <strong>and</strong> policy BE1 of the Core Strategy.


3) The development hereby permitted shall not commence prior to the submission<br />

<strong>and</strong> approval in writing by the Council of details <strong>and</strong> samples, where appropriate,<br />

of all materials to be used on the external faces of the building, other building<br />

works <strong>and</strong> no part of the development shall be used or occupied prior to the<br />

implementation of the approved details.<br />

To ensure a satisfactory external appearance <strong>and</strong> to prevent harm to the street<br />

scene, in accordance with Policies DM G1, DM G3 <strong>and</strong> DM G7 of the<br />

Development Management Local Plan, <strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

4) No plumbing, extract flues or pipes, other than rainwater pipes shall be fixed on<br />

the external elevations of the detailed part of the development hereby approved,<br />

unless otherwise agreed in writing by the Council.<br />

To ensure a satisfactory external appearance in accordance with policies BE1 of<br />

the Hammersmith <strong>and</strong> Fulham Core Strategy (2011) <strong>and</strong> Policies DM G1, DM G3<br />

<strong>and</strong> DM G7 of the Development Management Local Plan.<br />

5) The additional class B1 (office) use shall not be occupied (excluding works relating<br />

to fitting out this use) until confirmation that a BREEAM rating of very good has<br />

been submitted to <strong>and</strong> approved in writing by the Council.<br />

In the interests of energy conservation, reduction of CO2 emissions <strong>and</strong> wider<br />

sustainability measures as recommended within the Energy Statement should be<br />

undertaken to ensure as a minimum a 25% carbon reduction in accordance with<br />

policies 5.1, 5.2, 5.3, 5.6 <strong>and</strong> 5.7 of the London Plan (2011), policies DM H1 <strong>and</strong><br />

DM H2 of the Development Management Local Plan, policy CC1 of the London<br />

Borough of Hammersmith <strong>and</strong> Fulham Core Strategy (2011).<br />

6) Prior to occupation (excluding internal fit out works) of the development, details<br />

shall be submitted to the Council <strong>and</strong> approved in writing of the external noise<br />

level emitted from the proposed plant machinery/equipment <strong>and</strong> mitigation<br />

measures as appropriate. The measures shall ensure that the external noise level<br />

emitted from plant, machinery or equipment at the development hereby approved<br />

shall be lower than the lowest existing background noise level by at least 10 dBA,<br />

as assessed according to BS4142:1997 at the nearest <strong>and</strong>/or most affected noise<br />

sensitive premises, with all machinery operating together at maximum capacity.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise from mechanical installations/ equipment, in accordance with<br />

Policies DM G1, DM G3 <strong>and</strong> DM G7 of the Development Management Local Plan.<br />

7) Prior to first occupation of the relevant part of the development hereby approved,<br />

details shall be submitted to <strong>and</strong> approved in writing by the Council of any external<br />

lighting. Details shall demonstrate that the recommendations of the Institution of<br />

Lighting Engineers in the `Guidance Notes For The Reduction Of Light Pollution<br />

2005 will be met with regard to glare, sky glow <strong>and</strong> illuminance of neighbouring<br />

facades. Approved details shall be implemented prior to occupation of the<br />

development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers adjacent to the development site <strong>and</strong><br />

surrounding premises are not adversely affected by lighting, in accordance with


Policies DM G1, DM G3 <strong>and</strong> DM H10 of the Development Management Local<br />

Plan.<br />

8) Notwithst<strong>and</strong>ing the provisions of the Town <strong>and</strong> Country <strong>Planning</strong> (General<br />

Permitted Development) (Amendment) (No.2) (Engl<strong>and</strong>) Order 1995 (or any Order<br />

revoking or re-enacting that Order with or without modification), <strong>and</strong> save for the<br />

relocation of existing aerials, antennae, satellite dishes or related<br />

telecommunications equipment, no additional aerials, antennae, satellite dishes or<br />

related telecommunications equipment shall be erected on any part of the<br />

development hereby permitted, without planning permission first being granted.<br />

To ensure that the visual impact of telecommunication equipment can be<br />

considered, in accordance with Policies DM G1, DM G3 <strong>and</strong> DM G7 of the<br />

Development Management Local Plan.<br />

9) The detailed layout <strong>and</strong> internal floor plans within the additional office floorspace<br />

shall accord with the Council's 'Access for All' Supplementary <strong>Planning</strong> Document.<br />

To ensure that the proposal provides an inclusive <strong>and</strong> accessible environment in<br />

accordance with the Council's Supplementary <strong>Planning</strong> Document (July 2013)<br />

Design Policies 1-9 <strong>and</strong> Policy 7.2 of the London Plan 2011.<br />

10) The entrance doors to all publically accessible parts of the extended office<br />

floorspace <strong>and</strong> integral lift/stair cores, hereby approved shall not be less than 1<br />

metre wide <strong>and</strong> the threshold shall be at the same level.<br />

In order to ensure the development provides ease of access for all users, in<br />

accordance with Policy 3.1 <strong>and</strong> 7.2 of the London Plan 2011, <strong>and</strong> the Council's<br />

adopted Supplementary <strong>Planning</strong> Document (July 2013) Design Policies 1-9.<br />

11) Details of any new outfall drainage systems <strong>and</strong> rainwater outlets to be installed<br />

within the new extension shall be submitted to the local planning authority for<br />

approval in writing, prior to the commencement of the relevant part of the<br />

development. For the avoidance of doubt, this excludes the removal <strong>and</strong> reinstallation<br />

of existing systems. The details shall include information on surface<br />

water drainage, including measures to be implemented to attenuate flows which<br />

will ensure the existing centre is in compliance with Sustainable Urban Drainage<br />

principles.<br />

To ensure that surface water run-off is managed in a sustainable manner, in<br />

accordance with policy 5.13 of The London Plan 2011 <strong>and</strong> Policy DM H3 of the<br />

Development Management Local Plan.<br />

12) Details of the proposed renewable energy technologies including the location <strong>and</strong><br />

design of the air source heat pumps shall be submitted to the local authority for<br />

approval, prior to the commencement of the relevant part of the development.<br />

Such technologies shall be implemented in accordance with the approved plans,<br />

prior to first occupation <strong>and</strong> shall be permanently retained thereafter.<br />

In the interests of energy conservation <strong>and</strong> reduction of CO2 emissions, in<br />

accordance with policies 5.1, 5.2, 5.3, 5.6 <strong>and</strong> 5.7 of the London Plan (2011) <strong>and</strong><br />

Policy DM H1 of the Development Management Local Plan.


13) No development works shall commence prior to the submission <strong>and</strong> approval in<br />

writing by the Council of a construction management plan <strong>and</strong> a construction<br />

logistics plan (in accordance with Transport for London guidelines), which shall<br />

include details of the steps to be taken to re-use <strong>and</strong> recycle waste, details of site<br />

enclosure throughout construction avoidance of impact on nesting birds, <strong>and</strong><br />

details of the measures proposed to minimise the impact of the construction<br />

processes on the existing amenities of the occupiers of neighbouring properties,<br />

including monitoring <strong>and</strong> control measures for dust, noise, vibration, lighting <strong>and</strong><br />

working hours, waste classification <strong>and</strong> disposal procedures <strong>and</strong> locations, <strong>and</strong> the<br />

measures proposed to prevent the passage of mud <strong>and</strong> dirt onto the highway by<br />

vehicles entering <strong>and</strong> leaving the site in connection with the demolition <strong>and</strong><br />

construction processes. All construction works shall be carried out in accordance<br />

with the approved details.<br />

In order that appropriate steps are taken to limit the impact of the proposed<br />

demolition <strong>and</strong> construction works on the amenities of local residents <strong>and</strong> the area<br />

generally, in accordance with policies DM G1, DM G3, DM H8, DM H9 <strong>and</strong> DM<br />

H10 of the Development Management Local Plan.<br />

14) Prior to occupation of the extended office floorspace, details of an Employment<br />

<strong>and</strong> Training Strategy shall be submitted to the local planning authority for<br />

approval. The Employment <strong>and</strong> Training Strategy shall comprise an over-arching<br />

strategy with the aim of prioritising <strong>and</strong> maximising access to new employment<br />

opportunities <strong>and</strong> skills training primarily for Local Residents, in relation to the<br />

operational phase of the extended office facility during the lifetime of the offices<br />

(end use) <strong>and</strong> the provision of goods <strong>and</strong> services to any part of the office facility,<br />

setting out initiatives to provide education <strong>and</strong>/or skills training opportunities <strong>and</strong><br />

employment support, advice <strong>and</strong> programmes aimed at Local Residents, including<br />

those with low skills or previously long term unemployed, to enable them to obtain<br />

knowledge, skill, experience, confidence <strong>and</strong> opportunity to gain employment in<br />

jobs (end-use) related to the offices together with the proposed costs <strong>and</strong> targets<br />

for monitoring their effectiveness.<br />

In order to ensure the development provides opportunities for increasing<br />

employment within the White City Opportunity Area <strong>and</strong> the Borough in<br />

accordance with Core Strategy policy LE1, WCOA <strong>and</strong> WCOA1 <strong>and</strong> London Plan<br />

policies 4.1, 4.2 <strong>and</strong> 4.3.<br />

Justification for Approving the Application:<br />

1) L<strong>and</strong> Uses: It is considered that the proposed extended Class B1 (office)<br />

floorspace would help strengthen <strong>and</strong> maintain the range of facilities available in<br />

Shepherd's Bush Town Centre <strong>and</strong> the Shopping Centre in accordance with policy<br />

DM C1 of the Development Management Local Plan. The proposed extended<br />

office floorspace would be to an appropriate established use (Class B1) within the<br />

White City Opportunity Area which is well served <strong>and</strong> accessible by public<br />

transport. The additional employment generating floorspace would also serve to<br />

retain <strong>and</strong> strengthen the level of office accommodation in the town centre <strong>and</strong><br />

Opportunity area. The proposed development is therefore considered acceptable,<br />

in accordance with policies 2.13, 2.14, 2.15, 4.2, 4.6, 4.7, <strong>and</strong> 4.8 of the London<br />

Plan (2011) <strong>and</strong> Strategic Policies WCOA <strong>and</strong> WCOA1 which require the wider


egeneration of the White City area <strong>and</strong> Strategic Policies B <strong>and</strong> C <strong>and</strong> CF1 of the<br />

Hammersmith <strong>and</strong> Fulham Core Strategy (2011).<br />

Design: It is considered that the proposed rooftop extension would relate<br />

sympathetically to the existing rooftop office box <strong>and</strong> the main shopping centre<br />

building, in terms of scale, height, materials, massing <strong>and</strong> bulk <strong>and</strong> would<br />

comprise the prerequisite high quality required for new development. It is<br />

considered that although being visible from views from the east, there are no<br />

sensitive views from within LBHF or the neighbouring Royal Borough of<br />

Kensington <strong>and</strong> Chelsea that are affected. As such, it is considered that the<br />

proposed development would not have any adverse impact on the setting of<br />

nearby conservation areas or local townscape <strong>and</strong> the proposed development<br />

would positively contribute to the skyline of this part of White City. The proposed<br />

development is therefore considered acceptable in accordance with policies 7.1,<br />

7.2, 7.3, 7.4, 7.5, 7.6, 7.7 <strong>and</strong> 7.8 of the London Plan (2011) requiring high quality<br />

inclusive development providing safe <strong>and</strong> secure environments which respond to<br />

their setting <strong>and</strong> are of high architectural quality with high quality public realm <strong>and</strong><br />

policies BE1, WCOA <strong>and</strong> WCOA1 of the London Borough of Hammersmith <strong>and</strong><br />

Fulham Core Strategy (2011) requiring a high quality urban environment <strong>and</strong><br />

policies DM G1, DM G3 <strong>and</strong> DM G7 requiring development does not harm the<br />

setting of conservation areas <strong>and</strong> listed buildings <strong>and</strong> is of a high st<strong>and</strong>ard of<br />

design.<br />

Residential Amenity: It is considered that given the scale, height <strong>and</strong> position of<br />

the extension representing a continuation of the existing rooftop office box, <strong>and</strong> the<br />

urban context adjacent to the site which includes the West Cross Route, West<br />

London line <strong>and</strong> the H-junction, the impact of the proposals, in terms of<br />

overshadowing, privacy, daylight <strong>and</strong> sunlight to existing surrounding properties<br />

would be acceptable <strong>and</strong> in accordance with policies 3.5, 3.6, 3.8, 7.3, 7.6, 7.7,<br />

7.14 <strong>and</strong> 7.15 of the London Plan (2011), policies BE1 of the London Borough of<br />

Hammersmith <strong>and</strong> Fulham Core Strategy (2011) <strong>and</strong> policies DM G1 <strong>and</strong> DM G3<br />

of the Development Management Local Plan.<br />

Transport <strong>and</strong> Parking: No additional car parking to serve the proposed<br />

development is considered to be necessary in light of the current on-site parking<br />

capacity to cater for any additional dem<strong>and</strong>. It is considered that the existing<br />

parking provision, coupled with the high public transport capacity of the site would<br />

ensure that the extended office floorspace would be easily accessible for visitors<br />

<strong>and</strong> staff. It is considered that the overall traffic impact of the proposed<br />

development (of the extended office floorspace) would be marginal <strong>and</strong> as such,<br />

the traffic impact would be acceptable <strong>and</strong> in accordance with policy DM J1 of the<br />

Development Management Local Plan. The proposed cycle parking levels are<br />

considered to be acceptable in light of the existing provision, <strong>and</strong> therefore would<br />

be in accordance policy DM G5 set by the Development Management Local Plan.<br />

It is considered that any impacts arising from the development would be mitigated<br />

by conditions. Subject to conditions, the proposed development is therefore<br />

considered acceptable in accordance with policies 6.1, 6.3, 6.9, 6.10, 6.11, 6.13,<br />

of the London Plan (2011) <strong>and</strong> policy T1 <strong>and</strong> CC3 of the London Borough of<br />

Hammersmith <strong>and</strong> Fulham Core Strategy (2011) <strong>and</strong> policies DM J2, DM J3 <strong>and</strong><br />

DM J5 of the DM Local Plan (2013).


Sustainability: The proposed development has been designed to a BREEAM rating<br />

of Very Good. The proposed development will include passive design measures<br />

which are set out in the Energy Strategy. The proposed C02 emissions for the<br />

development itself are in general compliance with the requirement set out in<br />

London Plan policy 5.2. The proposed development is therefore considered<br />

acceptable in accordance with policies 5.1, 5.2, 5.3, 5.6, 5.7, 5.8, 5.9, 5.11, 5.12,<br />

5.13, 5.14, 5.15, <strong>and</strong> 7.19 of the London Plan (2011), <strong>and</strong> policies CC1, CC2 <strong>and</strong><br />

H3 of the London Borough of Hammersmith <strong>and</strong> Fulham Core Strategy (2011) <strong>and</strong><br />

policies H1, H2 <strong>and</strong> H3 of the Development Management Local Plan.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 30th April 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

Royal Borough Of Kensington And Chelsea<br />

Dated:<br />

08.05.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

27 Stebbing House 5 Queensdale Crescent London W11 4TE 29.05.13<br />

1.0 BACKGROUND<br />

1.1 The application site relates to the roof space to the north of the Net-a-Porter offices<br />

situated on the eastern side of the Westfield Shopping Centre, in Shepherd's Bush.<br />

The roof space currently houses rooftop plant <strong>and</strong> machinery which serves the existing<br />

centre.<br />

1.2 The Net-a-Porter offices are located on the upper floors of the shopping centre<br />

within a two storey rectangular box which part overhangs the eastern access road at<br />

roof level. <strong>Planning</strong> permission has recently been granted for a roof top extension above<br />

the Marks & Spencer's to provide new retail <strong>and</strong> leisure uses (in May 2013). This<br />

extension would infill part of the gap in the roof level between the Vue cinema roof<br />

addition on the northern side of the shopping centre <strong>and</strong> the Net-a-Porter offices on the<br />

eastern side. There would be a resulting gap between the retail <strong>and</strong> leisure extension<br />

<strong>and</strong> the existing Net-a-Porter offices which this proposal seeks to infill.


1.3 Ariel Way <strong>and</strong> the White City Industrial Estate lie immediately to the north of the<br />

application site. The White City Industrial Estate comprises warehouses, offices <strong>and</strong><br />

distributions units. Outline planning permission was granted (in March 2012) for the<br />

comprehensive redevelopment of the l<strong>and</strong> for mixed use purposes including an<br />

extension to the Westfield London Shopping Centre to provide circa 60,000 sqm retail,<br />

restaurant, community, offices <strong>and</strong> leisure floorspace <strong>and</strong> 1,522 residential units.<br />

1.4 White City Underground Station is located approximately 450 metres northwest of<br />

the Site, while Shepherds Bush Underground Station is located approximately 530<br />

metres to the south of the site. Both stations are served by the Central Line.<br />

Shepherds Bush station was rebuilt with a relocated entrance as part of the<br />

development of Westfield London. In addition, as part of the original Westfield London<br />

shopping centre development, an integrated bus station interchange <strong>and</strong> London<br />

Overground Station served by the West London Line <strong>and</strong> Southern train services were<br />

constructed adjacent to Shepherds Bush underground station. Wood Lane<br />

Underground Station is located approximately 300 metres to the west of the site <strong>and</strong> is<br />

served by the Hammersmith <strong>and</strong> City Line. This is an entirely new station built as part<br />

of the Westfield London development.<br />

1.5 The l<strong>and</strong> to the east of the shopping centre comprises an internal service road<br />

which connects Shepherd's Bush Bus Station with the White City Bus Station. The<br />

service road contains a number of bus st<strong>and</strong>s <strong>and</strong> coach drop-off bays which serve the<br />

shopping centre. The West London Line Overground line lies immediately to the east of<br />

the service road. The West Cross Route lies immediately to the east of the rail line<br />

which includes a raised H-junction section that provides vehicular access to the<br />

shopping centre. There is a free-st<strong>and</strong>ing lift/stair tower which provides pedestrian<br />

access from the raised footway area at the top of the H-junction to the lower ground<br />

level <strong>and</strong> the service road.<br />

1.6 The site is located within the White City Opportunity Area as designated in the<br />

London Plan (2011) <strong>and</strong> the London Borough of Hammersmith <strong>and</strong> Fulham Core<br />

Strategy (2011). Westfield Shopping Centre is located within the Shepherd's Bush Town<br />

Centre which is a Metropolitan Town Centre in the Core Strategy <strong>and</strong> London Plan.<br />

1.7 The site is not located within a conservation area <strong>and</strong> there are no heritage assets<br />

immediately adjacent to the part of the building where the extension is proposed. The<br />

nearest heritage asset is the Grade II listed Dimco building which comprises a bus<br />

stabling facility. This is located approximately 100m from the area where the extension<br />

is proposed to the west. Wood Lane Conservation Area is located to the north of the<br />

Hammersmith <strong>and</strong> City Line viaduct.<br />

<strong>Planning</strong> History<br />

1.8 <strong>Planning</strong> permission (Ref: 1993/01830/OUT) was granted for a major mixed use<br />

development incorporating retail, leisure, residential, workshops <strong>and</strong> a new rail station<br />

which became Westfield London on 29 March 1996. A further outline planning<br />

permission (Ref: 2000/01642/OUT) was granted in January 2003 for the south-west<br />

corner retail expansion. Changes have been made as follows to vary these<br />

permissions:<br />

- Condition 8 attached to the 1996 permission restricted the gross lettable retail<br />

floorspace (excluding plant <strong>and</strong> circulation space) such that it was restricted to 57,598


sqm, with the space to be used for Class A1, A2 or A3 purposes. This condition has<br />

now been varied twice as follows.<br />

- In July 2000, permission was granted to vary condition 8 of the outline permission<br />

to increase the Class A3 floorspace from 3,558 sqm to 20,486 sqm. The new Class A3<br />

floorspace comprised additional restaurants, food court units <strong>and</strong> other space previously<br />

shown illustratively in the previously proposed link building between the main building<br />

<strong>and</strong> the Dimco buildings.<br />

- (Ref: 2005/00168/VAR) In June 2004, as a result of additional space required by<br />

an anchor store within the development, an application was made to vary Condition 8 of<br />

the 1996 outline planning permission (adding to the 57,597 sqm already permitted) by<br />

allowing a further 5,575 sqm Class A1/A2/A3 retail floorspace. This application was<br />

withdrawn <strong>and</strong> a new application submitted in January 2005, again to vary Condition 8<br />

of the 1996 outline planning permission to allow a further 5,575 sqm Class A1/A2/A3<br />

retail floorspace. A resolution by LBHF to approve the proposal was made in June<br />

2005.<br />

1.9 Condition 6 attached to the December 2002 permission requires that the gross<br />

lettable (Class A1) floorspace shall not exceed 29,100 sqm.<br />

1.10 On 29 March 2012, LBHF granted outline planning consent (Ref:<br />

2011/02940/OUT) for the redevelopment of l<strong>and</strong> to the north of Ariel Way to allow a<br />

mixed use scheme consisting of new additions <strong>and</strong> alterations to the existing Westfield<br />

London shopping centre. The permitted scheme comprises up to 50,855 sqm Class A1<br />

(Retail), up to 5,070 sqm Classes A3, A4 <strong>and</strong> A5 (Restaurants, Cafes, Bars, Hot-food<br />

Take-away use), up to 540 sqm Class B1 (Offices), up to 1,520 sqm Class D1<br />

(Community use) <strong>and</strong> up to 1,758 sqm Class D2 (Leisure use) floorspace, as well as up<br />

to 1,522 residential units.<br />

1.11 On the 29th May 2013, LBHF granted planning consent (Ref: 2013/01074/FUL) for<br />

an extension of the existing shopping centre at roof level to comprise 3,092 sqm (Gross<br />

Internal Area (GIA)) retail floorspace (A1 Use Class) <strong>and</strong> 7,249 sqm (GIA) leisure<br />

floorspace (D2 Use Class), including identification of external signage zones, relocation<br />

of existing plant <strong>and</strong> addition of new plant <strong>and</strong> other associated works.<br />

2.0 DEVELOPMENT PROPOSALS<br />

2.1 The development would comprise the erection of a roof level extension immediately<br />

to the north of the existing Net-a-Porter office accommodation, located on the eastern<br />

elevation of Westfield London. The proposal would create an additional 1490.34sqm of<br />

Class B1 (office) floorspace (Gross Internal Area).<br />

2.2 The proposals comprise an extension to the existing offices of Net-a-Porter which<br />

are located at Level 60. The extension to Net-a-Porter's offices would be facilitated by a<br />

roof extension above Level 55 which will provide Net-a-Porter with additional office<br />

accommodation adjacent to their existing offices at Level 60. The proposed<br />

development would also displace existing roof plant located on the roof of Level 55. This<br />

plant would be relocated to the roof of the existing Net-a-Porter offices (Level 65), <strong>and</strong><br />

additional plant will need to be located in this area. The applicant has confirmed that the<br />

additional B1 office floorspace is required by Net-a-Porter to serve their operational<br />

requirements.


2.3 The proposed extension will mirror the height of the existing two storey offices,<br />

which st<strong>and</strong> at 38.95 m AOD. The extension will project northwards across four<br />

structural bays, totalling approximately 32m in length. In terms of design, the proposed<br />

development will appear as a seamless extension to the existing roof level office<br />

accommodation which runs parallel with the eastern elevation of the shopping centre<br />

with a slight projecting facade.<br />

2.4 As a consequence of the proposed extension, the relocation of existing roof level<br />

plant forms part of these proposals. This plant, together with additional new plant would<br />

be accommodated within a new plant deck on top of the roof of the existing Net-a-<br />

Porter offices, located immediately to the south of the proposed office extension. The<br />

new plant deck would be screened by perimeter louvres. The top of the plant deck<br />

would st<strong>and</strong> at 4.6m above the existing roof ridge level.<br />

2.5 The following technical reports <strong>and</strong> documents have been submitted in support of<br />

the full planning application:<br />

- Application drawings by Buchans/Westfield;<br />

- <strong>Planning</strong> Statement by Montagu Evans;<br />

- Design <strong>and</strong> Access Statement, including Waste Management Statement, Acoustic<br />

Statement <strong>and</strong> SUDS Statement by Buchans/Westfield;<br />

- Energy <strong>and</strong> Sustainability Statement by Cudd Bentley;<br />

- Transport Statement (including Travel Plan, March 2013) by Vectos <strong>and</strong>;<br />

- CIL Information Form by Montagu Evans.<br />

3.0 CONSULTATIONS<br />

3.1 The application has been advertised by way of 6 x site notices (dated 24/05/13) <strong>and</strong><br />

a newspaper press release (dated 24/05/13). Letters of notification were sent to 386<br />

adjacent properties including properties within the Royal Borough of Kensington <strong>and</strong><br />

Chelsea (RBKC).<br />

One response has been received objecting to the application but did not set out the<br />

planning grounds for the objection.<br />

Shepherd's Bush Town Centre Manager: No response:<br />

Hammersmith <strong>and</strong> Fulham Access <strong>and</strong> Disability Forum: No response<br />

Transport for London: No objections to the proposals subject to provision of financial<br />

infrastructure contribution towards White City Opportunity Area, provision of cycle safety<br />

measures <strong>and</strong> travel plans. Further comments incorporated into Transport <strong>and</strong> Parking<br />

section in the main body of this report.<br />

Royal Borough of Kensington <strong>and</strong> Chelsea (RBKC): No response<br />

The following tenants <strong>and</strong> residents associations have been consulted:<br />

McFarlane Road, Wood Lane Residents, Wood Lane Tenants, White City Community<br />

Group, White City Neighbourhood Forum, White City Residents <strong>and</strong> Edward Woods<br />

Estate Residents: No responses have been received at the date of writing the report.<br />

Hammersmith Society: No objections raised to proposals.


Environment Agency: No response<br />

Thames Water: No response<br />

London Fire <strong>and</strong> Emergency Service: No response<br />

Network Rail: No response<br />

National Air Traffic services: No response<br />

British Airports Authority: No response<br />

Hammersmith <strong>and</strong> Fulham Primary Care Trust (PCT): No response<br />

Environmental Impact Assessment:<br />

3.2 Having regard to the duty on the Council under regulation 7 of the Town <strong>and</strong><br />

Country <strong>Planning</strong> (Environmental Impact Assessment) Regulations 2011 (the EIA<br />

Regulations) Officers have considered whether the office application is one which<br />

should require an environmental impact assessment given the cumulative effect of the<br />

developments occurring on this site. Officers have reviewed the information submitted<br />

as part of the application <strong>and</strong> other recent approved applications as part of our<br />

consideration. Having done so, in this case it is concluded that an environmental impact<br />

assessment is not required for the following reasons:<br />

3.3 Whilst it is noted that the recent phase 2 expansion plans, the original planning<br />

application <strong>and</strong> subsequent modified consents on this site were both subject to<br />

environmental impact assessments, this application, like the retail <strong>and</strong> leisure extension<br />

(approved recently) is a self-contained application for planning permission. It is not an<br />

application for a change to or extension of an EIA development, <strong>and</strong> consequently<br />

schedule 2 paragraph 13 to the EIA regulations does not apply.<br />

3.4 The area of development comprised in the application is less than 0.5 hectares <strong>and</strong><br />

it is considered that the development subject of this application would be unlikely to<br />

have significant environmental effects when judged on its own account or cumulatively<br />

with other development in the area (this 'other development' includes the development<br />

to the north of the Westfield London centre which was permitted by the council in March<br />

2011 but which has not yet commenced (ref: 2011/02940/OUT) <strong>and</strong> the recently<br />

approved retail <strong>and</strong> leisure extension (ref: 2013/01074/FUL). For this reason, it is<br />

considered that a full environmental impact assessment is not required to support the<br />

development proposed in this application.<br />

4.0 PLANNING CONSIDERATIONS:<br />

4.1 The main planning considerations are as follows:<br />

Principle of Development<br />

Suitability of L<strong>and</strong> Uses<br />

Design<br />

Impact on Neighbouring Properties<br />

Transport <strong>and</strong> Parking


Sustainability <strong>and</strong> Energy<br />

Access<br />

Noise<br />

Flood Risk<br />

<strong>Planning</strong> Obligations<br />

Principle of Development<br />

4.2 The application needs to be considered in accordance with the provision which<br />

requires determinations to be in accordance with the development plan where relevant<br />

unless material considerations indicate otherwise. The development plan for the<br />

Borough consists of the London Plan, the Council's Core Strategy <strong>and</strong> the Development<br />

Management Local Plan. Outside the development plan there is also important<br />

guidance with the National <strong>Planning</strong> Policy Framework (NPPF) where there is a<br />

presumption in favour of sustainable development.<br />

4.3 Both the NPPF <strong>and</strong> the London Plan advocate the need to optimise the use of l<strong>and</strong><br />

<strong>and</strong> accommodate economic growth through intensification specifically within areas of<br />

high public transport accessibility.<br />

4.4 The site falls within the White City Opportunity Area (WCOA) as identified within the<br />

London Plan <strong>and</strong> the Council's Core Strategy. Within the London Plan, Opportunity<br />

Areas (OAs) are defined as 'the capital's major reservoir of brownfield l<strong>and</strong> with<br />

significant capacity to accommodate new housing, commercial <strong>and</strong> other development<br />

linked to existing or potential improvements to public transport accessibility'. Part B of<br />

Policy 2.13 (Opportunity Areas <strong>and</strong> Intensification Areas) states that development<br />

proposals within OAs should 'seek to optimise residential <strong>and</strong> non-residential output <strong>and</strong><br />

densities, provide necessary social <strong>and</strong> other infrastructure to sustain growth, <strong>and</strong>,<br />

where appropriate, contain a mix of uses'.<br />

4.5 One of the key challenges identified within the LBHF Core Strategy is the need to<br />

regenerate town centres <strong>and</strong> local centres, specifically through the better utilisation of<br />

sites within the designated town centres to ensure the continued provision of a wide<br />

range of high quality retailing, services, arts <strong>and</strong> cultural <strong>and</strong> other leisure facilities to<br />

serve local residents, visitors <strong>and</strong> workers.<br />

4.6 Both the Development Management <strong>and</strong> the Core Strategy seek the regeneration of<br />

areas <strong>and</strong> aim to sustain a mix of uses. Strategic Policy A of the Core Strategy<br />

(<strong>Planning</strong> for Regeneration <strong>and</strong> Growth) recognises the need to focus regeneration <strong>and</strong><br />

growth within the WCOA <strong>and</strong> the other key regeneration areas. The supporting text to<br />

the policy notes that dem<strong>and</strong> exists for offices within the town centre <strong>and</strong> encourages<br />

such provision as it can continue to support <strong>and</strong> enhance the local economy. Office<br />

uses are also supported within the strategic opportunity area policies.<br />

4.7 The Application seeks to provide new Class B1 (office) floorspace connected to an<br />

existing office. The offices which are being enlarged relates to Net-a-Porter who are an<br />

established on-line retailer. It is considered that the provision of offices would serve to<br />

complement the variety of l<strong>and</strong> uses in the shopping centre <strong>and</strong> of Shepherds Bush<br />

Metropolitan Town Centre. As a result of the development, it is considered that<br />

Shepherds Bush's status as a diverse town centre destination would be enhanced. As<br />

such, it is considered that the principle of development is in full accordance with<br />

planning policy requirements.


Town Centre Uses<br />

4.8 The NPPF confirms that offices comprise a town centre use. The planning policy<br />

context for increased town centre uses is enshrined within various planning policy<br />

documents. At the national level, Chapter 2 of the NPPF refers to the need to ensure<br />

the vitality of town centres <strong>and</strong> states the need to promote competitive town centre<br />

environments.<br />

4.9 The site falls within Shepherds Bush Town Centre, identified in Annex 2 Table A2.1<br />

of the London Plan (2011) as a Metropolitan Town Centre, having been elevated from a<br />

Major Town Centre as set out within the previous iteration of the London Plan. Policy<br />

2.15 of the London Plan (Town Centres) states that town centres should be the main<br />

foci beyond the Central Activities Zone for commercial development <strong>and</strong> intensification,<br />

<strong>and</strong> that development proposals should seek to accommodate economic growth<br />

through intensification <strong>and</strong> selective expansion in appropriate locations.<br />

4.10 The Council's adopted Core Strategy recognises the elevated status of Shepherds<br />

Bush Town Centre, with Strategic Policy C (Hierarchy of Town <strong>and</strong> Local Centres)<br />

stating that the priority is to strengthen the town centre by encouraging commercial <strong>and</strong><br />

leisure based development <strong>and</strong> uses that will help regenerate town centre functions <strong>and</strong><br />

linkages with the WCOA.<br />

4.11 Policy DM C1 of the Development Management DPD states that the Council will<br />

support proposals that aim to enhance the viability <strong>and</strong> vitality of the town centres <strong>and</strong><br />

will seek to ensure a range of accessible shopping <strong>and</strong> other town centre uses to meet<br />

the needs of local residents, workers <strong>and</strong> visitors.<br />

4.12 The proposals would provide additional retail office floorspace. It is considered that<br />

this use would contribute to the vitality of the town centre <strong>and</strong> the future viability of the<br />

location.<br />

Provision of Offices (Class B1)<br />

4.13 The principle of the provision of additional commercial floorspace within the town<br />

centre is strongly encouraged within the adopted development plan. London Plan Policy<br />

4.2 (Offices) is supportive of office development in viable locations with good public<br />

transport, ideally within mixed use developments. At the local level, both the Core<br />

Strategy <strong>and</strong> the Draft WCOAPF refer to the development of office accommodation.<br />

Core Strategy Strategic Policy B promotes office based development as part of a mixed<br />

use approach within the WCOA, while the Draft WCOAPF notes the importance of<br />

attracting office based occupiers, <strong>and</strong> further recognises that there is continued dem<strong>and</strong><br />

for office space within the Town Centre, due to excellent transport links at this location.<br />

4.14 The Development Management Local Plan supports the Core Strategy <strong>and</strong> Draft<br />

WCOAPF in this regard. Policy DM B1 refers to the need to provide for a range of<br />

employment uses <strong>and</strong> states that the council will support proposals for new employment<br />

uses that are of an appropriate scale <strong>and</strong> nature, with the expectation that the majority<br />

of new office space will be delivered within the Town Centre <strong>and</strong> wider WCOA.<br />

4.15 The Application provides the opportunity to support the provision of additional<br />

office accommodation within the town centre. This proposal will enhance <strong>and</strong> diversify<br />

the mix of uses within the town centre <strong>and</strong> will contribute to maintaining its vitality <strong>and</strong>


viability. The expansion of Net-a-Porter would result in the delivery of additional B1<br />

office space thereby enhancing the range of employment uses within the town centre.<br />

The proposed development would be accommodated within an accessible location in<br />

the town centre <strong>and</strong> would form part of an existing mixed-use development. In this<br />

regard the proposals would respond to the requirements of the development plan at all<br />

tiers.<br />

4.16 The applicant has stated in their planning statement that the proposals would<br />

directly support the bespoke operational requirements of a global online fashion retailer<br />

within Shepherds Bush Metropolitan Town Centre. Officers acknowledge the<br />

importance of retaining such an operation within the borough <strong>and</strong> support the principle<br />

of its expansion, in light of the likely positive impacts on the town centre.<br />

4.17 In accordance with the HCA Guidance on Employment Densities (2010), the<br />

proposed development would result in approximately 122 new jobs (FTE) based on a<br />

Net Internal Area for the extension of 1,467.64 sqm. The provision of additional jobs<br />

within the WCOA <strong>and</strong> within Shepherds Bush Town Centre is in accordance with<br />

regional <strong>and</strong> local planning policy.<br />

Design <strong>and</strong> Access<br />

4.18 High quality <strong>and</strong> inclusive design is encouraged at all policy levels. The NPPF<br />

notes that good design is a key aspect of sustainable development, <strong>and</strong> should<br />

contribute positively to making places better for people. The NPPF also states that local<br />

planning authorities should identify <strong>and</strong> assess the particular significance of any<br />

heritage asset that may be affected by a proposal (including by development affecting<br />

the setting of a heritage asset) taking account of the available evidence <strong>and</strong> any<br />

necessary expertise. They should take this assessment into account when considering<br />

the impact of a proposal on a heritage asset, to avoid or minimise conflict between the<br />

heritage assets conservation <strong>and</strong> any aspect of the proposal.<br />

4.19 Chapter 7 of the London Plan sets out the Mayor's policies on a number of issues<br />

relating to London's places <strong>and</strong> spaces. Policy 7.2 (An Inclusive Environment) requires<br />

all new development in London to achieve the highest st<strong>and</strong>ards of accessible <strong>and</strong><br />

inclusive design, while Policy 7.4 (Local Character) states that 'development should<br />

have regard to the form, function, <strong>and</strong> structure of an area, place or street <strong>and</strong> the<br />

scale, mass <strong>and</strong> orientation of surrounding buildings'. Part D of Policy 7.6 (Architecture)<br />

states that buildings <strong>and</strong> structures should 'not cause unacceptable harm to the amenity<br />

of surrounding l<strong>and</strong> <strong>and</strong> buildings'.<br />

4.20 Core Strategy Policy BE1 (Built Environment) states that all development within<br />

Hammersmith <strong>and</strong> Fulham should create a high quality urban environment. It adds that<br />

there should be an approach to accessible <strong>and</strong> inclusive urban design which responds<br />

to the townscape context <strong>and</strong> considers how good design <strong>and</strong> l<strong>and</strong> use can be<br />

integrated to help regenerate places. The Core Strategy further states that WCOA<br />

should be a model of high quality urban design, sustainable architecture <strong>and</strong><br />

construction situated within a first class permeable, accessible <strong>and</strong> inclusive public<br />

realm.<br />

4.21 The GLA has also published Supplementary Guidance to the London Plan. SPG:<br />

Achieving an Inclusive Environment provides detailed advice <strong>and</strong> guidance on providing<br />

inclusive design in London. LBHF adopted the LDF SPD Access for All in March 2006.


This document highlights important principles in designing inclusive buildings <strong>and</strong> open<br />

spaces. Paragraph 1.9 states that 'high quality <strong>and</strong> inclusive design should apply to all<br />

development, including individual buildings, public <strong>and</strong> private spaces <strong>and</strong> wider<br />

development schemes. This creates an environment that functions well <strong>and</strong> is<br />

accessible to everyone'.<br />

4.22 The Local Plan Policy DM G1 (Design of New Build) discusses the design<br />

requirements of new proposals with the compatibility of new development with the scale<br />

<strong>and</strong> character of the existing development to be of considerable importance. It adds<br />

that designs need to respect the local design context, including the prevailing rhythm<br />

<strong>and</strong> articulation of frontages within the area. Policy DM G3 (Alterations <strong>and</strong> Extensions)<br />

requires that the development should be successfully integrated into the existing<br />

architectural design, with the impact on scale, mass <strong>and</strong> vertical/horizontal emphasis to<br />

be of particular design importance. Policy DM G7 (Heritage <strong>and</strong> Conservation) states<br />

that the council will aim to protect, restore or enhance the quality, character,<br />

appearance <strong>and</strong> setting of the borough's conservation areas.<br />

4.23 The proposals have been prepared in consultation with design officers at LBHF<br />

with the intention of creating a seamless extension to the existing roof level office box<br />

above the shopping centre on the eastern side. It is considered that the extended office<br />

box would sit comfortably within the existing form of the centre <strong>and</strong> its surroundings.<br />

4.24 A comprehensive Design <strong>and</strong> Access Statement is submitted in support of the<br />

Application <strong>and</strong> demonstrates the design merits of the proposals by way of a<br />

photomontage showing the scheme in context with the existing building with <strong>and</strong> without<br />

the consented leisure <strong>and</strong> retail scheme. The roof level extension comprises a<br />

continuation of the existing Net-a-Porter office box. It has been designed to take into<br />

consideration the existing scale <strong>and</strong> massing of the centre, other roof level<br />

enlargements such as the Vue Cinema box (on the northern part of the roof adjacent to<br />

the Dimco building) <strong>and</strong> the scale <strong>and</strong> height of the proposed retail <strong>and</strong> leisure<br />

extension above M&S on the north eastern corner.<br />

4.25 Visually, the proposed Net-a-Porter offices combined with the proposed leisure <strong>and</strong><br />

retail extension will fill-in existing gaps in the elevations between the existing Net a<br />

Porter office space on the eastern elevation <strong>and</strong> the existing Vue cinema box on the<br />

northern elevation. It is considered that the proposed office extension would closely<br />

relate to the scale <strong>and</strong> appearance of the existing Net-a-Porter office structure <strong>and</strong> the<br />

form of the façade has been articulated to reference this relationship.<br />

4.26 The existing height of the two storey office block occupied by Net-a-Porter is<br />

38.95m AOD. This existing building height will be mirrored by the height of the proposed<br />

roof extension. The existing roof height at the location of the proposed extension is<br />

currently 28.65m AOD <strong>and</strong> therefore this proposal will increase the height of the centre<br />

in this location by 10.3m. The proposed roof extension will infill the existing gap in the<br />

elevation between Net-a-Porter offices <strong>and</strong> the proposed retail <strong>and</strong> leisure unit above<br />

Marks <strong>and</strong> Spencer' in the north-east corner.<br />

4.27 The proposed extension will complete the eastern elevation through a seamless<br />

extension to the existing office block which will also complement its massing <strong>and</strong><br />

articulation. Due consideration has been given to the surrounding area <strong>and</strong> in particular<br />

the relationship between the proposed roof extension <strong>and</strong> the proposed retail <strong>and</strong><br />

leisure development to the north.


4.28 The appearance of the scheme has been designed as an extension to the existing<br />

façade language <strong>and</strong> massing. As such, the existing palette of materials <strong>and</strong> colours is<br />

to be extended into the new development.<br />

4.29 In summary, the design of the proposed roof extension is considered to fully<br />

accord with the relevant policies of the London Plan, Core Strategy <strong>and</strong> Development<br />

Management Local Plan.<br />

Heritage Considerations<br />

4.30 The roof extension would not be seen within any key views with the Grade II listed<br />

Dimco building, currently used as a substation <strong>and</strong> bus st<strong>and</strong> on Ariel Way. As such, the<br />

proposals are not considered to have any impacts on its setting.<br />

4.31 The other nearby heritage assets are the Wood Lane Conservation Area <strong>and</strong> the<br />

Grade II listed BBC Television Centre, both of which are to the north of the<br />

Hammersmith <strong>and</strong> City Line viaduct <strong>and</strong> a significant distance from the roofspace where<br />

the proposed extension is to be located. There are no Conservation Areas in RBKC<br />

immediately adjacent to the West Cross Route at this point.<br />

4.32 As such, there are considered to be no adverse impacts upon nearby heritage<br />

assets.<br />

Townscape <strong>and</strong> Visual Impact<br />

4.33 Views of the proposed extension from the pedestrian public realm would be limited<br />

to the raised H junction above the A3220 (West Cross Route). Although the corner of<br />

the Shopping Centre itself presents an important elevation to the West Cross Route <strong>and</strong><br />

to pedestrians accessing the site from the east side of the West Cross Route, the office<br />

extension is set back from the corner in a visually less prominent position. As such, the<br />

impact of the development on the townscape is considered to be limited.<br />

4.34 Officers have considered the cumulative effects of the proposed roof extension,<br />

alongside the approved retail <strong>and</strong> leisure extension on the corner of the shopping<br />

centre. It is considered that the roofscape in the north east corner does not have a<br />

strong presence in urban design terms. It lacks either the setback element of the<br />

cinema box on the north elevation or the glazed cantilever of the Net a Porter offices on<br />

the eastern elevation facing the West Cross Route. Both developments provide<br />

opportunities to reinforce a more continuous <strong>and</strong> consistent roofscape <strong>and</strong> create a<br />

stronger corner with more presence in townscape terms. The Net-a-Porter extension is<br />

considerably smaller in scale <strong>and</strong> in height compared to the retail <strong>and</strong> leisure extension.<br />

4.35 The current office proposal <strong>and</strong> consented leisure/retail scheme would also be<br />

seen in the context of the consented Westfield 2 development which will include a<br />

residential tower on the North West corner of the H junction opposite the north east<br />

corner of the shopping centre. Individually <strong>and</strong> collectively, it is considered that the<br />

office extension would not have any harmful impacts on the surrounding townscape.<br />

Access<br />

4.36 The proposed floorspace would be accessed via the existing offices at level 60<br />

from the main Shopping Centre. Lift access is provided from within the existing offices


(Core 10) to ensure the new floorspace is fully accessible <strong>and</strong> level thresholds would<br />

need to be secured by way of condition. Core 25 is extended to provide a new stairway<br />

between the two new floors. It is considered that the proposal is fully accessible <strong>and</strong><br />

would be compliant with the relevant planning policies relating to access.<br />

Design Conclusions<br />

4.37 The proposal is considered to be a high quality of design which makes good use of<br />

a site in the town centre <strong>and</strong> WCOA <strong>and</strong> will assist the regeneration <strong>and</strong> vitality of both,<br />

whilst filling in either all (if implemented alongside the leisure/retail extension) or part of<br />

the gap in the east section of the shopping centre building in townscape terms. It is<br />

considered that the setting of adjacent heritage assets <strong>and</strong> views from the English<br />

Heritage Registered Historic Park <strong>and</strong> Garden at Kensal Green Cemetery will not be<br />

harmed.<br />

4.38 Samples of materials of the proposed facades can be secured by way of a<br />

planning condition. Therefore, in summary the proposed extension to the Westfield<br />

Shopping Centre is considered to be of the required quality to ensure compliance with<br />

policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 7.8 <strong>and</strong> 7.21 of the London Plan <strong>and</strong> policies DM<br />

G1, DM G3 <strong>and</strong> DM G7 of the Development Management Local Plan <strong>and</strong> policies BE1,<br />

WCOA <strong>and</strong> WCOA1 of the Core Strategy.<br />

Amenity<br />

4.39 At a national <strong>and</strong> regional level there is a requirement to prevent unacceptable<br />

harm to amenity arising from new development. Paragraph 109 of the NPPF seeks to<br />

prevent new <strong>and</strong> existing development from contributing to or being put at unacceptable<br />

risk from, or being adversely affected by, unacceptable levels of soil, air, water or noise<br />

pollution.<br />

4.40 London Plan Policy 7.6 (Architecture) states that buildings <strong>and</strong> structures should<br />

not 'cause unacceptable harm to the amenity of surrounding l<strong>and</strong> <strong>and</strong> buildings,<br />

particularly residential buildings, in relation to privacy, overshadowing, wind <strong>and</strong><br />

microclimate'.<br />

Daylight/Sunlight <strong>and</strong> Privacy<br />

4.41 The Design <strong>and</strong> Access Statement addendum submitted in support of the<br />

Application includes a daylight analysis comprising a section illustrating a 25 degree line<br />

from the closest residential habitable room window to the proposed development. This<br />

analysis illustrates that there would be no significant harm in terms of daylight/sunlight<br />

on nearby residential properties <strong>and</strong> adjacent local amenity space as a result of the<br />

proposed development.<br />

4.42 The distance between the application site <strong>and</strong> the nearest residential building at<br />

Hunt Close to the east is approximately 105m with the West Cross Route <strong>and</strong> West<br />

London Line which combine to form a significant physical barrier. The garden spaces to<br />

the Hunt Close properties to the east of the shopping centre are located below the<br />

southbound ramped part of the H-junction. A high boundary wall is located at the rear of<br />

the gardens which blocks views of the road <strong>and</strong> would also ensure there are limited<br />

views of the proposed rooftop extension, including the retail <strong>and</strong> leisure extension.<br />

Notwithst<strong>and</strong>ing the limited views of the proposed extension on its own <strong>and</strong> when


combined with the retail <strong>and</strong> leisure extension, it is considered that there is sufficient<br />

distance to maintain privacy. It is therefore considered that there would be no<br />

significant in terms of impact on the adjoining properties in this respect.<br />

4.43 The overshadowing effects of the recently approved leisure <strong>and</strong> retail extension<br />

was considered by way of a sun-path analysis which revealed minor impacts to the<br />

proposed dwellings that could be built within the phase 2 development. The analysis<br />

demonstrated that there would be no over-shadowing of properties to the east of the<br />

West Cross Route. Officers note that the proposed office extension is lower in height<br />

than the retail/leisure extension <strong>and</strong> is set well back from the north eastern corner of the<br />

shopping centre. As such, the effect of the office extension would be less than that of<br />

the retail/leisure extension. In light of the position on the building <strong>and</strong> its scale <strong>and</strong><br />

height, officers conclude that there would be no additional overshadowing of the<br />

adjacent properties on Hunt Close or within the Edward Woods estate which are<br />

adjacent to the shopping centre, or of the adjacent new dwellings within the phase 2<br />

development.<br />

4.44 As such, it is considered that the office extension on its own <strong>and</strong> when combined<br />

with the retail/leisure extension would not result in a significant impact on the amenity of<br />

surrounding residential occupiers, in terms of overshadowing, privacy, daylight <strong>and</strong><br />

sunlight. The proposal would be acceptable <strong>and</strong> in accordance with policies 3.5, 3.6,<br />

3.8, 7.3, 7.6, 7.7, 7.14 <strong>and</strong> 7.15 of the London Plan (2011); policies BE1 of the London<br />

Borough of Hammersmith <strong>and</strong> Fulham Core Strategy (2011); <strong>and</strong> policies DM G1 <strong>and</strong><br />

DM G3 <strong>and</strong> SPD Design Policy 8.<br />

Noise<br />

4.45 London Plan Policy 7.15 (Reducing Noise <strong>and</strong> Enhancing Soundscapes) considers<br />

the implications of noise as part of development proposals, stating that development<br />

proposals should seek to minimise the potential adverse impacts of noise on, from,<br />

within, or in the vicinity of, development proposals.<br />

4.46 Development Management Local Plan DM H9 states that noise generating<br />

development will not be permitted, if it would be liable to materially increase the noise<br />

experienced by the occupants/users of existing or proposed noise sensitive uses in the<br />

vicinity. SPD Amenity Policies 18 <strong>and</strong> 24 are also applicable for assessing noise<br />

generating development.<br />

4.47 The proposals include the relocation of existing plant to a plant deck on the<br />

existing roof to the south of the office extension.<br />

4.48 Extensive acoustic data was collected for the original development of Westfield<br />

London <strong>and</strong> this was used to determine an acceptable acoustic specification for those<br />

works. As these circumstances have not changed, the applicant proposes to follow<br />

these guidelines for the new extension so that the internal <strong>and</strong> external noise levels<br />

remain within the same boundaries.<br />

4.49 The main sources of noise at the eastern façade are road traffic on the West Cross<br />

Route <strong>and</strong> trains on the West London line. Assuming that the noise levels measured for<br />

the original Westfield development are consistent with the noise <strong>and</strong> vibration levels,<br />

measured behind the new façade the proposals would be within appropriate st<strong>and</strong>ards.


This is based on the elevation comprising insulated steel cladding panels within the<br />

following minimum octave b<strong>and</strong> sound reduction index Rw values:<br />

Frequency 63 125 250 500 1k 2k 4k Hz<br />

Rw 16 20 24 31 35 29 36 dB<br />

4.50 Plant, louvres, inlets <strong>and</strong> outlets would be attenuated so that the ambient LA90<br />

Noise levels are not increased. This means that, in line with the original development,<br />

noise levels from services systems would not generally exceed the following LAeq<br />

levels when measured at 1m from the plant or louvre:<br />

Area Day Night<br />

General<br />

Locations<br />

65<br />

Laeq<br />

55<br />

Laeq<br />

4.51 The Council's Environmental Health officer has advised that the full details of the<br />

external noise level emitted from plant/ machinery/ equipment <strong>and</strong> mitigation measures<br />

should be submitted to the local authority for approval, prior to implementation. The<br />

measures would need to ensure that the external noise level emitted from plant,<br />

machinery/ equipment will be lower than the lowest existing background noise level by<br />

at least 10dBA, as assessed according to BS4142:1997 at the nearest <strong>and</strong>/or most<br />

affected noise sensitive premises, with all machinery operating together at maximum<br />

capacity.<br />

4.52 In terms of noise during the course of construction, a Construction Management<br />

Plan is submitted as part of this application. This document provides discussion of<br />

measures to ensure that the noise impact of construction is mitigated for neighbouring<br />

properties. A condition is recommended to ensure the noise levels during construction<br />

meet the policy requirements noted above.<br />

4.53 With the recommended conditions imposed, it is considered that the amenity of<br />

occupiers of surrounding premises would not be adversely affected by noise from<br />

plant/mechanical installations/ equipment, of from construction, in accordance with<br />

Policy DM H9 of the Development Management Local Plan <strong>and</strong> SPD Amenity policies<br />

18 <strong>and</strong> 24.<br />

Transport <strong>and</strong> Parking<br />

4.54 The transport effect of the proposed development has been assessed against the<br />

existing baseline position (existing shopping centre), which is 171,562m² GFA of retail<br />

<strong>and</strong> leisure floorspace, <strong>and</strong> the future baseline position (consented extension of<br />

shopping centre), which is 230,660m² GFA of retail <strong>and</strong> leisure floorspace. This is<br />

considered to be a robust method of assessment.<br />

4.55 The site has a PTAL score ranging from 5 to 6a using Transport for London's<br />

(TfL's) methodology.<br />

Access<br />

4.56 The proposed development does not include any amendments to the access<br />

arrangements to the Westfield London Shopping Centre.


Car Parking<br />

4.57 A total of 4,500 car parking spaces are provided at Westfield London Shopping<br />

Centre (reducing to 3,500 spaces Monday - Friday). No additional spaces are proposed<br />

as part of the development proposals, which is supported.<br />

Cycle Parking<br />

4.58 The existing cycle parking provision is 448 cycle parking spaces <strong>and</strong> 154 London<br />

Cycle Hire Scheme docking stations at Westfield London Shopping Centre <strong>and</strong><br />

adjoining transport interchanges. No additional spaces are proposed as part of the<br />

development proposals, which the applicant states is reflective of the observed take up<br />

<strong>and</strong> dem<strong>and</strong> of existing cycle parking spaces <strong>and</strong> cycle hire docking stations.<br />

4.59 This would be below Development Management Local Plan 2013 <strong>and</strong> London<br />

Plan 2011 st<strong>and</strong>ards. However, to support this provision, the applicant has provided<br />

evidence of an underutilisation of the existing cycle parking facilities. It is considered<br />

that no additional cycle storage is required at this point in time, but that provision can be<br />

increased through the Travel Plan, should dem<strong>and</strong> increase. Both TfL <strong>and</strong> the LBHF<br />

Highways Officers endorse this approach.<br />

Travel Plan<br />

4.60 Westfield London Shopping Centre's Travel Plan should be updated to reflect the<br />

development proposals. It is stated that Net-a-Porter will continue to promote <strong>and</strong><br />

support the principles <strong>and</strong> objectives of the Travel Plan <strong>and</strong> will continue to encourage<br />

sustainable travel to <strong>and</strong> from Westfield London Shopping Centre. Net-a-Porter will<br />

make all new staff aware that no dedicated staff parking is provided at Westfield London<br />

Shopping Centre.<br />

Multi Modal Trips<br />

4.61 The trip attraction of the proposed increase of Net-a-Porter's floorspace has been<br />

derived using the TRAVL database. This approach was agreed with LBHF <strong>and</strong> TfL<br />

officers to calculate the trip attraction of the consented extension to the shopping centre.<br />

4.62 The TRAVL calculated daily modal split data for B1 office l<strong>and</strong> use is summarised<br />

below.<br />

Mode<br />

Mode Split<br />

Car Driver 2.0%<br />

Car Passenger 1.1%<br />

Motorcycle 1.0%<br />

Taxi 0.5%<br />

Rail 29.1%<br />

Bus 9.0%<br />

Underground 19.0%<br />

Walk 37.6%<br />

Bicycle 0.7%<br />

TOTAL 100.0%<br />

4.63 There are no dedicated staff car parking facilities at Westfield London Shopping<br />

Centre, <strong>and</strong> the TRAVL calculated modal split reflects this, with a 2% car driver mode<br />

share.


4.64 Applying the modal split data above, results in a multi-modal trip generation<br />

summarised below.<br />

AM Peak<br />

PM Peak<br />

In Out Two-way In Out Two-way<br />

Car Driver 1 0 1 0 1 1<br />

Car<br />

Passenger<br />

0 0 0 0 0 0<br />

Motorcycle 0 0 0 0 0 0<br />

Taxi 0 0 0 0 0 0<br />

Rail 10 1 11 1 10 11<br />

Bus 3 0 3 0 3 3<br />

Underground 6 1 7 1 6 7<br />

Walk 12 2 14 2 13 15<br />

Bicycle 0 0 0 0 0 0<br />

Total 32 4 36 4 33 37<br />

4.65 The proposed increase in floorspace will result in 1 additional two-way vehicle trip<br />

in the morning peak <strong>and</strong> 1 additional two-way vehicle trip in the evening peak.<br />

4.66 It is considered that the estimated number of additional multi-modal trips that the<br />

development proposals would generate would not affect the character or operation of<br />

the local transport networks, both in the existing baseline position <strong>and</strong> the future<br />

baseline (consented Phase 2 extension) position. Further assessment of the effect of<br />

the development proposal during the morning <strong>and</strong> evening peak periods is not required<br />

against either the baseline position or the future baseline position.<br />

Construction Phase<br />

4.67 The Borough's Highways Engineer recommends that a Construction Logistics Plan<br />

will be required in accordance with TfL requirements. This should seek to minimise the<br />

impact of construction traffic on nearby roads <strong>and</strong> restrict trips to off peak hours only.<br />

Energy <strong>and</strong> Sustainability<br />

4.68 The NPPF seeks to ensure the delivery of low carbon energy development in order<br />

to address climate change <strong>and</strong> achieve environmental sustainability. This is reflected<br />

within London Plan Policies 5.1 (Climate Change Mitigation), 5.2 (Minimising Carbon<br />

Emissions) <strong>and</strong> 5.3 (Sustainable Design <strong>and</strong> Construction). Policy 5.2 sets out that new<br />

development should seek to minimise carbon dioxide emissions in accordance with the<br />

following energy hierarchy:<br />

Be lean - use less energy;<br />

Be clean - supply energy efficiently; <strong>and</strong><br />

Be green - use renewable energy.<br />

4.69 At the local level, Strategic Policy CC1 of the Core Strategy (Reduce Carbon<br />

Emissions <strong>and</strong> Resource Use <strong>and</strong> Adapt to Climate Change Impacts) requires<br />

developments to make the fullest contribution to addressing climate change <strong>and</strong><br />

reducing carbon dioxide emissions.<br />

4.70 LBHF's SPD policies on Sustainability <strong>and</strong> Energy have replaced many of the<br />

former UDP policies relating to energy <strong>and</strong> sustainability. This document recognises


that developments which are located in areas that minimise the need to travel <strong>and</strong><br />

encourage cycling, walking <strong>and</strong> public transport use can lead to significant energy<br />

savings.<br />

4.71 An Energy <strong>and</strong> Sustainability Statement (ESS) has been prepared by Cudd<br />

Bentley Consulting <strong>and</strong> has been submitted as part of this Application, in line with policy<br />

requirements. This document provides an assessment of the proposals in line with the<br />

energy hierarchy set out in the London Plan <strong>and</strong> within local policy.<br />

4.72 As the development comprises an extension to the existing centre, the applicant<br />

has noted that the options to provide a carbon saving are limited. The energy strategy<br />

for the proposed development consists of the incorporation of passive design, energy<br />

efficient measures <strong>and</strong> the incorporation of Air Source Heat Pumps to reduce carbon<br />

emissions for the development as far as possible. The details of the ASHP would be<br />

secured by way of condition. In total, energy efficiency measures are calculated to<br />

reduce the annual CO2 emissions by 8.53 tonnes from the baseline of 67.44 tonnes<br />

(equivalent to 12.64%).<br />

4.73 Overall, the energy efficiency <strong>and</strong> renewable energy measures are calculated to<br />

reduce CO2 emissions by 16.22 tonnes a year, equivalent to just over 24%. This is<br />

close to the 25% target set in the London Plan policy 5.2. The shortfall represents less<br />

than half a tonne of CO2. It is possible that this could be made up in the design stage<br />

through some further improvements in the energy efficiency performance of the building<br />

materials <strong>and</strong> installed services. As such, this level of performance is considered<br />

reasonable.<br />

4.74 In light of the constraints of the building, the reduction in carbon emissions is<br />

considered to be acceptable, <strong>and</strong> as such this proposal is considered to be compliant<br />

with the relevant adopted <strong>and</strong> emerging policies of the development plan.<br />

4.75 A BREEAM Pre-assessment for the proposed development has been carried out<br />

by Cudd Bentley Consulting, <strong>and</strong> is appended to the ESS. The design stage<br />

assessment <strong>and</strong> subsequent interim BREEAM Certification represents the performance<br />

of the building at the design stage of the assessment, typically prior to the beginning of<br />

operations on site. The predicted BREEAM rating for the proposed development is<br />

56.93% (Very Good) which will be secured by way of condition.<br />

Flood Risk <strong>and</strong> Drainage<br />

4.76 The NPPF aims to ensure that flood risk is taken into account at all stages in the<br />

planning process to avoid inappropriate development in areas at risk of flooding, whilst<br />

directing development away from areas at highest risk.<br />

4.77 The Site falls within Flood Zone 1. Footnote 20 of the NPPF confirms that site<br />

specific flood risk assessments are only required for sites within Flood Zone 1 where<br />

that site is more than 1 hectare in area. Due to its location <strong>and</strong> size of development (the<br />

site is 5,050 sqm), no Flood Risk Assessment is required. However, within the BREEAM<br />

assessment reference is made to management of surface water run-off with an<br />

indication that most of the available credits will be achieved. Parts of the Westfield site<br />

could be more susceptible to surface water flooding, so further information on surface<br />

water drainage, including measures to be implemented to attenuate flows should be<br />

provided by way of a planning condition.


4.78 It is considered that the proposed development will have a negligible impact the<br />

footprint of the existing centre as the proposals involve extending the roof, vertically.<br />

The applicant has confirmed that the existing roof drainage outfall system will be<br />

extended to pick up rainwater outlets on the new roof.<br />

4.79 The existing centre's drainage systems were designed to SUDS compliant<br />

principles <strong>and</strong> incorporate rain water harvesting systems <strong>and</strong> very large underground<br />

retention tanks to attenuate peak flows into the surrounding infrastructure. These<br />

features will be retained within the current proposals <strong>and</strong> no additional input capacity to<br />

the surrounding surface water drainage infrastructure is envisaged. However, if there<br />

are any existing outfall systems being removed, any new systems will require approval<br />

by way of planning condition.<br />

CIL/<strong>Planning</strong> Obligations<br />

4.80 In dealing with planning applications, local planning authorities consider each on its<br />

merits <strong>and</strong> reach a decision based on whether the application accords with the relevant<br />

development plan, unless material considerations indicate otherwise. Where<br />

applications do not meet these requirements, they may be refused. However, in some<br />

instances, it may be possible to make acceptable development proposals which might<br />

otherwise be unacceptable, through the use of planning conditions or, where this is not<br />

possible, through planning obligations.<br />

4.81 The Community Infrastructure Levy Regulations - CIL Regulations (2010) set out a<br />

number of tests including that: a planning obligation must be necessary to make the<br />

proposed development acceptable in planning terms, directly related to the proposed<br />

development, fairly related in scale <strong>and</strong> kind to it <strong>and</strong> reasonable in all other respects.<br />

Negotiations should seek a contribution towards the full cost of all such provision that is<br />

fairly <strong>and</strong> reasonably related in scale <strong>and</strong> in kind to the proposed development <strong>and</strong> its<br />

impact on the wider area.<br />

4.82 The National <strong>Planning</strong> Policy Framework provides guidance for local planning<br />

authorities in considering the use of planning obligations. It states that authorities should<br />

consider whether otherwise unacceptable development could be made acceptable<br />

through the use of conditions or planning obligations <strong>and</strong> that planning obligations<br />

should only be used where it is not possible to address unacceptable impacts through a<br />

planning condition. It adds that where obligations are being sought or revised, local<br />

planning authorities should take account of changes in market conditions over time <strong>and</strong>,<br />

wherever appropriate, be sufficiently flexible to prevent planned development from<br />

being stalled.<br />

4.83 Core Strategy policy CF1 requires that new development makes contributions<br />

towards or provides for the resulting increased dem<strong>and</strong> for community facilities. The<br />

proposed site is located within the White City Opportunity Area, where major<br />

developments would normally require infrastructure contributions to mitigate their<br />

impacts. Notwithst<strong>and</strong>ing this, the proposed development is for an extension to an<br />

existing office facility which is well established. Officers have considered the transport<br />

assessment <strong>and</strong> various other application documents when analysing the likely effects<br />

of the development <strong>and</strong> their dem<strong>and</strong> for additional infrastructure. It is considered that<br />

there is no requirement for additional public transport provision or car or cycle parking,<br />

as the centre is well served by both. The development would also provide mitigation<br />

measures relating to the energy consumption <strong>and</strong> employment provision which will


contribute to the wider Opportunity Area <strong>and</strong> town centre. It is considered that there are<br />

no further impacts which require mitigation or infrastructure. Therefore, in light of the<br />

non-significant impacts of the proposed development it is considered that there would<br />

be no requirement for an infrastructure contribution.<br />

Mayoral CIL<br />

4.84 The CIL regulations came into effect on 1 April 2012 <strong>and</strong> the proposed<br />

development would be liable for payment for Mayoral CIL. The current estimate for this<br />

application will be approximately £74,500.00.<br />

SUMMARY AND CONCLUSIONS<br />

4.85 The proposals would provide additional office floorspace within the town centre,<br />

which would potentially contribute to the vitality of Shepherd's Bush Town Centre <strong>and</strong><br />

the future viability of this location. The proposals would facilitate the growing operational<br />

requirements of Net-a-Porter <strong>and</strong> would contribute to the commercial offer <strong>and</strong> diversity<br />

of l<strong>and</strong> uses at Westfield London. It is considered that the generation of approximately<br />

122 new jobs (FTE), would contribute to the aims of the London Plan, LBHF Core<br />

Strategy <strong>and</strong> the WCOAPF with regards to increasing employment.<br />

4.86 This report has provided an assessment of the proposals against the Development<br />

Plan for the Borough, as required by Section 38(6) of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004.<br />

4.87 In conclusion, the proposed development is considered to be in accordance with<br />

the relevant national <strong>and</strong> regional planning policy guidance, the Council's Core Strategy<br />

<strong>and</strong> Development Management Local Plan <strong>and</strong> is hereby recommended for approval.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Wormholt And White City<br />

Site Address:<br />

Pope John School Commonwealth Avenue White City Estate<br />

London W12 7QR<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/00643/FUL<br />

Date Valid:<br />

19.02.2013<br />

Case Officer:<br />

Matthew Lawton<br />

Conservation Area:<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

The Governing Body<br />

Pope John School Commonwealth Avenue White City Estate London<br />

W12 7QR<br />

Description:<br />

Demolition of the Fatima Parish Centre <strong>and</strong> erection of a two storey detached building<br />

fronting India Way <strong>and</strong> Commonwealth Avenue, for use as additional classrooms, a<br />

nursery <strong>and</strong> associated educational facilities to facilitate the increased capacity of Pope<br />

John Catholic Primary School from a 1-form entry to a 2-form entry primary school;<br />

Demolition of part of the existing school building <strong>and</strong> associated external alterations to<br />

separate the former school hall from the retained building <strong>and</strong> to convert the former hall<br />

to a replacement Fatima Parish Centre fronting Commonwealth Avenue; Plant room<br />

single storey extension to the retained existing school building; Erection of canopies to<br />

the existing school building <strong>and</strong> connecting the existing <strong>and</strong> proposed school buildings;<br />

Demolition of the existing nursery building in the south eastern corner of the site<br />

adjacent to Canada Way; Creation of a multi use games area in the north eastern<br />

corner of the site; Relocation of vehicular accesses on Commonwealth Avenue <strong>and</strong><br />

Canada Way; L<strong>and</strong>scaping <strong>and</strong> boundary treatments including walls, railing <strong>and</strong> gates.<br />

Drg Nos: 4838-P01A, P10, P11A Rev.A, P12 Rev.B, P13A, P14 Rev.D, P15 Rev.C, 16<br />

Rev.A, P17, P22, P40, P50 Rev.A, P60, P70 Rev.A, P80, P90, P100, P110, P120,<br />

P130, P140 & P150; 0009.<br />

Application Type:<br />

Full Detailed <strong>Planning</strong> Application<br />

Officer Recommendation:<br />

That the application be approved subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) The development shall be carried out <strong>and</strong> completed in accordance with the<br />

following approved drawings:<br />

4838-P01A, P10, P11A Rev.A, P12 Rev.B, P13A, P14 Rev.D, P15 Rev.c, 16<br />

Rev.A, P17, P22, P40, P50 Rev.A, P60, P70 Rev.A, P80, P90, P100, P110, P120,<br />

P130, P140 & P150; 0009<br />

In order to ensure full compliance with the planning application hereby approved<br />

<strong>and</strong> to prevent harm arising through deviations from the approved plans, in<br />

accordance with policy DM G1 of the Development Management Local Plan<br />

(2013) <strong>and</strong> policy BE1 of the Core Strategy (2011).


3) The number of children enrolled <strong>and</strong> accommodated at the school (including the<br />

nursery) shall not exceed 450 (full time equivalent) at any one time.<br />

In order to safeguard the amenities of neighbouring occupiers <strong>and</strong> the area<br />

generally, in accordance with policy DM H11 of the Development Management<br />

Local Plan (2013).<br />

4) The premises shall be used only as a primary school <strong>and</strong> nursery, <strong>and</strong> for no other<br />

purpose (including any other purpose in Class D1 of the Schedule to the Town <strong>and</strong><br />

Country <strong>Planning</strong> (Use Classes) Order 1987, (or in any provision equivalent to that<br />

Class in any statutory instrument revoking <strong>and</strong> re-enacting that Order with or<br />

without modification).<br />

In granting this permission, the Council has had regard to the special<br />

circumstances of the case. Certain other uses within the same use class may be<br />

unacceptable due to effect on residential amenity or traffic generation, in<br />

accordance with policies DM H11 <strong>and</strong> DM J2 of the Development Management<br />

Local Plan (2013).<br />

5) Pursuant to Article 3(1) <strong>and</strong> the provision of Article 3(2) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> (General Permitted Development) Order 1995, Part 32 of Schedule 2 of<br />

the said Order (being development within the curtilage of Schools, Colleges,<br />

Universities <strong>and</strong> Hospitals) (or any Order revoking or re-enacting that Order with or<br />

without modification) shall not apply to the school site to which this planning<br />

permission relates, <strong>and</strong> no such development within the curtilage of the school<br />

shall take place without planning permission first being obtained.<br />

To enable the Council to retain control over any future development in view of the<br />

overall design <strong>and</strong> integrated appearance of the scheme <strong>and</strong> the effect of any<br />

such development on the external recreational areas of the school <strong>and</strong> the<br />

amenities of the surrounding properties, in accordance with policy DM G1 of the<br />

Development Management Local Plan (2013).<br />

6) The building development hereby permitted shall not be used or occupied until full<br />

details of the proposed management of the school's facilities available for<br />

community use have been submitted to <strong>and</strong> approved in writing by the Council.<br />

Such details shall include any proposed charging mechanism for the facilities as<br />

well as details of times for when the facilities would be available for use by the<br />

community. The management of the community facilities shall be carried out in<br />

accordance with the details as approved unless otherwise agreed in writing by the<br />

Council.<br />

To ensure the appropriate management <strong>and</strong> availability of the community facilities<br />

in accordance with policies DM H9 <strong>and</strong> DM H11 of the Development Management<br />

Local Plan (2013) <strong>and</strong> Core Strategy (2011) policy CF1.<br />

7) No development shall take place until details of all materials including colours of<br />

ceramic tiles <strong>and</strong> details of colour pattern of ceramic tiles (including samples<br />

where appropriate) to be used in the construction of the external surfaces of the<br />

development, have been submitted to <strong>and</strong> approved in writing by the Council. The<br />

development shall be carried out in accordance with the approved details <strong>and</strong><br />

thereafter retained as such.


In order that the Council may be satisfied as to the details of the development in<br />

the interests of visual amenity of the area in accordance with policy DM G1 of the<br />

Development Management Local Plan (2013) <strong>and</strong> policy BE1 of the Core Strategy<br />

(2011).<br />

8) The development hereby permitted shall not commence until detailed drawings of<br />

a typical bay for each elevation of the new building at a scale of no less than 1:20<br />

are submitted to <strong>and</strong> approved in writing by the council. The development shall be<br />

carried out in accordance with such details as have been approved <strong>and</strong> thereafter<br />

permanently retained in this form.<br />

To ensure a satisfactory external appearance, in accordance with policy DM G1 of<br />

the Development Management Local Plan (2013) <strong>and</strong> policy BE1 of the Core<br />

Strategy 2011.<br />

9) The development hereby permitted shall not commence until details of the hard<br />

<strong>and</strong> soft l<strong>and</strong>scaping of all areas external to the building, including planting <strong>and</strong><br />

paving, detailed drawings at a scale of not less than 1:20 of fences, gates <strong>and</strong><br />

other means of enclosure have been submitted to <strong>and</strong> approved in writing by the<br />

Council, <strong>and</strong> the development shall not be occupied or used until such<br />

l<strong>and</strong>scaping as is approved has been carried out. Any l<strong>and</strong>scaping removed or<br />

severely damaged, dying or becoming seriously diseased within 5 years of<br />

planting shall be replaced with a tree or shrub of similar size <strong>and</strong> species to that<br />

originally required to be planted.<br />

To ensure a satisfactory external appearance <strong>and</strong> satisfactory provision for<br />

permeable surfaces in accordance with policy DM G1 of the Development<br />

Management Local Plan (2013) <strong>and</strong> policy BE1 of the Core Strategy 2011.<br />

10) The development shall not commence before details of the phasing programme for<br />

the construction <strong>and</strong> completion of each phase <strong>and</strong> their related l<strong>and</strong>, eg. parking<br />

<strong>and</strong> amenity spaces, have been submitted to <strong>and</strong> approved in writing by the<br />

Council The phasing of the development shall thereafter be carried out in<br />

accordance with the details thereby approved before occupation or use of any<br />

building or l<strong>and</strong> within each phase, unless a revised phasing programme is<br />

otherwise agreed.<br />

To ensure that the development is carried out in a satisfactory manner in<br />

accordance with policy DM G1 of the Development Management Local Plan<br />

(2013) <strong>and</strong> policy BE1 of the Core Strategy (2011).<br />

11) All trees to be retained on site in proximity of the development shall be protected<br />

from damage in accordance with BS5837:2012. No construction shall take place<br />

until any such trees are adequately protected as per BS5837:2012.<br />

To ensure that trees on site are retained <strong>and</strong> to prevent harm during the course of<br />

construction, in accordance with policy DM E4 of the Development Management<br />

Local Plan (2013) <strong>and</strong> policy BE1 of the Core Strategy (2011).<br />

12) Any material changes to the external appearance of the building hereby permitted,<br />

including the installation of air-h<strong>and</strong>ling units, ventilation fans or extraction<br />

equipment, must first be submitted <strong>and</strong> approved in writing by the Council prior to


their installation. Any alterations shall be implemented in accordance with the<br />

details that are approved.<br />

To ensure a satisfactory external appearance <strong>and</strong> prevent harm to the street<br />

scene, <strong>and</strong> to safeguard the amenities of neighbouring residential occupiers, in<br />

accordance with policies DM G1, DM H9 <strong>and</strong> DM H11 of the Development<br />

Management Local Plan (2013).<br />

13) The development hereby permitted shall not commence until a surface water<br />

drainage scheme, based on sustainable drainage principles, has been submitted<br />

to <strong>and</strong> approved in writing by the Council. The scheme shall be implemented in<br />

accordance with the approved details prior to first occupation of the development<br />

hereby permitted, <strong>and</strong> thereafter permanently retained <strong>and</strong> maintained in working<br />

order.<br />

To prevent any increased risk of flooding <strong>and</strong> to ensure the satisfactory storage<br />

of/disposal of surface water from the site in accordance with policy CC2 of the<br />

Core Strategy (2011), policy DM H3 of the Development Management Local Plan<br />

(2013) <strong>and</strong> policy 5.13 of The London Plan (2011).<br />

14) The development shall not commence until a statement of how 'Secured by<br />

Design' requirements are to be adequately achieved has been submitted to <strong>and</strong><br />

approved in writing by the Council. The approved details shall be carried out prior<br />

to occupation or use of the development hereby approved <strong>and</strong> permanently<br />

maintained thereafter unless otherwise agreed in writing by the Council.<br />

To ensure a safe <strong>and</strong> secure environment for users of the development, in<br />

accordance with policy DM G1 of the Development Management Local Plan<br />

(2013).<br />

15) The use of the building hereby permitted shall not commence until full details of an<br />

updated School Travel Plan (in line with TfL's STAR framework Bronze st<strong>and</strong>ard)<br />

for the extended school has been submitted to, <strong>and</strong> approved in writing by, the<br />

Council. Upon the commencement of the use the School Travel Plan shall be<br />

implemented in full compliance with the approved details, <strong>and</strong> shall thereafter<br />

continue to be fully implemented whilst the use remains in operation. Such details<br />

must include information on how alternative methods of transport to <strong>and</strong> from the<br />

school, other than by car, will be encouraged. The School Travel Plan shall be<br />

reviewed on the first anniversary of the extended school's opening, <strong>and</strong> thereafter<br />

regularly reviewed, at intervals to be agreed with the Council.<br />

To ensure that the use does not generate an excessive number of car trips which<br />

would be contrary to the Council's policies of car restraint set down in policy DM J2<br />

of the Development Management Local Plan (2013) <strong>and</strong> policy T1 of the Core<br />

Strategy (2011).<br />

16) The use of the building hereby permitted shall not commence until full details of a<br />

School Management Plan for the extended school have been submitted to, <strong>and</strong><br />

approved in writing by, the Council. Upon the commencement of the use, the<br />

School Management Plan shall be implemented in full compliance with the<br />

approved details, <strong>and</strong> shall thereafter continue to be fully implemented whilst the<br />

use remains in operation. Such details shall include information on the school


hours of use; the number <strong>and</strong> times of recreation breaks; <strong>and</strong> a plan for staff<br />

supervision at arrival <strong>and</strong> leaving times <strong>and</strong> recreation times.<br />

To ensure that the use does not result in loss of amenity to neighbouring residents<br />

in terms of noise <strong>and</strong> disturbance, in accordance with policy T1 of the Core<br />

Strategy (2011) <strong>and</strong> policies DM H10, DM H11 <strong>and</strong> DM J2 of the Development<br />

Management Local Plan (2013).<br />

17) The development hereby permitted shall not commence until full details of how the<br />

development proposal provides an inclusive <strong>and</strong> accessible environment been<br />

submitted to, <strong>and</strong> approved in writing by, the Council. The approved details should<br />

then be implemented <strong>and</strong> retained thereafter in this form.<br />

To ensure that the proposal provides an inclusive <strong>and</strong> accessible environment in<br />

accordance with policy DM G1 of the Development Management Local Plan<br />

(2013) <strong>and</strong> The London Plan (2011) policy 7.2.<br />

18) Prior to commencement of the development hereby approved, a Refuse <strong>and</strong><br />

Servicing Management Plan shall be submitted to <strong>and</strong> approved in writing by the<br />

Council. Details shall include the weekly numbers <strong>and</strong> times of deliveries <strong>and</strong><br />

collections, the size of vehicles to be used <strong>and</strong> details of off-loading locations <strong>and</strong><br />

vehicle movements. The use shall thereafter be carried out in accordance with the<br />

agreed details.<br />

To ensure that the refuse collection <strong>and</strong> servicing requirements of the school will<br />

not adversely impact on the operation of the public highway <strong>and</strong> to ensure that the<br />

amenity of occupiers of the surrounding premises are not adversely affected by<br />

noise, in accordance with policies DM J2, DM J6, DM H9 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

19) The building development hereby permitted shall not be occupied or used until full<br />

details (including elevational drawings) of proposed covered cycle racks for 66<br />

bicycles <strong>and</strong> parking for 40 children's scooters have been fully submitted to <strong>and</strong><br />

approved in writing by the Council. The cycle <strong>and</strong> scooter parking shall be<br />

provided on the site prior to the first occupation or use of the building <strong>and</strong> shall<br />

thereafter be permanently retained.<br />

To ensure the provision <strong>and</strong> permanent retention of the cycle <strong>and</strong> scooter parking<br />

spaces for parking purposes, in accordance with policy DM J5 of the Development<br />

Management Local Plan (2013).<br />

20) Prior to commencement of the development hereby approved, a Demolition<br />

Management Plan, a Construction Logistics Plan <strong>and</strong> a Construction Management<br />

Plan shall be submitted to <strong>and</strong> approved in writing by the Council. Details shall<br />

include control measures for dust, noise, vibration, lighting, delivery locations,<br />

restriction of hours of work <strong>and</strong> all associated activities audible beyond the site<br />

boundary to 0800-1800hrs Mondays to Fridays <strong>and</strong> 0800-1300hrs on Saturdays,<br />

advance notification to neighbours <strong>and</strong> other interested parties of proposed works<br />

<strong>and</strong> public display of contact details including accessible phone contact to persons<br />

responsible for the site works for the duration of the works. The details shall also<br />

include the numbers, size <strong>and</strong> routes of demolition <strong>and</strong> construction vehicles,<br />

provisions within the site to ensure that all vehicles associated with the


construction works are properly washed <strong>and</strong> cleaned to prevent the passage of<br />

mud <strong>and</strong> dirt onto the highway, <strong>and</strong> other matters relating to traffic management to<br />

be agreed. Approved details shall be implemented throughout the project period.<br />

To ensure that construction works do not adversely impact on the operation of the<br />

public highway, <strong>and</strong> that the amenity of occupiers of surrounding premises is not<br />

adversely affected by noise, vibration, dust, lighting or other emissions from the<br />

building site, in accordance with Policies DM J1, DM J6, DM H9, DM H11 of the<br />

Development Management Local Plan 2013.<br />

21) Neither music nor amplified voices emitted from the building development hereby<br />

permitted shall be audible at any residential / noise sensitive premises.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise, in accordance with policies DM H9 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

22) Prior to use of the building development hereby approved, details shall be<br />

submitted to <strong>and</strong> approved in writing by the Council, of the external noise level<br />

emitted from any plant / machinery / equipment <strong>and</strong> / or any extract / ventilation<br />

system <strong>and</strong> ducting <strong>and</strong> mitigation measures as appropriate. The measures shall<br />

ensure that the external noise level emitted from any such noise sources will be<br />

lower than the lowest existing background noise level by at least 10dBA, as<br />

assessed according to BS4142:1997 at the nearest <strong>and</strong> / or most affected noise<br />

sensitive premises, with all noise sources operating together at maximum<br />

capacity. Approved details shall be implemented prior to occupation of the<br />

development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise from plant / mechanical installations / equipment, in accordance<br />

with policies DM H9 <strong>and</strong> DM H11 of the Development Management Local Plan<br />

(2013).<br />

23) Prior to commencement of the development, details of any proposed external<br />

artificial lighting shall be submitted to <strong>and</strong> approved in writing by the Council.<br />

Lighting contours shall be submitted to demonstrate that vertical illumination of<br />

neighbouring premises is in accordance with the recommendations of the<br />

Institution of Lighting Professionals in the `Guidance Notes For The Reduction Of<br />

Light Pollution 2011'. Details should also be submitted for approval of measures<br />

to minimise use of lighting <strong>and</strong> prevent glare <strong>and</strong> sky glow by correctly using,<br />

locating, aiming <strong>and</strong> shielding luminaries. Approved details shall be implemented<br />

prior to occupation of the development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by lighting, in accordance with policies DM H10 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

24) No tannoys or public address systems shall be used in relation to the development<br />

hereby permitted unless details have been submitted to <strong>and</strong> approved in writing by<br />

the Council. Approved details shall be implemented prior to use <strong>and</strong> thereafter be<br />

permanently retained.


To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise, in accordance with policies policy DM H9 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

25) Prior to the use of the building development hereby permitted, details shall be<br />

submitted to <strong>and</strong> approved in writing by the Council, of the installation, operation,<br />

<strong>and</strong> maintenance of odour abatement equipment <strong>and</strong> extract system, including the<br />

height of the extract duct <strong>and</strong> vertical discharge outlet, in accordance with the<br />

'Guidance on the Control of Odour <strong>and</strong> Noise from Commercial Kitchen Exhaust<br />

Systems' January 2005 by DEFRA. Approved details shall be implemented prior to<br />

the commencement of the use <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by cooking odour, in accordance with policy DM H11 of the Development<br />

Management Local Plan (2013).<br />

26) The development shall not be occupied until full details of refuse storage, including<br />

provision for the storage of recyclable materials, have been submitted to <strong>and</strong><br />

approved in writing by the Council. The details shall include elevational details of<br />

any proposed storage enclosure. Such details as approved shall thereafter be<br />

permanently retained/carried out.<br />

In order to ensure the development provides adequate waste storage, in<br />

accordance with policy DM H5 of the Development Management Local Plan<br />

(2013) <strong>and</strong> the <strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document (2013).<br />

27) No alterations shall be carried out to the flat roofs of the development hereby<br />

permitted to create a terrace or other amenity space. No railings or other means of<br />

enclosure shall be erected around the roofs <strong>and</strong> no alterations shall be made to<br />

form access onto the roofs.<br />

The formation/use of a terrace would be harmful to the existing amenities of the<br />

occupiers of neighbouring residential properties as a result of overlooking <strong>and</strong> loss<br />

of privacy <strong>and</strong> the generation of noise <strong>and</strong> disturbance, contrary to policy DM H11<br />

of the Development Management Local Plan (2013) <strong>and</strong> SPD Housing Policy 8 of<br />

the <strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document (2013).<br />

28) Access to the site from Canada Way shall be used by vehicles in emergencies<br />

only.<br />

To ensure that the use of the site does not conflict with the use of the adjacent<br />

highway contrary to the Council's policies set down in policy DM J2 of the<br />

Development Management Local Plan (2013) <strong>and</strong> policy T1 of the Core Strategy<br />

(2011).<br />

29) The building development hereby permitted shall be implemented in accordance<br />

with the measures outlined in the revised Energy Statement (received 14/6/13),<br />

<strong>and</strong> shall not be occupied or used until the energy measures have been<br />

implemented <strong>and</strong> shall be retained thereafter in this form.<br />

To ensure an energy efficient development that integrates on-site renewable<br />

energy generation to help reduce its carbon dioxide emissions, in accordance with


policies 5.2 <strong>and</strong> 5.7 of the London Plan (2011), policy CC1 of the Core Strategy<br />

(2011) <strong>and</strong> policies DM H1 <strong>and</strong> DM H2 of the Development Management Local<br />

Plan (2013).<br />

30) The building development hereby permitted shall not be occupied until the<br />

proposed works to the public highway on Canada Way <strong>and</strong> Commonwealth<br />

Avenue to relocate the two existing vehicular accesses are fully completed to the<br />

Council's Streetsmart st<strong>and</strong>ards.<br />

To ensure a satisfactory st<strong>and</strong>ard of appearance <strong>and</strong> to maintain pedestrian <strong>and</strong><br />

highway safety, in accordance with policies DM G1, DM J4 <strong>and</strong> DM J6 of the<br />

Development Management Local Plan (2013).<br />

31) No development shall commence until details are submitted to, <strong>and</strong> approved in<br />

writing by, the Council of the position, number <strong>and</strong> noise output of the proposed air<br />

source heat pumps, the position <strong>and</strong> number of solar collectors <strong>and</strong> natural<br />

ventilation stacks, <strong>and</strong> the final position, number <strong>and</strong> angle relative to the surface<br />

of the roof of the proposed PV panels, to be provided as part of the approved<br />

development. The development shall be carried out in accordance with the details<br />

as approved <strong>and</strong> permanently retained in this form.<br />

To ensure a satisfactory st<strong>and</strong>ard of external appearance <strong>and</strong> to prevent noise<br />

<strong>and</strong> disturbance to neighbouring residents, in accordance with policies DM H1, DM<br />

H2 <strong>and</strong> DM H11 of the Development Management Local Plan (2013).<br />

32) No development shall commence until a preliminary risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall comprise: a<br />

desktop study which identifies all current <strong>and</strong> previous uses at the site <strong>and</strong><br />

surrounding area as well as the potential contaminants associated with those<br />

uses; a site reconnaissance; <strong>and</strong> a conceptual model indicating potential pollutant<br />

linkages between sources, pathways <strong>and</strong> receptors, including those in the<br />

surrounding area <strong>and</strong> those planned at the site; <strong>and</strong> a qualitative risk assessment<br />

of any potentially unacceptable risks arising from the identified pollutant linkages<br />

to human health, controlled waters <strong>and</strong> the wider environment including ecological<br />

receptors <strong>and</strong> building materials. All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

33) No development shall commence until a site investigation scheme is submitted to<br />

<strong>and</strong> approved in writing by the Council. This scheme shall be based upon <strong>and</strong><br />

target the risks identified in the approved preliminary risk assessment <strong>and</strong> shall<br />

provide provisions for, where relevant, the sampling of soil, soil vapour, ground<br />

gas, surface <strong>and</strong> groundwater . All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the


Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

34) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, following a site investigation undertaken in compliance with the<br />

approved site investigation scheme, a quantitative risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall: assess the<br />

degree <strong>and</strong> nature of any contamination identified on the site through the site<br />

investigation; include a revised conceptual site model from the preliminary risk<br />

assessment based on the information gathered through the site investigation to<br />

confirm the existence of any remaining pollutant linkages <strong>and</strong> determine the risks<br />

posed by any contamination to human health, controlled waters <strong>and</strong> the wider<br />

environment. All works must be carried out in compliance with <strong>and</strong> by a competent<br />

person who conforms to CLR 11: Model Procedures for the Management of L<strong>and</strong><br />

Contamination (Defra 2004) or the current UK requirements for sampling <strong>and</strong><br />

testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

35) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, a remediation method statement is submitted to <strong>and</strong> approved in<br />

writing by the Council. This statement shall detail any required remediation works<br />

<strong>and</strong> shall be designed to mitigate any remaining risks identified in the approved<br />

quantitative risk assessment. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

36) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until the approved remediation method statement has been carried out


in full <strong>and</strong> a verification report confirming these works has been submitted to, <strong>and</strong><br />

approved in writing, by the Council. This report shall include: details of the<br />

remediation works carried out; results of any verification sampling, testing or<br />

monitoring including the analysis of any imported soil; all waste management<br />

documentation showing the classification of waste, its treatment, movement <strong>and</strong><br />

disposal; <strong>and</strong> the validation of gas membrane placement. If, during development,<br />

contamination not previously identified is found to be present at the site, the<br />

Council is to be informed immediately <strong>and</strong> no further development (unless<br />

otherwise agreed in writing by the Council) shall be carried out until a report<br />

indicating the nature of the contamination <strong>and</strong> how it is to be dealt with is<br />

submitted to, <strong>and</strong> agreed in writing by, the Council. Any required remediation shall<br />

be detailed in an amendment to the remediation statement <strong>and</strong> verification of<br />

these works included in the verification report. All works must be carried out in<br />

compliance with <strong>and</strong> by a competent person who conforms to CLR 11: Model<br />

Procedures for the Management of L<strong>and</strong> Contamination (Defra 2004) or the<br />

current UK requirements for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

37) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until an onward long-term monitoring methodology report is submitted<br />

to <strong>and</strong> approved in writing by the Council where further monitoring is required past<br />

the completion of development works to verify the success of the remediation<br />

undertaken. A verification report of these monitoring works shall then be submitted<br />

to <strong>and</strong> approved in writing by the Council when it may be demonstrated that no<br />

residual adverse risks exist. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

38) The whole of the parking accommodation shown on the approved plan Ref.0009<br />

shall be provided prior to occupation of the building development hereby permitted<br />

<strong>and</strong> shall be retained thereafter for the accommodation of motor vehicles of users<br />

of the buildings on the application site <strong>and</strong> shall not be used for any other purpose.<br />

To ensure the provision <strong>and</strong> permanent retention of the parking spaces so as to<br />

ensure the development does not result in additional on street parking stress<br />

detrimental to the amenity of surrounding residents, in accordance with policy DM<br />

J1 of the Development Management Local Plan (2013).


39) The use of the replacement Fatima Parish Centre hereby permitted shall not<br />

commence until a Community Travel Plan (in line with TfL's framework) has been<br />

submitted to, <strong>and</strong> approved in writing by, the Council. Upon the commencement of<br />

the use the Community Travel Plan shall be implemented in full compliance with<br />

the approved details, <strong>and</strong> shall thereafter continue to be fully implemented whilst<br />

the use remains in operation. Such details must include information on how<br />

alternative methods of transport to <strong>and</strong> from the Centre, other than by car, will be<br />

encouraged. The Community Travel Plan shall be reviewed on the first<br />

anniversary of the replacement Fatima Parish Centre's opening, <strong>and</strong> thereafter<br />

regularly reviewed, at intervals to be agreed with the Council.<br />

To ensure that the use does not generate an excessive number of car trips which<br />

would be contrary to the Council's policies of car restraint set down in policy DM J2<br />

of the Development Management Local Plan (2013) <strong>and</strong> policy T1 of the Core<br />

Strategy (2011).<br />

40) The demolition hereby permitted shall be undertaken before a scheme for<br />

temporary fencing <strong>and</strong>/or enclosure of the site has been submitted to <strong>and</strong><br />

approved in writing by the Council, <strong>and</strong> such enclosure has been erected in<br />

accordance with the approved details <strong>and</strong> retained for the duration of the building<br />

works.<br />

To ensure that the site remains in a tidy condition <strong>and</strong> to prevent harm to the street<br />

scene, in accordance with policy DM G1 of the Development Management Local<br />

Plan (2013).<br />

41) The development hereby permitted shall not commence until detailed drawings of<br />

fenestration to the development at a scale of no less than 1:20 are submitted to<br />

<strong>and</strong> approved in writing by the council. The development shall be carried out in<br />

accordance with such details as have been approved <strong>and</strong> thereafter permanently<br />

retained in this form.<br />

To ensure a satisfactory external appearance, in accordance with policy DM G1 of<br />

the Development Management Local Plan (2013) <strong>and</strong> policy BE1 of the Core<br />

Strategy 2011.<br />

42) The development hereby permitted shall not commence until full details of an<br />

access management strategy for the school, nursery <strong>and</strong> Fatima Parish Centre<br />

have been submitted to, <strong>and</strong> approved in writing by, the Council. Upon the<br />

commencement of the use, the access management strategy shall be<br />

implemented in full compliance with the approved details, <strong>and</strong> shall thereafter<br />

continue to be fully implemented whilst the use remains in operation. Such details<br />

shall include information on pedestrian <strong>and</strong> vehicular accesses, use of any mini<br />

buses <strong>and</strong>/or coaches <strong>and</strong> car park management. The access management<br />

strategy shall be reviewed on the first anniversary of the extended school's<br />

opening, <strong>and</strong> thereafter regularly reviewed, at intervals to be agreed with the<br />

Council.<br />

To ensure no detrimental impact of the development upon the surrounding<br />

highways, in accordance with policy DM J6 of the Development Management<br />

Local Plan (2013).


Justification for Approving the Application:<br />

1) 1. L<strong>and</strong> Use: The proposed development would involve the redevelopment of an<br />

existing site in Class D1 use for use as a Class D1 school <strong>and</strong> Parish Centre. It is<br />

considered that the site is an appropriate location for such use. The increase in<br />

the capacity of the existing Pope John School would enhance the provision of<br />

primary school places within the borough. The proposed development at the<br />

school would also provide facilities for dual use by the community. It is thus<br />

considered that the proposal complies with policy DM D1 of the Development<br />

Management Local Plan (2013), policy CF1 of the Core Strategy (2011), <strong>and</strong><br />

policy 3.18 of the London Plan (2011).<br />

2. Design <strong>and</strong> Conservation: It is considered that the proposed replacement<br />

building would be appropriate in scale, height, mass, proposed materials <strong>and</strong><br />

design. The building would be designed to meet educational needs, whilst also<br />

presenting a suitable response to the context of the surrounding street scenes.<br />

Policy DM G1 of the Development Management Local Plan (2013), policy BE1 of<br />

the Core Strategy (2011) <strong>and</strong> policies 7.4, 7.6 <strong>and</strong> 7.8 of The London Plan (2011)<br />

would therefore be satisfied.<br />

3. Highways matters: There would be no adverse impact on traffic generation <strong>and</strong><br />

the scheme would not result in congestion of the primary road network; subject to<br />

measures to limit car trips to school being secured <strong>and</strong> implemented within a<br />

School Travel Plan. Satisfactory provision would be made for cycle parking.<br />

Adequate provision for servicing <strong>and</strong> the storage <strong>and</strong> collection of refuse <strong>and</strong><br />

recyclables would be provided. The proposal is thereby in accordance with policy<br />

T1 of the Core Strategy 2011, policies DM H5, DM J1, DM J2, DM J4, DM J5 <strong>and</strong><br />

DM J6 of the of the Development Management Local Plan (2013) <strong>and</strong> SPD<br />

Transport Policy 34 of the <strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document<br />

(2013).<br />

4. Residential Amenity: The impact of the proposed development upon<br />

neighbouring occupiers is considered acceptable. Due to the relationship of the<br />

proposed building to residential neighbours <strong>and</strong> its position, height <strong>and</strong> bulk, it is<br />

considered that the proposal would not materially affect the outlook from, <strong>and</strong> light<br />

to, neighbouring properties. Residents' privacy would not be affected to an<br />

unacceptable degree. Measures would also be secured by condition to minimise<br />

noise <strong>and</strong> disturbance to nearby occupiers from the operation of the proposed<br />

school. In this regard, the development would respect the principles of good<br />

neighbourliness, <strong>and</strong> thereby satisfy policies DM A9, DM G1 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013).<br />

5. Sustainability: The proposal would seek to minimise its environmental impact,<br />

including measures that would conserve energy, materials <strong>and</strong> water, reduce air,<br />

noise <strong>and</strong> water pollution, <strong>and</strong> promote sustainable waste behaviour. It is<br />

considered that the development would not have an adverse impact on a<br />

watercourse, flood plain or flood defences, <strong>and</strong> the implementation of a<br />

sustainable urban drainage strategy would be required by condition to ensure<br />

there is no adverse impact on localised flooding. Policies DM H1, DM H2 <strong>and</strong> DM<br />

H3 of the Development Management Local Plan (2013), policies CC1, CC2, CC3,<br />

<strong>and</strong> CC4 of the Core Strategy (2011) <strong>and</strong> policies 5.2, 5.7 <strong>and</strong> 5.13 of the London<br />

Plan (2011) are thereby satisfied.


6. Access <strong>and</strong> Crime Prevention: Subject to conditions the development would<br />

provide a safe <strong>and</strong> secure environment, <strong>and</strong> would be accessible to all users in<br />

accordance with policy DM G1 of the Development Management Local Plan<br />

(2013), policy TN1 of the Core Strategy (2011) <strong>and</strong> policies 7.2 <strong>and</strong> 7.3 of The<br />

London Plan (2011).<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 18th February 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

Thames Water - Development Control<br />

Transport For London - L<strong>and</strong> Use <strong>Planning</strong> Team<br />

Environment Agency - <strong>Planning</strong> Liaison<br />

Transport For London - L<strong>and</strong> Use <strong>Planning</strong> Team<br />

Dated:<br />

18.03.13<br />

20.03.13<br />

18.03.13<br />

08.04.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

Church Of Grace Ministries (White City) C/O Islington Methodist Church Palmer Place<br />

N7 8DH 12.04.13<br />

NAG 12.04.13<br />

NAG 12.04.13<br />

Nag 16.04.13<br />

1.0 BACKGROUND<br />

1.1 The site is comprised of a collection of single <strong>and</strong> two storey buildings to the west<br />

of Our Lady of Fatima Church, sitting to the south of Commonwealth Avenue between<br />

India Way to the west <strong>and</strong> Canada Way to the east, forming Pope John Catholic<br />

Primary School. Residential properties are located opposite the site on Commonwealth<br />

Avenue, India Way <strong>and</strong> Canada Way. Currently the main school entrance for pupils<br />

<strong>and</strong> a vehicular access to the school site (to a number of staff car parking spaces) is<br />

from Commonwealth Avenue to the north. To the south of the site, fronting India Way, is<br />

White City Community Centre. To the rear of this, fronting a pedestrian route, is White<br />

City Senior Residents Group Drop in Centre, to the east of which, towards Canada


Way, is Hammersmith North Area Housing Office. The site, which is in the White City<br />

Estate, has an area of 0.56 hectares.<br />

1.2 The application site also includes the Fatima Parish Centre situated to the<br />

northwest of the school on the junction between Commonwealth Avenue <strong>and</strong> India Way.<br />

The Fatima Parish Centre is a part single <strong>and</strong> part two storey building. The property<br />

was, until recently, in use as a single parish-run community centre. The centre closed in<br />

May, due to its poor condition.<br />

1.3 The site is not located within a conservation area; the nearest being on the<br />

western side of Bloemfontein Road at c.110 metres away; <strong>and</strong> at Hammersmith Park to<br />

the southeast (close to 200m away). To the south east of the school site, <strong>and</strong><br />

incorporating a strip of the school playground at its southernmost point, is the<br />

designated nature conservation area <strong>and</strong> open space known as `White City Community<br />

Garden'.<br />

1.4 The site is located in the Environment Agency's Flood Risk Zone 1; an area at<br />

lowest risk of flooding. The site has a public transport accessibility level (PTAL) of 4,<br />

which is good. The site is located within the White City Opportunity Area <strong>and</strong> its<br />

Housing Estate Regeneration Area (WCOA2).<br />

1.5 Various planning applications have been submitted in relation to the school, most<br />

significantly in recent times for the construction of a nursery building to the eastern side<br />

of the site, which was approved in 1994 (1994/00389/FUL) <strong>and</strong> has subsequently been<br />

implemented.<br />

1.6 Pope John School is an oversubscribed one-form entry primary school. It has<br />

become a priority for the Council to increase the number of school places available in<br />

high achieving schools, where this is feasible <strong>and</strong> there is an identified need for<br />

additional places. The school is currently accommodating a `bulge' class to cope with<br />

additional dem<strong>and</strong> (where an additional 30 children have been accommodated above<br />

the st<strong>and</strong>ard 210 intake). In addition to the seven st<strong>and</strong>ard classes <strong>and</strong> one bulge<br />

class, there is an existing 30 (full time equivalent) place nursery. It is proposed in this<br />

scheme to permanently increase the capacity of the school from 210 children to 420<br />

children plus continue to provide a 30 (full time equivalent) place nursery by extending<br />

the school <strong>and</strong> becoming a 2-form entry school. The extended school would require 17<br />

(full time equivalent) additional members of staff (there are currently 30 full time<br />

equivalent staff).<br />

1.7 Additional classrooms <strong>and</strong> ancillary space are required to achieve the increased<br />

intake of children. It is therefore proposed to demolish the Fatima Parish Centre <strong>and</strong> to<br />

construct a new two storey school building at this location, fronting on to India Way. The<br />

new building would also incorporate the school's nursery, <strong>and</strong> the existing nursery<br />

building would be demolished. The Fatima Parish Centre would be relocated to part of<br />

the existing school buildings in the central northern part of the site fronting<br />

Commonwealth Avenue, this building being separated off from the existing school to<br />

create its own curtilage.<br />

1.8 The school have been undertaking a statutory consultation in relation to the<br />

possible expansion of the school. Neighbours <strong>and</strong> parents have been made aware of<br />

the school's intentions since July 2012 <strong>and</strong> have been provided with information relating<br />

to the nature of the proposal. An open 'drop in' session was held in September 2012 as


part of an informal consultation process. Officers are advised by the applicant that<br />

approximately 40 people attended the session at which they were invited to complete a<br />

feedback questionnaire on the proposals; <strong>and</strong> that comments received were supportive<br />

of the proposal. Officers are also advised that a h<strong>and</strong>ful of respondents were<br />

concerned about the loss of the Fatima Parish Centre, but were reassured that it would<br />

be re-provided as part of the proposal.<br />

1.9 Prior to the submission of the planning application the applicants also engaged<br />

with the Council in pre-application discussions, <strong>and</strong> took part in a Design Review Panel<br />

on 11th December 2012. The Design Review Panel's conclusions were that the scale,<br />

bulk, massing, layout <strong>and</strong> proportion of the proposed building were acceptable. It was<br />

suggested that materials might be simplified, <strong>and</strong> that render should generally be<br />

replaced with brickwork. The colours used in the main elevations were supported. It<br />

was identified that there was the opportunity to create a strong focus point on the<br />

junction of Commonwealth Avenue <strong>and</strong> India Way, <strong>and</strong> that this could be achieved by<br />

continuing the brick façade on this corner, 'peeling back' the brickwork to introduce slots<br />

<strong>and</strong> create a distinctive element on the corner (for example a cross). These design<br />

suggestions have subsequently been incorporated into the scheme which forms this<br />

planning application.<br />

2.0 PUBLICITY AND CONSULTATIONS<br />

2.1 The planning application has been advertised by way of three site notices, a press<br />

advert <strong>and</strong> individual notification letters to 322 neighbouring properties.<br />

2.2 Four responses have been received, all of these being from members of the<br />

Church of Grace who utilised the Fatima Centre prior to its recent closure. The Church<br />

of Grace is currently looking to relocate to a new venue suitable for their church<br />

activities.<br />

2.3 The responses received object to the proposal, <strong>and</strong> raise the following comments<br />

in summary:<br />

Have been using the Fatima Community Centre for the last thirty years as a place for<br />

worship <strong>and</strong> outreach work to help the community; Over 120 members meet every<br />

Sunday; What provisions would be made available for relocation; Fatima Community<br />

Centre is a focal point on the estate; Staff have transformed the community <strong>and</strong> made<br />

White City Estate a place where people are now happy to live <strong>and</strong> bring up their<br />

families, the crime level is low; The centre helps the South American community <strong>and</strong> by<br />

closing the Fatima Community Centre, the loss would be felt throughout London; The<br />

centre helps the old <strong>and</strong> the young; the local community have sustained the centre; The<br />

Church was only given seven weeks notice of the closure of the centre; Church have<br />

been unfairly treated since it is difficult if not impossible to find a place of worship within<br />

this notice period; Agree a school is needed, but also need to consider the needs of the<br />

community in the wider perspective <strong>and</strong> the interest <strong>and</strong> importance of all service users<br />

<strong>and</strong> their needs.<br />

2.4 Officers' response: It is acknowledged that the Church of Grace were one of the<br />

users of the Fatima Parish Centre, prior to its recent closure on the grounds that the<br />

building was unfit to use. The proposed relocation of the Parish Centre would improve<br />

facilities in the longer term. It is not intended to close the Parish Centre permanently,<br />

<strong>and</strong> therefore this 'loss' of the facility would only be temporary. The applicants have


stated that, in the meantime, they would seek to help accommodate existing users of<br />

the Fatima Centre, but have also stated that none of the users have requested their<br />

assistance. It is noted that there are other nearby community facilities which may be<br />

available for use as alternative facilities, including the adjacent White City Community<br />

Centre. The applicants have stated that once the parish centre has relocated all the<br />

former users would be welcome to apply to use the new facilities. The Council has<br />

assessed this application in light of the Equality Act 2010 (see para 3.57 below) <strong>and</strong> it is<br />

considered that the proposed development would not affect any particular community to<br />

an unreasonable or disproportionate degree, <strong>and</strong> that in the longer term the proposal<br />

would secure improved facilities to the benefit of all communities.<br />

2.5 White City Residents' Association, Wormholt Estate Tenants' <strong>and</strong> Residents'<br />

Association, White City Neighbourhood Forum <strong>and</strong> White City Community Association<br />

were consulted on this application, but no replies have been received.<br />

2.6 Thames Water were consulted <strong>and</strong> have responded with no objection to the<br />

impact of the proposal on water infrastructure. In terms of the impact on local sewerage<br />

networks, Thames Water advises that a scheme for the suitable removal of surface<br />

water using SUDS (as per policy 5.13 of The London Plan) is required in order to avoid<br />

surcharge of existing sewers. Alternatively as a minimum the proposed combined flows<br />

/ volumes from the site should not exceed the current ones. A surface water<br />

management scheme would be required by condition (condition 13).<br />

2.7 The Environment Agency have raised no objection to the proposed development.<br />

2.8 Transport for London have requested that a Construction Logistics Plan (CLP), as<br />

referred to in the London Freight Plan, which identifies efficiency <strong>and</strong> sustainability<br />

measures to be undertaken while developments are being built, <strong>and</strong> a Delivery <strong>and</strong><br />

Servicing Plan (DSP), as referred to in the London Freight Plan, which identifies<br />

efficiency <strong>and</strong> sustainability measures to be undertaken once developments are<br />

operational, are submitted to <strong>and</strong> approved by LBHF in conjunction with TfL before<br />

construction work commences on site. 56 cycle spaces are proposed, which is in<br />

accordance with the st<strong>and</strong>ards set out in the TfL's cycle parking guidelines. Cycle<br />

parking should be located in an accessible, convenient, secure <strong>and</strong> sheltered area. In<br />

addition, CCTV coverage of the area should be provided, as well as shower <strong>and</strong><br />

changing room facilities.<br />

2.9 The Metropolitan Police's Crime Prevention Design Advisor has been consulted<br />

but to date no response has been received.<br />

2.10 The London Fire <strong>and</strong> Emergency <strong>Planning</strong> Authority have been consulted but to<br />

date no response has been received.<br />

2.11 Hammersmith & Fulham Action on Disability have been consulted but to date no<br />

response has been received.<br />

3.0 PLANNING CONSIDERATIONS<br />

3.1 The main planning issues in this case are considered to be:<br />

i) The principle of the expansion of the school <strong>and</strong> the demolition of both the existing<br />

Fatima Parish Centre <strong>and</strong> nursery <strong>and</strong> relocation of both facilities within the<br />

redevelopment;


ii) The design <strong>and</strong> impact of the proposed new school building on the streetscene<br />

<strong>and</strong> the amenities of neighbouring occupiers;<br />

iii) The impact of the proposed increase in school capacity on traffic <strong>and</strong> parking in<br />

the area <strong>and</strong> the effects on residential amenity due to noise <strong>and</strong> disturbance;<br />

iv) Energy, crime prevention, access, contaminated l<strong>and</strong> <strong>and</strong> flood risk issues.<br />

SCHOOL EXPANSION AND ASSOCIATED DEMOLITION<br />

3.2 Paragraph 72 of the National <strong>Planning</strong> Policy Framework states that `The<br />

Government attaches great importance to ensuring that a sufficient choice of school<br />

places is available to meet the needs of existing <strong>and</strong> new communities. Local planning<br />

authorities should take a proactive, positive <strong>and</strong> collaborative approach to meeting this<br />

requirement, <strong>and</strong> to development that will widen choice in education. They should 'give<br />

great weight to the need to create, exp<strong>and</strong> or alter schools' <strong>and</strong> .....'work with schools<br />

promoters to identify <strong>and</strong> resolve key planning issues before applications are<br />

submitted'. The Government's Policy Statement `<strong>Planning</strong> for Schools Development'<br />

(August 2011) also sets a presumption in favour of school development, stating that<br />

local authorities should make full use of their planning powers to support schools<br />

applications.<br />

3.3 Pope John School is located with the designated White City Opportunity Area.<br />

Core Strategy Strategic Policy WCOA states that `The existing estates community must<br />

be able to benefit from regeneration of the area through access to jobs, better local<br />

facilities, better <strong>and</strong> more suitable housing, <strong>and</strong> improved environmental conditions'.<br />

Strategic Site <strong>and</strong> Housing Regeneration Area policy WCOA2 also aims to promote<br />

development which will result in social <strong>and</strong> economic regeneration <strong>and</strong> enable the<br />

existing diverse community to thrive within a more mixed <strong>and</strong> sustainable community.<br />

The Core Strategy's Borough Wide Strategic Policy CF1 states that `The council will<br />

work with its strategic partners to provide borough wide high quality accessible <strong>and</strong><br />

inclusive facilities <strong>and</strong> services for the community by - encouraging the co-location of<br />

community facilities <strong>and</strong> services where opportunities arise -seeking the improvement of<br />

school provision, including improvement <strong>and</strong>/or expansion of primary schools through<br />

the primary school capital programme, protecting all existing community facilities <strong>and</strong><br />

services throughout the borough where there is an identified need'. The emerging<br />

White City Opportunity Area Draft <strong>Planning</strong> Framework identifies that there is currently<br />

unmet childcare need in the north of the borough, which will become more severe with<br />

development in the opportunity area. It states that the only nursery school in the<br />

opportunity area, located in White City Estate is at capacity <strong>and</strong> that all primary schools<br />

in <strong>and</strong> close to the opportunity area are full, with the exception of Canberra School<br />

which since coming out of `special measures' is filling <strong>and</strong> is expected to be at capacity<br />

soon. It identifies that in the short term there may be an option to add one additional<br />

form of entry at a local school.<br />

3.4 Policy DM D1 of the Development Management Local Plan states that `Proposals<br />

for new or exp<strong>and</strong>ed community uses should meet local need, be compatible with <strong>and</strong><br />

minimise impact on the local environment <strong>and</strong> be accessible to all in the community<br />

they serve', <strong>and</strong> that `In any development proposal, existing community uses should be<br />

retained or replaced, unless there is clear evidence that there is no longer an identified<br />

need for a particular facility'.<br />

3.5 In terms of the dem<strong>and</strong> for the expansion of the capacity of a school in this<br />

location, admissions statistics for Pope John School have shown an increase in the


number of applications for places, which demonstrate that in both 2012/13 <strong>and</strong> 2011/12<br />

the school had more than twice as many applications as places, with 79 <strong>and</strong> 77<br />

applications respectively in each period for the 30 places available.<br />

3.6 As Pope John School provides a faith-based Roman Catholic education it is<br />

considered that the dem<strong>and</strong> for additional places at this school could only be met on<br />

this site or at nearby Roman Catholic primary schools. It is apparent that there is only<br />

one other Roman Catholic primary school in the borough north of central Hammersmith,<br />

which is the Good Shepherd RC Primary School on Gayford Road. However, Good<br />

Shepherd is located a mile southwest of Pope John School. Due to the low number of<br />

Roman Catholic primary schools in the borough <strong>and</strong> the distance of this school from<br />

Good Shepherd RC Primary School <strong>and</strong> other Roman Catholic schools in the borough,<br />

it is considered that the provision of additional places at one of the other schools<br />

identified would not meet the needs of children <strong>and</strong> families in this part of the borough.<br />

Pope John School thereby propose to exp<strong>and</strong> its capacity to accommodate the dem<strong>and</strong><br />

for places in this part of the borough, <strong>and</strong> though it is acknowledged that the expansion<br />

to 60 places per year would still fall short of the current level of applications, it is also<br />

acknowledged that the 2-form entry is necessary. The aim of the school is to deliver the<br />

additional places by September 2014, <strong>and</strong> to phase the increase in capacity over a<br />

number of years by introducing an additional class each year until there are two classes<br />

in each year.<br />

3.7 The applicants have demonstrated that there is significant dem<strong>and</strong> for places at<br />

the school which is heavily oversubscribed. The proposal would enable the school to<br />

effectively double its annual intake <strong>and</strong> this is supported by the Local Education<br />

Authority, as part of a strategy to exp<strong>and</strong> capacity at popular primary schools in the<br />

borough to meet rising dem<strong>and</strong>. The school is one of only two Roman Catholic schools<br />

in this part of the borough which limits the scope for meeting the specific dem<strong>and</strong> for<br />

Catholic primary school places in the locality. Furthermore, there is a general shortage<br />

of primary school places in the north of the borough. The proposal would therefore<br />

assist in meeting the dem<strong>and</strong> for Catholic primary school places. If planning permission<br />

were to be forthcoming, the applicants would hope to have the development ready in<br />

time for the September 2014 intake. This would provide substantial public benefits as<br />

defined in the NPPF. The proposed school expansion would also be in line with the<br />

aims of White City Opportunity Area Core Strategy Strategic Policy, Strategic Site <strong>and</strong><br />

Housing Regeneration Area policy WCOA2 <strong>and</strong> Borough Wide Strategic Policy CF1<br />

along with Development Management Local Plan Policy DM D1.<br />

3.8 As part of the development it is proposed to demolish both the existing nursery<br />

building in the south eastern corner of the site <strong>and</strong> the existing Fatima Parish Centre in<br />

the north western corner of the site. It is considered that incorporating the nursery class<br />

within the school would be of benefit in terms of maximising the open space available<br />

on the enlarged school site.<br />

3.9 The existing Fatima Parish Centre was closed by Westminster Dioceses, its<br />

operator, in late May this year due to its poor condition. The Fatima Parish Centre would<br />

be relocated to the existing school hall, this part of the existing school site being<br />

separated off to create its own curtilage <strong>and</strong> a replacement school hall would be<br />

provided in the new school building. The proposed relocation would position the Fatima<br />

Parish Centre adjacent to the church <strong>and</strong> presbytery, which is considered to be a more<br />

practical location than the existing separation of the two. At present the location of the<br />

centre on the corner of Commonwealth Avenue <strong>and</strong> India Way is considered by the


dioceses to discourage free use of the centre by parish groups, the applicants stating<br />

that the current facility is used very little by the parish community (its predominant<br />

purpose) <strong>and</strong> that the existing school hall facilities are actually used for a number of<br />

these activities at present, which also demonstrates that the proposed location <strong>and</strong><br />

facilities are better suited to the needs of the parish than the existing Fatima Centre.<br />

The relocation <strong>and</strong> refurbishment of the existing school hall would also improve the<br />

st<strong>and</strong>ard of facilities available for use by the wider local community.<br />

3.10 At present the existing Fatima Parish Centre is located on India Way to the north<br />

of the White City Community Centre. Both these facilities provide space for local<br />

community groups to hold events <strong>and</strong> activities. The Fatima Parish Centre was, until its<br />

recent closure, used by the local community for events including a computer group, a<br />

youth group, dominos, kung fu, zumba, Irish dancing <strong>and</strong> by the Church of Grace, a<br />

church group unrelated to the parish. On completion of the proposed development the<br />

Fatima Parish Centre facilities would be provided in the previous school hall <strong>and</strong><br />

adjacent areas. These areas would be remodelled internally <strong>and</strong> fully refurbished to<br />

provide up to date facilities which better meet the needs of the parish <strong>and</strong> local<br />

community. During the construction period the school have agreed to assist local<br />

community groups by allowing use of the existing school facilities, wherever possible, as<br />

an alternative temporary solution until the new Fatima Parish Centre facilities are<br />

completed. It is also possible that existing users of the centre would seek to relocate to<br />

other nearby facilities, including the adjacent White City Community Centre. The<br />

applicants have stated that to date none of the former users of the Fatima Parish Centre<br />

have sought their assistance to relocate their activities following the closure of the<br />

existing Centre. It is intended that the use of the relocated Fatima Parish Centre would<br />

be maximised, with parish <strong>and</strong> other local community groups being encouraged to make<br />

effective use of the refurbished space. The dioceses intend to publicise the new<br />

facilities local <strong>and</strong> to welcome applications for use from any group, including users of<br />

the former Fatima Parish Centre. It is therefore considered that the relocation of the<br />

Fatima Parish Centre would provide improved community facilities <strong>and</strong> would be in line<br />

with the aims of Borough Wide Strategic Policy CF1 of the Core Strategy <strong>and</strong> policy DM<br />

D1 of the Development Management Local Plan.<br />

3.11 The existing school currently also provides accommodation for local community<br />

use outside normal school hours. At present it is used by a breakfast club, after school<br />

clubs, for parish activities <strong>and</strong> by QPR Football Club. It is intended that the new facilities<br />

proposed in this application would allow the school to better provide facilities for<br />

community use, <strong>and</strong> as such the building has been specifically designed to facilitate out<br />

of hours use. The new school building would provide a single court internal sports<br />

facility, meeting rooms <strong>and</strong> ICT for school controlled occasional pre-planned community<br />

use outside of the school day. The school intend to provide learning programmes for<br />

parents <strong>and</strong> the local community, both within <strong>and</strong> beyond the school day, <strong>and</strong> services<br />

before <strong>and</strong> after the school day to assist with childcare. The use of the school by the<br />

local community would be controlled by a suggested condition (condition 6).<br />

3.12 It is noted that the southernmost strip of the school playground <strong>and</strong> the treed open<br />

space to the south east of the school is the designated nature conservation area <strong>and</strong><br />

open space known as `White City Community Garden'. The designated area also<br />

incorporates the Hammersmith North Area Housing Office building. Policy DM E1 of the<br />

Development Management Local Plan seeks to reduce open space deficiency <strong>and</strong> to<br />

improve the quality of, <strong>and</strong> access to, existing open spaces. Policy DM E3 of the<br />

Development Management Local Plan seeks to protect nature conservation areas from


development likely to cause demonstrable harm to their ecological (habitats <strong>and</strong><br />

species) value. The main potential for impact of the proposed development upon the<br />

open space <strong>and</strong> nature conservation area would be the demolition of the nursery<br />

building which lies to the north of the community garden. The new built development<br />

proposed is located at some distance from this area of the site, however; <strong>and</strong> it is<br />

considered that the proposal would not be harmful to the quality of the designated open<br />

space or nature conservation area.<br />

3.13 The proposed new building <strong>and</strong> demolition of the nursery would impact on the<br />

open space within the site. It is considered on balance, however, that the c.200sq.m<br />

loss of open space on the site would be justifiable in view of the improved school<br />

facilities the development would result in <strong>and</strong> the rationalisation of the remaining play<br />

space. The demolition of the existing nursery would create a more useable area of<br />

playspace on the eastern side of the site. It is proposed to create a new multi use<br />

games area in the north eastern corner of the site which would allow a range of sports<br />

to take place with a separately fenced court. To the south of the new school building it<br />

is proposed to create a new l<strong>and</strong>scaped playspace. It is considered that the two new<br />

areas of playspace together with the remaining open areas on the eastern side of the<br />

site would compensate for the small overall reduction in playspace <strong>and</strong> therefore would<br />

be acceptable in this instance.<br />

DESIGN<br />

3.14 Paragraph 58 of the NPPF states that planning decisions should aim to ensure<br />

that developments 'will function well <strong>and</strong> add to the overall quality of the area, not just<br />

for the short term but over the lifetime of the development; establish a strong sense of<br />

place, using streetscapes <strong>and</strong> buildings to create attractive <strong>and</strong> comfortable places to<br />

live, work <strong>and</strong> visit; optimise the potential of the site to accommodate development,<br />

create <strong>and</strong> sustain an appropriate mix of uses (including incorporation of green <strong>and</strong><br />

other public space as part of developments) <strong>and</strong> support local facilities <strong>and</strong> transport<br />

networks; respond to local character <strong>and</strong> history, <strong>and</strong> reflect the identity of local<br />

surroundings <strong>and</strong> materials, while not preventing or discouraging appropriate<br />

innovation; create safe <strong>and</strong> accessible environments where crime <strong>and</strong> disorder, <strong>and</strong> the<br />

fear of crime, do not undermine quality of life or community cohesion; <strong>and</strong> are visually<br />

attractive as a result of good architecture <strong>and</strong> appropriate l<strong>and</strong>scaping'. Paragraph 60<br />

states '<strong>Planning</strong> policies <strong>and</strong> decisions should not attempt to impose architectural styles<br />

or particular tastes <strong>and</strong> they should not stifle innovation, originality or initiative through<br />

unsubstantiated requirements to conform to certain development forms or styles. It is,<br />

however, proper to seek to promote or reinforce local distinctiveness'.<br />

3.15 London Plan policy 7.1 requires that all new development is of high quality that<br />

responds to the surrounding context <strong>and</strong> improves access to social <strong>and</strong> community<br />

infrastructure, contributes to the provision of high quality living environments <strong>and</strong><br />

enhances the character, legibility, permeability <strong>and</strong> accessibility of the surrounding<br />

neighbourhood.<br />

3.16 London Plan policy 7.4 states that 'Buildings, streets <strong>and</strong> open spaces should<br />

provide a high quality design response that: a) has regard to the pattern <strong>and</strong> grain of the<br />

existing spaces <strong>and</strong> streets in orientation, scale, proportion <strong>and</strong> mass, b) contributes to<br />

a positive relationship between the urban structure <strong>and</strong> natural l<strong>and</strong>scape features, c) is<br />

human in scale, ensuring buildings create a positive relationship with street level activity<br />

<strong>and</strong> people feel comfortable with their surroundings, d) allows existing buildings <strong>and</strong>


structures that make a positive contribution to the character of a place to influence the<br />

future character of the area, <strong>and</strong> e) is informed by the surrounding historic environment'.<br />

Policy 7.6 of the London Plan requires development to be of high architectural quality<br />

that is of a scale that is compatible with the surrounding area that makes a positive<br />

contribution to the immediate, local <strong>and</strong> wider area.<br />

3.17 Relevant local policies concerning the design of the proposed development<br />

include DM G1 of the Development Management Local Plan <strong>and</strong> policy BE1 of the Core<br />

Strategy.<br />

3.18 Policy BE1 of the Core Strategy 2011 states that 'Development should create a<br />

high quality urban environment that respects <strong>and</strong> enhances its townscape context <strong>and</strong><br />

heritage assets. There should be an approach to accessible <strong>and</strong> inclusive urban design<br />

that considers how good design, quality public realm, l<strong>and</strong>scaping <strong>and</strong> l<strong>and</strong> use can be<br />

integrated to help regenerate places. In particular, development throughout the borough<br />

should be of the highest st<strong>and</strong>ard of design that respects local context <strong>and</strong> character<br />

<strong>and</strong> should protect <strong>and</strong> enhance the character, appearance <strong>and</strong> setting of the borough's<br />

conservation areas <strong>and</strong> its historic environment'.<br />

3.19 Development Management Local Plan policy DM G1 states that `development will<br />

be permitted if it is of a high st<strong>and</strong>ard of design <strong>and</strong> compatible with the scale <strong>and</strong><br />

character of existing development <strong>and</strong> its setting'. It the use of innovative <strong>and</strong><br />

contemporary materials will be welcomed, provided these enable the design to be<br />

sensitively integrated into the existing built form <strong>and</strong> l<strong>and</strong>scape. All proposals must be<br />

formulated to respect:<br />

a) the historical context <strong>and</strong> townscape setting of the site, <strong>and</strong> its sense of place;<br />

b) the scale, mass, form <strong>and</strong> grain of surrounding development;<br />

c) the relationship of the proposed development to the existing townscape,<br />

including the local street pattern, local l<strong>and</strong>marks <strong>and</strong> the skyline;<br />

d) the local design context, including the prevailing rhythm <strong>and</strong> articulation of<br />

frontages, local building materials <strong>and</strong> colour, <strong>and</strong> locally distinctive architectural<br />

detailing, <strong>and</strong> thereby promote <strong>and</strong> reinforce local distinctiveness;<br />

e) the principles of good neighbourliness;<br />

f) the local l<strong>and</strong>scape context <strong>and</strong> where appropriate should provide good<br />

l<strong>and</strong>scaping <strong>and</strong> contribute to an improved public realm; <strong>and</strong><br />

g) sustainability objectives; including adaptation to, <strong>and</strong> mitigation of, the effects of<br />

climate change;<br />

h) the principles of accessible <strong>and</strong> inclusive design; <strong>and</strong><br />

i) the principles of Secured by Design.<br />

3.20 The proposal involves the demolition of the existing Fatima Centre <strong>and</strong> the nursery<br />

accommodation block to the school, to which there are no objections. These post war<br />

buildings are not of any architectural or historic interest. There are no objections to the<br />

demolition of the linking elements to allow separation of the existing school building<br />

from the existing school hall which would be remodelled to provide replacement<br />

community facilities following demolition of the Fatima Centre.<br />

3.21 The proposed two storey school building to replace the existing Fatima Parish<br />

Centre would provide a strong corner in urban design terms to the junction of<br />

Commonwealth Avenue <strong>and</strong> India Way. The height <strong>and</strong> massing of the building are<br />

considered appropriate for this location <strong>and</strong> provide sufficient enclosure to the street.<br />

The corner of the building would be marked with fixed glazing in the shape of a cross


which would be illuminated from within at night <strong>and</strong> would create a subtle symbol of the<br />

identity of the school in the streetscene. The corner element of the building would be<br />

constructed in Staffordshire Blue brick, which is grey in colour but has a blue tinge. An<br />

active frontage at ground floor level would be provided to India Way including the main<br />

entrance <strong>and</strong> reception to the school <strong>and</strong> to Commonwealth Avenue. The whole<br />

building would be set back from the street behind a low boundary treatment to create<br />

defensible space, but part of the ground floor around the entrance on India Way would<br />

be further recessed to allow space for waiting parents to gather off the pavement.<br />

3.22 At first floor level on either side of the entrance on India Way <strong>and</strong> at first floor level<br />

on part of the Commonwealth Avenue elevation the brickwork would be relieved by a<br />

glazed terracotta tiling system to provide articulation, colour <strong>and</strong> visual interest, which is<br />

considered particularly important where the void above the new school hall on<br />

Commonwealth Avenue limits the potential for windows. Six ceramic long rectangular<br />

shaped tiles each of a different colour would be arranged vertically in each panel <strong>and</strong><br />

they would be evenly spaced against a two tone horizontal striped background which<br />

would be consistent across the elevation. The first floor elevation would be subdivided<br />

into five equal height panels within each bay <strong>and</strong> the arrangement of the colour of the<br />

tiles would mirror vertically from one panel down to the next. The colour pattern would<br />

repeat across the each bay to ensure that no two adjacent tiles (either vertically or<br />

horizontally) are the same colour <strong>and</strong> that only two colour arrangements are ever<br />

required. Details of material samples <strong>and</strong> the range of colours <strong>and</strong> the colour pattern<br />

for the ceramic tiles would be subject to a condition (condition 7). The southern <strong>and</strong><br />

eastern elevations of the proposed building would be in brick.<br />

3.23 The proposal was reviewed by the Council's Design Review Panel in December<br />

2012. The DRP strongly supported the use of colour <strong>and</strong> the creation of a distinctive<br />

corner feature to create a focus in the streetscene <strong>and</strong> give the building character. The<br />

proposals were revised prior to submission of the application in order to reflect the<br />

suggestions of the DRP including a simplification of the material palette to remove areas<br />

of render <strong>and</strong> amendments to the design of the brick <strong>and</strong> glass corner feature.<br />

3.24 The proposed l<strong>and</strong>scaping plan would enhance the play areas across the site <strong>and</strong><br />

provide new soft l<strong>and</strong>scaping, which currently contains few trees <strong>and</strong> little soft<br />

l<strong>and</strong>scaping.<br />

3.25 The proposals would meet the needs of the school, allowing it to exp<strong>and</strong> <strong>and</strong><br />

improve its facilities, while improving the appearance of the streetscene <strong>and</strong> adding<br />

visual interest to the townscape. The proposal makes good use of the available l<strong>and</strong><br />

<strong>and</strong> will enhance the quality of the built environment in the local area.<br />

IMPACT ON NEIGHBOURS<br />

3.26 The proposed new school building would consist of a detached, primarily two<br />

storey building fronting located on the junction of India Way <strong>and</strong> Commonwealth<br />

Avenue. The new building would be similar in scale to the existing Fatima Centre on the<br />

corner <strong>and</strong> along the site's northern boundary with Commonwealth Road, with only<br />

some minor infilling versus the current situation <strong>and</strong> a slight increase in height. The<br />

proposed building would be similar in scale along its western India Way frontage, the<br />

significant difference being that it would extend significantly further south than the<br />

existing Fatima Centre whilst maintaining a similar building line in relation to its<br />

projection towards India Way. Along the India Way frontage there would be an overhang


at first floor level, with the majority of the ground floor being variably recessed to form<br />

shallow covered areas. The main school entrance would be relocated to a slightly south<br />

of centre position on this elevation, relocating the current main school entrance from<br />

Commonwealth Avenue <strong>and</strong> being further south than the entrance to the existing<br />

Fatima Centre on India Way. There would be single storey elements on the north<br />

eastern side of the new building <strong>and</strong> at its southern end, where there would also be a<br />

canopy adjacent to the playground to the south of the building.<br />

Daylight <strong>and</strong> sunlight<br />

3.27 The nearest residential properties to the proposed new building are on the<br />

opposite sides of Commonwealth Avenue to the north, <strong>and</strong> India Way to the west. There<br />

is also a flat associated with the school located above the part of the school which<br />

would be converted to form the new Fatima Parish Centre. On the northern side of<br />

Commonwealth Avenue opposite the site sits a five-storey brick built residential building<br />

typical of the White City Estate with south facing windows <strong>and</strong> balconies. This building<br />

forms part of Havelock Close <strong>and</strong> its southern flank wall is a minimum of 18m from the<br />

northern flank wall of the new school building. To the west, on the opposite side of India<br />

Way, sits Malabar Court, an untypical building within the White City Estate with<br />

alternately angled bay windows which rises from two-storeys at its southern end to fivestoreys<br />

centrally, with a taller core behind, <strong>and</strong> falls back to three storeys at its northern<br />

end. At the closest point of its projecting bay windows Malabar Court is 15m from the<br />

closest point of the proposed building, the inverted sections of Malabar Court's<br />

elevations being an additional metre away from the proposed building. The first floor flat<br />

within the school site has westerly facing windows which would look towards the<br />

proposed school building, however these are located a minimum of 24m from the<br />

proposed building. To the south of the site, adjacent to the proposed building sits the<br />

White City Community Centre. This building is to the south <strong>and</strong> a minimum of 22m from<br />

the building <strong>and</strong> would not be detrimentally impacted upon by the proposed building.<br />

3.28 The proposed building has been designed to ensure that the development would<br />

not intrude across a 25-degree vertical angle taken from the centre of the lowest<br />

windows in both Malabar Court <strong>and</strong> Havelock Close, <strong>and</strong> also the first floor flat within<br />

the site, <strong>and</strong> would therefore pass the initial BRE test for windows opposite proposed<br />

development <strong>and</strong> would thereby ensure that suitable sunlight <strong>and</strong> daylight to habitable<br />

rooms would be maintained following the construction of the scheme. It is therefore<br />

considered that no significant loss of sunlight or daylight would therefore occur to the<br />

nearest residential windows.<br />

Outlook<br />

3.29 The only views of the proposed new school building for residential properties<br />

would be from opposite the site to its north <strong>and</strong> west. As discussed with regards to<br />

daylight <strong>and</strong> sunlight, at the closest point of its projecting bay windows Malabar Court to<br />

the west is 15m from the proposed building <strong>and</strong> Havelock Close to the north is a<br />

minimum of 18m from the proposed building. The first floor flat within the school site has<br />

westerly facing windows which would look towards the proposed building, however<br />

these are located a minimum of 24m from the proposed building. The height of the<br />

proposed building on its northern <strong>and</strong> western elevation faces would be 7.6m, in<br />

comparison with the maximum height of the existing Fatima Parish Centre of 6.3m.<br />

Given the distances that the nearest residential windows are away from the proposed<br />

building it is considered that there would not be any detrimental reduction in outlook to<br />

neighbouring residential properties as a result of the 1.3m increase in height of the<br />

building. It is acknowledged that the building would extend southwards of the existing


Fatima Parish Centre <strong>and</strong> would also infill some single storey areas in comparison with<br />

the existing building on its northern <strong>and</strong> western sides. The building would be similarly<br />

positioned <strong>and</strong> generally only slightly higher than the existing structure. For these<br />

reasons, it is not considered that outlook of residents to the west <strong>and</strong> north would be<br />

materially compromised.<br />

Privacy<br />

3.30 In terms of privacy, SPD Housing Policy 8 of the <strong>Planning</strong> Guidance<br />

Supplementary <strong>Planning</strong> Document states that new windows should normally be<br />

positioned so that the distance to any residential windows is not less than 18 metres as<br />

measured by an arc of 60 degrees taken from the centre of the proposed new window.<br />

The proposed windows in the northern elevation facing Havelock Close would comply<br />

with this st<strong>and</strong>ard as they would be a minimum of 18m away from the nearest<br />

residential windows. Similarly the windows facing the first floor sat within the school site<br />

would be a minimum of 24m from the closest proposed first floor window in the new<br />

building <strong>and</strong> would therefore comply with this st<strong>and</strong>ard. The proposed windows on the<br />

western elevation facing Malabar Court would, however, not meet this st<strong>and</strong>ard, falling<br />

short, at the closest point, by 3m. It is noted, however, that the existing Fatima Parish<br />

Centre has ground <strong>and</strong> first floor windows facing Malabar Court in similar positions to<br />

those proposed in the replacement building, <strong>and</strong> that the southernmost part of the<br />

building would only have ground floor windows which would be set back beneath the<br />

first floor overhang. These existing windows at Malabar Court face onto the street, <strong>and</strong><br />

would still be set a good distance away, across the highway. It is considered that the<br />

relationship between the windows in the proposed school building <strong>and</strong> Malabar Court<br />

would thereby not result in overlooking to the detriment of the privacy of residential<br />

occupiers at that property.<br />

Noise/disturbance<br />

3.31 In terms of the use of the buildings <strong>and</strong> their impact on residential properties it is<br />

acknowledged that there would be increased activity on the site as a result of the<br />

increase in numbers of pupils, especially at the beginning <strong>and</strong> end of each school day.<br />

Currently a maximum total of 300 pupils use the playgrounds at any one time.<br />

Following the development play times would be staggered, limiting a maximum number<br />

of 240 pupils outside at any one time in order to limit the impact of the additional<br />

numbers of children using the playgrounds. The existing playspace opposite Malabar<br />

Court would no longer be for older pupils <strong>and</strong> noisy play but would be redesigned as an<br />

Early Years Foundation Stage pupils learning space, involving quieter activities than is<br />

currently the case. A School Management Plan would be required by condition<br />

(condition 16) which would detail the numbers using the external play areas, the number<br />

<strong>and</strong> times of recreation times as well as other issues such as the staffing at the school<br />

gates to control the potential for noise <strong>and</strong> disturbance.<br />

3.32 In order to protect the existing residential amenities of surrounding occupants in<br />

respect of the potential noise <strong>and</strong> disturbance arising from within the building, conditions<br />

are proposed to control noise output from activities <strong>and</strong> plant/equipment as well as<br />

nuisance from kitchen odours <strong>and</strong> any external lighting, to ensure that the proposal<br />

accords with Development Management Local Plan policies DM H9, DM H10 <strong>and</strong> DM<br />

H11 (conditions 21, 22, 23, 24 <strong>and</strong> 25).


HIGHWAYS <strong>and</strong> PARKING<br />

3.33 The NPPF requires developments that generate significant movement are located<br />

where the need to travel will be minimised <strong>and</strong> the use of sustainable transport modes<br />

can be maximised, <strong>and</strong> development should protect <strong>and</strong> exploit opportunities for the use<br />

of sustainable transport modes for the movement of goods or people.<br />

3.34 Policies 6.1, 6.3, 6.10, 6.11 <strong>and</strong> 6.13 of The London Plan set out the intention to<br />

encourage consideration of transport implications as a fundamental element of<br />

sustainable transport, supporting development patterns that reduce the need to travel or<br />

that locate development with high trip generation in proximity of public transport<br />

services. The policies also provide guidance for the establishment of maximum car<br />

parking st<strong>and</strong>ards.<br />

3.35 Core Strategy policy T1 supports The London Plan. Policy DM J2 of the<br />

Development Management Local Plan set out vehicle parking st<strong>and</strong>ards, which brings<br />

them in line with London Plan st<strong>and</strong>ards <strong>and</strong> circumstances when they need not be met.<br />

However, there are no specific parking requirements for schools <strong>and</strong> each application is<br />

assessed on its own merits.<br />

3.36 The increase in the school from a 1 to a 2 form entry would be incremental on an<br />

annual basis, with one additional class per year from 2014. There have been detailed<br />

discussions between officers <strong>and</strong> the school around the potential impacts of this<br />

increase in the size of the school on the public highway <strong>and</strong> parking. In the last couple<br />

of months positive steps have been taken to increase the number of initiatives at the<br />

school to encourage sustainable travel <strong>and</strong> secure their travel plan on the TFL STAR<br />

accreditation system. Information has been submitted with this application support the<br />

assertion that the school will reduce vehicular travel as 87% of children who attend<br />

currently live within easy walking distance. Further work with the Council's School<br />

Travel <strong>Planning</strong> Advisor would ensure the level of car use is significantly reduced<br />

further, even with the increase in numbers of children as a result of the proposal. Most<br />

of the new pupils are expected to be from within the White City Estate <strong>and</strong> therefore<br />

within easy walking distance of the school. The impact on highways as a result of<br />

vehicles parking on-street <strong>and</strong> dropping off / picking up children is directly linked to the<br />

trip generation mode share through the travel plan, <strong>and</strong> therefore the travel plan<br />

underpins the whole expansion of the school. Officers are satisfied that the impact of<br />

the development on on-street parking in the vicinity of the site can be sufficiently<br />

controlled through the school's travel plan, particularly given that the increase in pupil<br />

numbers would be incremental.<br />

3.37 Neither the Development Management Local Plan nor The London Plan state<br />

specific parking requirements for D1 uses. The existing ten staff car parking spaces on<br />

site would be reduced to six spaces (one of which would be wheelchair accessible) to<br />

be shared by the school <strong>and</strong> the replacement Fatima Parish Centre. The removal of<br />

four of the existing car parking spaces would encourage a reduction in car use by staff<br />

<strong>and</strong> is targeted in the school's travel plan <strong>and</strong> would be acceptable in accordance with<br />

both sustainable travel policies (London Plan policy 6.13 <strong>and</strong> Table 6.2) <strong>and</strong> the fact<br />

that the site has a good level of accessibility at PTAL 4. School visitors with mobility<br />

issues, including blue badge holders, would need to discuss travel arrangements with<br />

the school on an individual basis.


3.38 A swept path analysis has now been provided to show a vehicle can access each<br />

of the new six car parking spaces.<br />

3.39 With regards to cycle parking, st<strong>and</strong>s are proposed which would result in provision<br />

for storage of sixty six bicycles. London Plan policy 6.9 <strong>and</strong> Table 6.3 require 1 parking<br />

space per 10 staff or students. The proposed provision would exceed this requirement<br />

<strong>and</strong> is therefore considered to be acceptable in this regard. There are also forty<br />

children's scooter spaces proposed. A condition is recommended to ensure the<br />

permanent provision of secure <strong>and</strong> weatherproof cycle <strong>and</strong> children's scooter storage<br />

(condition 19).<br />

3.40 There are two existing vehicular accesses to the site, one to Commonwealth<br />

Avenue to the north <strong>and</strong> one for emergency access only to Canada Way. Both<br />

accesses would be relocated as part of the proposed development, the access onto<br />

Commonwealth moving 4 metres westward <strong>and</strong> the access onto Canada Way moving<br />

16 metres southwards. This latter access onto Canada Way would be used by<br />

emergency vehicles only <strong>and</strong> the school have confirmed this in writing.<br />

3.41 Information has been provided in relation to servicing of <strong>and</strong> deliveries to the<br />

extended school which demonstrates that there would not be a significant increase in<br />

comings <strong>and</strong> goings in this regard. The arrangements would be as per existing, with the<br />

majority of servicing taking place early in the morning or during the school day to ensure<br />

there is no conflict with the peak school times. The servicing arrangements, including<br />

management of delivery times, numbers <strong>and</strong> sizes of vehicle, would form part of a<br />

service management plan to be submitted <strong>and</strong> approved as a condition of a planning<br />

approval (condition 18). Subject to this condition, the proposed servicing for the school<br />

is considered satisfactory.<br />

3.42 Given that the site would continue to operate throughout the construction period a<br />

construction logistics plan is required by condition in order to mitigate any detrimental<br />

impact (condition 20). This would also require that no deliveries should occur during<br />

peak times or conflict with school peak times.<br />

3.43 With regards to the relocated Fatima Parish Centre, information has been provided<br />

regarding its existing <strong>and</strong> potential proposed uses <strong>and</strong> a comparison of the old <strong>and</strong> new<br />

facilities. It is clear that the main hall would not be significant larger than that in the<br />

existing facility <strong>and</strong> therefore it is not expected that this relocation would result in a<br />

significant increase in trips for any new clubs or meetings that may occur at the<br />

relocated centre as its capacity is not significantly increasing. It is considered<br />

necessary, however to require by condition a community centre travel plan to monitor<br />

the use of the relocated parish centre (condition 39). Public transport information <strong>and</strong><br />

information on the management of the car park should be made available to users of<br />

the centre <strong>and</strong> sustainable travel should be encouraged. Generally community centres<br />

do attract 'local' users, but the provision of a travel plan would provide the opportunity to<br />

record this information <strong>and</strong> sufficiently address any concerns relating to an increase in<br />

use of the improved facilities.<br />

3.44 Details of an access management strategy for the school, nursery <strong>and</strong> Fatima<br />

Parish Centre which would include information on the pedestrian <strong>and</strong> vehicular<br />

accesses, coach information <strong>and</strong> how the car park would be managed are required by<br />

condition (condition 42) in order to ensure no detrimental impact of the development<br />

upon the surrounding highways. The access management strategy would be a live


document that should be annually reviewed to address any highways issues that may<br />

arise once the buildings are occupied, <strong>and</strong> would also provide a mechanism to monitor<br />

the impact of the development on the surrounding highway.<br />

3.45 Suitable storage space for refuse <strong>and</strong> recycling is required to be provided. It is not<br />

acceptable for waste material to be left on the highway for extended periods of time. A<br />

refuse storage area has been indicated close to the proposed school kitchen <strong>and</strong> would<br />

be accessed via the relocated vehicular access from Commonwealth Avenue. Details<br />

of refuse <strong>and</strong> recycling storage consistent with the requirements set out in the <strong>Planning</strong><br />

Guidance Supplementary <strong>Planning</strong> Document (2013) are required by condition<br />

(condition 26).<br />

SECURED BY DESIGN<br />

3.46 London Plan policy 7.3 requires new development to incorporate crime prevention<br />

measures to provide a safe <strong>and</strong> secure environment. Policy DM G1 of the Development<br />

Management Local Plan requires developments to incorporate the principles of Secured<br />

by Design. The proposed development would be designed to achieve Secured By<br />

Design certification, <strong>and</strong> a condition would be attached requiring final details of the SBD<br />

measures to be incorporated (condition 14).<br />

ACCESSIBILITY<br />

3.47 London Plan policy 7.2 requires that new development to embrace the principles<br />

of accessible <strong>and</strong> inclusive design, <strong>and</strong> this is also a requirement of policy DM G1 of the<br />

Development Management Local Plan. In accordance with this policy position, careful<br />

consideration has been given to the accessibility of the new school building, <strong>and</strong><br />

extensions. The proposed development would significantly improve access for mobility<br />

impaired pupils in existing classes as well as in the new building, with the proposed new<br />

building incorporating lift access.<br />

3.48 It is therefore considered that the proposed development would ensure ease of<br />

access for all users, but a condition is recommended to ensure that the development is<br />

constructed according to these relevant criteria (condition 17).<br />

ENVIRONMENTAL MATTERS<br />

Energy <strong>and</strong> Sustainability<br />

3.49 Policies DM H1 <strong>and</strong> DM H2 of the Development Management Local Plan seek to<br />

promote development which incorporates measures to reduce carbon dioxide <strong>and</strong><br />

utilises sustainable design <strong>and</strong> construction methods. An Energy Report has been<br />

submitted with the application in line with London Plan policy 5.2. This outlines the<br />

energy efficiency <strong>and</strong> low/zero carbon measures that would be implemented in order to<br />

minimise energy use <strong>and</strong> associated CO2 emissions, <strong>and</strong> shows that energy efficiency<br />

<strong>and</strong> renewable energy measures are planned that would improve performance beyond<br />

the 2010 Building Regulations requirements. The use of on-site renewables such as<br />

solar PV, solar water heating <strong>and</strong> heat pump system are expected to achieve significant<br />

CO2 emission reductions for the development.<br />

3.50 The proposed PV panels are to be installed on the roof of the new school building<br />

at its southern end. The proposed ASHPs <strong>and</strong> solar collectors are to be located at the<br />

northern end of the roof of the new building. Natural ventilation stacks would be located<br />

over the centre of the new building towards its northern end. The energy proposals are


considered to be appropriate for a development of this size. A condition is<br />

recommended requiring further details for the positioning of the ASHPs, PV panels,<br />

solar collectors <strong>and</strong> natural ventilation stacks to ensure their acceptability (condition 31).<br />

3.51 A commitment has been made for the newly built component of the application to<br />

aim to meet the 'Excellent' level of BREEAM, in compliance with the London Plan's<br />

policies on sustainable design <strong>and</strong> construction (policy 5.3 <strong>and</strong> associated).<br />

Flood Risk <strong>and</strong> Sustainable Urban Drainage Systems (SUDS)<br />

3.52 Policy DM H3 of the Development Management Local Plan seeks to promote<br />

development which incorporates measures to reduce water use <strong>and</strong> the risk of flooding.<br />

The site is within the Environment Agency's Flood Zone 1 which indicates a low risk of<br />

tidal flooding. A school is defined as a `more vulnerable' category of development, but<br />

this is no different from the existing uses on the site. Given the position of the site <strong>and</strong><br />

the existing uses of the buildings, it is considered that the development would not be at<br />

greater risk from tidal flooding.<br />

3.53 The outdoor spaces to the school would be enhanced with improved l<strong>and</strong>scaping.<br />

This is welcomed, as the current site is largely impermeable which directs the majority<br />

of surface water run-off into the public sewer system, with parts of the site potentially<br />

susceptible to surface water flooding during a heavy rainfall event. The proposed<br />

redevelopment provides an ideal opportunity to improve surface water drainage at this<br />

location, including the integration of sustainable drainage systems (SUDS). The area of<br />

permeable surfaces to be included within the site would increase as a result of new<br />

planting <strong>and</strong> soft l<strong>and</strong>scaped areas, in compliance with London Plan policy 5.13 on<br />

sustainable drainage. Due to the underlying clay soils the site is generally unsuitable for<br />

permeable surfaces, however, <strong>and</strong> it is therefore proposed to attenuate rainwater by<br />

storing surface run off in tanks for gradual release, which would be adopted for<br />

1,245sq.m of new hard surfacing <strong>and</strong> roof space <strong>and</strong> would reduce surface water runoff<br />

in line with the 50% minimum reduction targets set in the GLA SPG on Sustainable<br />

Design <strong>and</strong> Construction <strong>and</strong> Core Strategy policy CC2 (condition 13).<br />

Contaminated l<strong>and</strong><br />

3.54 Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. Conditions are recommended to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong> following<br />

the development works, in accordance with Borough Wide Strategic Policy CC4 of the<br />

Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the Development<br />

Management Local Plan (2013) (conditions 32-37).<br />

Tree protection<br />

3.55 A condition is recommended requiring the implementation of satisfactory tree<br />

protection measures for all retained trees, to ensure that the development would not<br />

have an adverse impact on any trees on site (condition 11). Subject to this condition it<br />

is considered that the development would be acceptable having regard to its impact on<br />

trees, in accordance with policy DM E4 of the Development Management Local Plan<br />

(2013).<br />

Community Infrastructure Levy (CIL)<br />

3.56 Mayoral CIL came into effect in April 2012 <strong>and</strong> is a material consideration to which<br />

regard must be had when determining this planning application. In this case, the<br />

application proposes a building <strong>and</strong> extensions for educational use for which the CIL


levy is set at £0 per square metre. So, the applicant is, in effect, exempt from paying<br />

CIL.<br />

EQUALITIES<br />

3.57 In accordance with the provisions of the Equality Act 2010, the Council is required<br />

to have due regard to its public sector equality duty. These matters have been<br />

considered, <strong>and</strong> officers' view is that the proposal would not affect individual users or<br />

groups of users of the school or Fatima Parish Centre to an unreasonable or<br />

disproportionate degree. The applicant's offer of providing alternative accommodation<br />

for users of the Fatima Parish Centre along with the fact that there are nearby existing<br />

alternative community facilities, is considered to be an appropriate arrangement in the<br />

circumstances. In the longer term the proposal would secure improved school <strong>and</strong><br />

community facilities to the benefit of individual users <strong>and</strong> groups of users.<br />

4.0 CONCLUSION <strong>and</strong> RECOMMENDATION<br />

4.1 Officers consider that the proposed l<strong>and</strong> use is acceptable <strong>and</strong> that the<br />

development would provide a valuable community facility which meets an identified<br />

educational need. The new building is considered to be of an acceptable design having<br />

regard to the needs of the building's users <strong>and</strong> the character <strong>and</strong> appearance of the<br />

area. It is also considered that the proposal would not result in harmful levels of traffic<br />

generation or impact on on-street parking, <strong>and</strong> would not have a demonstrably harmful<br />

impact on the amenities of surrounding residents. The proposal would deliver a secure,<br />

environmentally sustainable <strong>and</strong> accessible development. Subject to conditions, the<br />

development would not have a further impact on flood risk, nor would it be at risk from<br />

contaminated l<strong>and</strong>.<br />

4.2 For these reasons it is recommended that planning permission is granted, subject<br />

to conditions.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Shepherd's Bush Green<br />

Site Address:<br />

Hammersmith Park South Africa Road London<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/01084/FUL<br />

Date Valid:<br />

04.04.2013<br />

Case Officer:<br />

Katherine Wood<br />

Conservation Area:<br />

: Wood Lane Conservation Area - Number 42<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

Mr S Bennett<br />

C/o The Sports & Leisure Group Ltd 442 Wilford Lane West Bridgford Nottingham<br />

Notts<br />

NG2 7RN<br />

Description:<br />

Formation of an all-weather football facility comprising of 2no. seven-a-side pitches,<br />

11no. five-a-side pitches <strong>and</strong> a two-on-two basketball training court to replace an<br />

existing all weather pitch, tennis <strong>and</strong> basketball courts, bowling green <strong>and</strong> disused<br />

playground; Erection of a single storey pavilion containing a bar, community multi-use<br />

room, changing rooms <strong>and</strong> office; Fencing around <strong>and</strong> within the site; Lighting columns;<br />

Hard <strong>and</strong> soft l<strong>and</strong>scaping; Associated car parking providing 20no. spaces; following<br />

demolition of existing bowling pavilion, changing rooms, storage building <strong>and</strong> portacabin.<br />

Drg Nos: (08)002 Rev A00; (08)003 Rev A00; (08)004 Rev A00;(08)005 Rev A00;<br />

(08)006 Rev A00; (08)007 Rev A00;(08)008 Rev A00; (08)009 Rev A00; tree removals<br />

plan<br />

Application Type:<br />

Full Detailed <strong>Planning</strong> Application<br />

Officer Recommendation:<br />

That the Committee resolve that the Executive Director of Transport <strong>and</strong> Technical<br />

Services be authorised to determine the application <strong>and</strong> grant permission up on the<br />

completion of a satisfactory legal agreement <strong>and</strong> subject to the condition(s) set out<br />

below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) The development shall be carried out <strong>and</strong> completed only in accordance with the<br />

approved drawings, ref: (08)002 Rev A00; (08)003 Rev A00; (08)004 Rev A00;<br />

(08)005 Rev A00; (08)006 Rev A00; (08)007 Rev A00; (08)008 Rev A00; (08)009<br />

Rev A00; tree removals plan.<br />

To ensure a satisfactory external appearance <strong>and</strong> to prevent harm to the street<br />

scene, in accordance with policy BE1 of the Core Strategy 2011 <strong>and</strong> policy DM<br />

G1, G3 <strong>and</strong> G7 of the Development Management Local Plan 2013.<br />

3) The development hereby permitted shall not commence until particulars <strong>and</strong><br />

samples of materials to be used in all external faces of the new building, all<br />

boundary treatments, <strong>and</strong> all surface treatments on the site, have been submitted<br />

<strong>and</strong> approved in writing by the Council. The development shall be carried out in<br />

accordance with such details as have been approved.


To ensure a satisfactory external appearance, in accordance with Policy BE1 of<br />

the Core Strategy (2011) <strong>and</strong> Policies DM G1, G3 <strong>and</strong> G7 of the Development<br />

Management Local Plan 2013 .<br />

4) The development hereby permitted shall not be occupied or used before details of<br />

the l<strong>and</strong>scaping of all areas external to the buildings, including planting, paving,<br />

boundary walls, fences, gates <strong>and</strong> other means of enclosure, <strong>and</strong> details of<br />

defensive planting to the southern <strong>and</strong> eastern boundaries, have been submitted<br />

to <strong>and</strong> approved in writing by the Council. The development shall thereafter be<br />

carried out in accordance with the approved details.<br />

To ensure a satisfactory external relationship with its surroundings in accordance<br />

with Policies Policy BE1 of the Core Strategy (2011) <strong>and</strong> Policies DM G1, G3 <strong>and</strong><br />

G7 of the Development Management Local Plan 2013 .<br />

5) All planting, seeding <strong>and</strong> turfing approved as part of the submitted l<strong>and</strong>scaping<br />

scheme shall be carried out in the first planting or seeding seasons following the<br />

first use of the pavilion building or the completion of the development, whichever is<br />

the sooner; <strong>and</strong> any trees or shrubs which die, are removed or become seriously<br />

damaged or diseased within 5 years of the date of the initial planting shall be<br />

replaced in the next planting season with others of similar size <strong>and</strong> species.<br />

To ensure a satisfactory provision for planting, in accordance with Policy DM E4 of<br />

the Development Management Local Plan 2013.<br />

6) Before any trees are removed, a replacement tree planting scheme shall be<br />

submitted to <strong>and</strong> approved in writing by the Council. The scheme shall include<br />

details of the number, position, species <strong>and</strong> height of the replacement trees. The<br />

approved replacement trees shall be planted in the next planting season following<br />

the removal of the trees shown on the tree removal plan submitted with the<br />

application. Any replacement tree being removed or severely damaged, dying or<br />

becoming seriously diseased within 5 years of planting shall be replaced with a<br />

tree or shrub of similar size <strong>and</strong> species to that originally required to be planted.<br />

To ensure a satisfactory provision for tree planting, in accordance with Policy DM<br />

E4 of the Development Management Local Plan 2013.<br />

7) No tree, other than the trees shown for removal on the tree removal plan<br />

submitted with the application, shall be lopped, topped, felled or wilfully destroyed<br />

without the prior approval in writing of the Council. Prior to the commencement of<br />

any works on site an Arboricultural method statement, detailing the Root<br />

Protection Areas of all retained trees <strong>and</strong> methods to protect these trees during<br />

construction, shall be submitted to <strong>and</strong> approved in writing by the Council. The<br />

development shall be carried out in accordance with the approved details.<br />

To ensure the protection of trees during development work on the site <strong>and</strong> to<br />

prevent their unnecessary loss, in accordance with Policy DM E4 of the<br />

Development Management Local Plan 2013.<br />

8) The development shall not be occupied or used until full details of refuse storage,<br />

including provision for the storage of recyclable materials, have been submitted to<br />

<strong>and</strong> approved in writing by the Council. The details shall include elevational details


of any proposed storage enclosure, a management plan indicating where refuse<br />

would be placed on collection days <strong>and</strong> who would be responsible for removing<br />

<strong>and</strong> returning bins from the refuse stores to the collection points. Such details <strong>and</strong><br />

arrangements as approved shall thereafter be permanently retained/carried out.<br />

In order to ensure the development provides adequate waste storage, in<br />

accordance with Development Management Local Plan Policy DM H5, <strong>and</strong> the<br />

Council's Supplementary <strong>Planning</strong> Document.<br />

9) Prior to commencement of the development, details of secure <strong>and</strong> weatherproof<br />

cycle storage for at least 24 bicycles shall be submitted to <strong>and</strong> approved in writing<br />

by the Council. The cycle parking as approved shall be implemented prior to<br />

occupation or use of the development <strong>and</strong> shall be permanently available for the<br />

life of the development.<br />

To ensure the provision of acceptable bicycle parking, in accordance with Policy<br />

DM J5 of the Development Management Local Plan 2013.<br />

10) No development shall commence until a statement of how Secured by Design<br />

requirements are to be achieved has been submitted to <strong>and</strong> approved in writing by<br />

the council .The approved details shall be carried out before any use of that part of<br />

the development to which the approved details relate.<br />

To ensure a safe <strong>and</strong> secure environment in accordance with Policy DM G1 of the<br />

Development Management Local Plan 2013.<br />

11) The development hereby permitted shall not commence until a surface water<br />

drainage scheme, based on sustainable drainage principles, has been submitted<br />

to <strong>and</strong> approved in writing by the council. In accordance with Thames Water<br />

requests, the scheme shall show the overall reduction in surface water flows. i.e<br />

existing surface water discharges (pre-development) in to the public sewers for<br />

storm periods 1 in 10, 30, 100 versus the new proposed volumes to be discharge<br />

for the whole development. The approved scheme shall be implemented in<br />

accordance with the approved details prior to occupation or use of the<br />

development hereby permitted, <strong>and</strong> thereafter permanently retained.<br />

To prevent any increased risk of flooding <strong>and</strong> to ensure the satisfactory storage<br />

of/disposal of surface water from the site in accordance with Policy CC2 of the<br />

Core Strategy 2011, Policy 5.13 of The London Plan 2011 <strong>and</strong> the Technical<br />

Guidance to the NPPF.<br />

12) The occupation of the development hereby approved shall not commence until a<br />

Service Management Plan has been submitted to <strong>and</strong> approved in writing by the<br />

Council. The plan shall specify the number of weekly deliveries <strong>and</strong> size of<br />

vehicles to be used, as well as the times for deliveries. The development shall only<br />

be carried out in accordance with the details approved in the Service Management<br />

Plan.<br />

To ensure satisfactory provision for servicing <strong>and</strong> to prevent noise <strong>and</strong> disturbance<br />

to neighbouring residents, in accordance with Policies DM J1 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan 2013, <strong>and</strong> Transport Policy 34 of the<br />

<strong>Planning</strong> Guidance SPD.


13) The development hereby approved shall not commence until details of floodlights<br />

<strong>and</strong> other external lighting (including to the car park) have been submitted to <strong>and</strong><br />

approved in writing by the Council. Details shall demonstrate that the<br />

recommendations of the Institution of Lighting Engineers in the `Guidance Notes<br />

For The Reduction Of Light Pollution 2011' will be met, particularly with regard to:<br />

- minimising glare,<br />

- limiting the use of lights to periods of need for safety, security or permitted<br />

site use,<br />

- preventing upward illumination <strong>and</strong> sky glow,<br />

- controlling vertical illuminance of neighbouring property facades to a<br />

maximum of 10 lux at ground floor level <strong>and</strong> 5 lux at first floor.<br />

- minimising light pollution by correctly using, locating, aiming <strong>and</strong> shielding<br />

- luminaries<br />

The development shall not be occupied or used until the details as approved have<br />

been carried out.<br />

To ensure that the amenity of occupiers of the development site <strong>and</strong> surrounding<br />

premises is not adversely affected by lighting, in accordance with Policy DM H10<br />

of the Development Management Local Plan 2013.<br />

14) Prior to commencement of development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council of the rear louvres to be fitted to all floodlights<br />

on the perimeter of the site <strong>and</strong> any other louvres, as necessary. Approved details<br />

shall be implemented prior to occupation or use of the development <strong>and</strong> thereafter<br />

be permanently retained as such.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise from the operation of the site, in accordance with Policy DM H9<br />

of the Development Management Local Plan 2013.<br />

15) Prior to use of any proposed sports pitch any floodlighting shall be installed with<br />

individually controlled lights. When a pitch is not in use the floodlights to that pitch<br />

shall be switched off. The lighting shall be permanently maintained in this form.<br />

To ensure that the amenity of neighbouring occupiers is not adversely affected by<br />

light from the operation of the site, in accordance with Policy DM H10 of the<br />

Development Management Local Plan 2013.<br />

16) A post-installation light spillage survey shall be carried out <strong>and</strong> submitted to the<br />

Council for its written approval within one month of the first use of the<br />

development. The survey shall show how the recommendations of the Institution<br />

of Lighting Engineers in the `Guidance Notes For The Reduction Of Light Pollution<br />

2011' have been achieved, with particular regard to the control of illuminance of<br />

neighbouring residential facades within the recommended limits, with any<br />

mitigation measures as necessary. The approved details shall be permanently<br />

maintained as such.<br />

To ensure that the amenity of occupiers of the development site <strong>and</strong> surrounding<br />

premises is not adversely affected by lighting, in accordance with Policy DM H10<br />

of the Development Management Local Plan 2013.


17) Prior to commencement of the development, a noise assessment shall be<br />

submitted to the Council for approval, detailing external noise levels at the nearest<br />

<strong>and</strong>/or most affected noise sensitive premises <strong>and</strong> the mitigation measures, as<br />

necessary, to ensure that the neighbouring properties are not adversely affected<br />

by the operation of the development. Approved details shall be implemented prior<br />

to occupation or use of the development <strong>and</strong> thereafter be permanently retained.<br />

A post-installation noise assessment shall also be carried out <strong>and</strong> submitted to the<br />

Council within one month of the first use of the development, for written approval,<br />

to confirm compliance with the noise criteria <strong>and</strong> additional steps required to<br />

mitigate noise shall be taken, as necessary.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise from the operation of the site, in accordance with Policy DM H9<br />

of the Development Management Local Plan 2013.<br />

18) No tannoys or public address systems shall be used at the development hereby<br />

permitted.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013<br />

19) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council, of the proposed acoustic sound barriers <strong>and</strong><br />

their effect on noise mitigation. Approved details shall be implemented prior to<br />

occupation or use of the development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013.<br />

20) Neither music nor amplified voices emitted from the development hereby<br />

approved, including from the approved pavilion building, shall be audible within<br />

any residential/noise sensitive premises.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise, in accordance with DM H9 of the Development Management<br />

Local Plan 2013.<br />

21) Prior to commencement of the development hereby approved, a Demolition<br />

Management Plan, a Construction Logistics Plan <strong>and</strong> a Construction Management<br />

Plan shall be submitted to <strong>and</strong> approved in writing by the Council. Details shall<br />

include control measures for dust, noise, vibration, lighting, delivery locations,<br />

restriction of hours of work <strong>and</strong> all associated activities audible beyond the site<br />

boundary to 0800-1800hrs Mondays to Fridays <strong>and</strong> 0800-1300hrs on Saturdays,<br />

advance notification to neighbours <strong>and</strong> other interested parties of proposed works<br />

<strong>and</strong> public display of contact details including accessible phone contact to persons<br />

responsible for the site works for the duration of the works. The details shall also<br />

include the numbers, size <strong>and</strong> routes of demolition <strong>and</strong> construction vehicles,<br />

provisions within the site to ensure that all vehicles associated with the<br />

construction works are properly washed <strong>and</strong> cleaned to prevent the passage of


mud <strong>and</strong> dirt onto the highway, <strong>and</strong> other matters relating to traffic management to<br />

be agreed. Approved details shall be implemented throughout the project period.<br />

To ensure that construction works do not adversely impact on the operation of the<br />

public highway, <strong>and</strong> that the amenity of occupiers of surrounding premises is not<br />

adversely affected by noise, vibration, dust, lighting or other emissions from the<br />

building site, in accordance with Policies DM J1, DM J6, DM H9, DM H11 of the<br />

Development Management Local Plan 2013.<br />

22) Prior to use or occupation of the development hereby permitted the proposed car<br />

parking spaces shall be laid out as shown on drawing no.(08)003 Rev A00. The<br />

layout shall not be altered, unless otherwise agreed in writing by the Council. At<br />

least one of the proposed spaces shall be permanently available for disabled<br />

drivers. The parking arrangements, including the designated disabled parking<br />

bay(s), shall be permanently retained.<br />

To ensure satisfactory parking provision, including for disabled people, in<br />

accordance with Policies DM J2 <strong>and</strong> DM J4 of the Development Management<br />

Local Plan 2013.<br />

23) The development hereby permitted shall not commence until full details of how the<br />

development would be fully accessible to people with disabilities, taking account of<br />

general guidance in Chapter 4 of the <strong>Planning</strong> Guidance SPD on inclusive design,<br />

have first been submitted to <strong>and</strong> approved in writing by the Council. The<br />

development shall not be occupied or used until the approved details have been<br />

fully implemented, <strong>and</strong> the development shall thereafter be permanently retained<br />

as such.<br />

To ensure that the proposal provides an inclusive <strong>and</strong> accessible environment in<br />

accordance with the Policy DM G1 of the Development Management Local Plan<br />

2013, <strong>and</strong> Chapter 4 of the <strong>Planning</strong> Guidance SPD 2013.<br />

24) No development shall commence until a preliminary risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall comprise: a<br />

desktop study which identifies all current <strong>and</strong> previous uses at the site <strong>and</strong><br />

surrounding area as well as the potential contaminants associated with those<br />

uses; a site reconnaissance; <strong>and</strong> a conceptual model indicating potential pollutant<br />

linkages between sources, pathways <strong>and</strong> receptors, including those in the<br />

surrounding area <strong>and</strong> those planned at the site; <strong>and</strong> a qualitative risk assessment<br />

of any potentially unacceptable risks arising from the identified pollutant linkages<br />

to human health, controlled waters <strong>and</strong> the wider environment including ecological<br />

receptors <strong>and</strong> building materials. All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013) .


25) No development shall commence until a site investigation scheme is submitted to<br />

<strong>and</strong> approved in writing by the Council. This scheme shall be based upon <strong>and</strong><br />

target the risks identified in the approved preliminary risk assessment <strong>and</strong> shall<br />

provide provisions for, where relevant, the sampling of soil, soil vapour, ground<br />

gas, surface <strong>and</strong> groundwater . All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013) .<br />

26) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, following a site investigation undertaken in compliance with the<br />

approved site investigation scheme, a quantitative risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall: assess the<br />

degree <strong>and</strong> nature of any contamination identified on the site through the site<br />

investigation; include a revised conceptual site model from the preliminary risk<br />

assessment based on the information gathered through the site investigation to<br />

confirm the existence of any remaining pollutant linkages <strong>and</strong> determine the risks<br />

posed by any contamination to human health, controlled waters <strong>and</strong> the wider<br />

environment. All works must be carried out in compliance with <strong>and</strong> by a competent<br />

person who conforms to CLR 11: Model Procedures for the Management of L<strong>and</strong><br />

Contamination (Defra 2004) or the current UK requirements for sampling <strong>and</strong><br />

testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013) .<br />

27) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, a remediation method statement is submitted to <strong>and</strong> approved in<br />

writing by the Council. This statement shall detail any required remediation works<br />

<strong>and</strong> shall be designed to mitigate any remaining risks identified in the approved<br />

quantitative risk assessment. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong>


following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013) .<br />

28) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until the approved remediation method statement has been carried out<br />

in full <strong>and</strong> a verification report confirming these works has been submitted to, <strong>and</strong><br />

approved in writing, by the Council. This report shall include: details of the<br />

remediation works carried out; results of any verification sampling, testing or<br />

monitoring including the analysis of any imported soil; all waste management<br />

documentation showing the classification of waste, its treatment, movement <strong>and</strong><br />

disposal; <strong>and</strong> the validation of gas membrane placement. If, during development,<br />

contamination not previously identified is found to be present at the site, the<br />

Council is to be informed immediately <strong>and</strong> no further development (unless<br />

otherwise agreed in writing by the Council) shall be carried out until a report<br />

indicating the nature of the contamination <strong>and</strong> how it is to be dealt with is<br />

submitted to, <strong>and</strong> agreed in writing by, the Council. Any required remediation shall<br />

be detailed in an amendment to the remediation statement <strong>and</strong> verification of<br />

these works included in the verification report. All works must be carried out in<br />

compliance with <strong>and</strong> by a competent person who conforms to CLR 11: Model<br />

Procedures for the Management of L<strong>and</strong> Contamination (Defra 2004) or the<br />

current UK requirements for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013) .<br />

29) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until an onward long-term monitoring methodology report is submitted<br />

to <strong>and</strong> approved in writing by the Council where further monitoring is required past<br />

the completion of development works to verify the success of the remediation<br />

undertaken. A verification report of these monitoring works shall then be submitted<br />

to <strong>and</strong> approved in writing by the Council when it may be demonstrated that no<br />

residual adverse risks exist. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy (2011) <strong>and</strong> policies DM H7 <strong>and</strong> DM H11 of the<br />

Development Management Local Plan (2013) .


30) The sports pitches/courts hereby approved shall only be used between the hours<br />

of 9 am <strong>and</strong> 10 pm Monday-Saturday <strong>and</strong> 9 am <strong>and</strong> 9 pm on Sundays. All<br />

floodlights must be switched off by 10.15 pm (9.15 pm on Sundays).<br />

To ensure that nearby residents are not unduly disturbed by noise <strong>and</strong> light<br />

pollution, in accordance with Policies DM H8 <strong>and</strong> DM H9 of the Development<br />

Management Local Plan 2013.<br />

31) The proposed pavilion shall only be used by customers between the hours of 8.30<br />

am - 11 pm Mondays - Saturdays <strong>and</strong> 8.30 am - 10 pm on Sundays.<br />

To ensure that surrounding residents are not unduly affected by noise disturbance,<br />

in accordance with Policy DM H9 of the Development Management Local Plan<br />

2013.<br />

32) No customers shall be on the premises connected with any licensed bar use other<br />

than between the hours of 11am - 11pm Mondays - Saturdays <strong>and</strong> 11am - 10pm<br />

on Sundays.<br />

To ensure that surrounding residents are not unduly affected by noise disturbance,<br />

in accordance with Policy DM H9 of the Development Management Local Plan<br />

2013.<br />

33) The development shall not commence until all parties with an interest in the l<strong>and</strong><br />

for the purposes of s.106 of the Town <strong>and</strong> Country <strong>Planning</strong> Act 1990 have<br />

entered into a confirmatory deed agreeing to the provisions of the s.106<br />

agreement dated [ ].<br />

To ensure that successors in title to the council, which is the present owner of the<br />

site, will be bound by the planning obligation.<br />

34) Prior to commencement of the development hereby permitted, a bat survey shall<br />

be carried out <strong>and</strong> submitted to <strong>and</strong> approved in writing by the Council. The survey<br />

shall include an analysis of bat roosting habitats on <strong>and</strong> surrounding the site, to<br />

inform a review of the impact of the floodlighting scheme on bats <strong>and</strong> a mitigation<br />

strategy, if necessary. The approved details, <strong>and</strong> any mitigation measures<br />

required, shall be carried out in full prior to occupation or use of the development.<br />

To safeguard protected species, in accordance with Policy DM E3 of the<br />

Development Management Local Plan 2013 <strong>and</strong> Sustainability Policies 14-17 of<br />

the <strong>Planning</strong> Guidance SPD.<br />

35) No development shall commence until details have been submitted to <strong>and</strong><br />

approved in writing by the Council (in consultation with the Friends of<br />

Hammersmith Park) to incorporate historical park references into the pavilion<br />

building. Approved details shall be implemented prior to occupation or use of the<br />

pavilion building.<br />

To ensure a satisfactory st<strong>and</strong>ard of development which incorporates historic<br />

references from Hammersmith Park, in accordance with Policy DM G7 of the<br />

Development Management Local Plan 2013,


36) The development hereby permitted shall not commence before full details of the<br />

energy efficiency <strong>and</strong> renewable energy measures to be incorporated within the<br />

scheme, <strong>and</strong> the sustainable design <strong>and</strong> construction measures to be used, are<br />

submitted to <strong>and</strong> approved in writing by the Council. The approved details shall be<br />

implemented prior to first use of the development hereby permitted, <strong>and</strong> thereafter<br />

permanently retained.<br />

To ensure a sustainable development <strong>and</strong> the integration of energy generation<br />

from renewable sources, consistent with the Mayor's sustainable design objectives<br />

in accordance with Policies DM G1<strong>and</strong> DM H1 of the Development Management<br />

Local Plan 2013, Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The London Plan (2011), <strong>and</strong><br />

Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />

Justification for Approving the Application:<br />

1) It is considered that the proposed development is acceptable in l<strong>and</strong> use terms<br />

<strong>and</strong> is consistent with the policies on use of open space. The proposal would<br />

provide for a significant upgrade in sports facilities, with some facilities available to<br />

the local community free of charge, <strong>and</strong> park users able to make use of the cafe<br />

<strong>and</strong> public conveniences etc during park hours. It is not considered that there<br />

would be harmful impact on the conservation area or the nature conservation area,<br />

subject to conditions on replacement tree planting <strong>and</strong> in relation to bats. Subject<br />

to conditions, the impact on the amenities of neighbouring residents is considered<br />

to be acceptable. There would not be an unacceptable detrimental impact on the<br />

operation of the highway or on local parking conditions. The development would<br />

be accessible, sustainable, <strong>and</strong> subject to conditions it would not have a further<br />

impact on flood risk.<br />

It is therefore considered that the proposal would comply with London Plan<br />

Policies 7.2, 5.12, 5.13 <strong>and</strong> 5.21, Core Strategy Policies BE1, CC2, CC4, OS1 <strong>and</strong><br />

T1, Policies DM G1, DM G7, DM E1, DM E3, DM E4, DM H1, DM H2, DM H3, DM<br />

H5, DM H7, DM H8, DM H9, DM H10, DM H11, DM J1, DM J2, DM J5, DM J6 of<br />

the Development Management Local Plan 2013, Transport Policy 34, <strong>and</strong> Design<br />

Policies 1, 2, 3 <strong>and</strong> 8 of the <strong>Planning</strong> Guidance SPD.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 15th March 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013


Consultation Comments:<br />

Comments from:<br />

The Hammersmith Society<br />

White City Residents' Association<br />

Thames Water - Development Control<br />

Dated:<br />

08.05.13<br />

03.05.13<br />

12.07.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

White City Community Centre White City Estate W12 7PB 31.05.13<br />

White City Community Centre White City Estate W12 7PB 02.06.13<br />

48 Stanlake Road London W12 7HL 23.04.13<br />

NAG 13.05.13<br />

White City Community Centre India Way London W12 7QT 31.05.13<br />

White City Community Centre India Way London W12 7QT 02.06.13<br />

98 BLOEMFONTIEN ROAD LONDON W127DB 03.06.13<br />

Nag 24.04.13<br />

Nag 24.04.13<br />

Batman Close 24.05.13<br />

103 Frithville Gardens London W12 7JQ 29.05.13<br />

103 Frithville Gardens London W12 7JQ 20.05.13<br />

87 Frithville Gardens London W12 7JQ 20.05.13<br />

28 Batman Close White City Estate London W12 7NU 15.04.13<br />

45 Batman Close White City Estate London W12 7NU 15.04.13<br />

39 Batman Close White City Estate London W12 7NU 15.04.13<br />

54 Batman Close White City Estate London W12 7NU 15.04.13<br />

53 Batman Close White City Estate London W12 7NU 15.04.13<br />

57 Batman Close White City Estate London W12 7NU 15.04.13<br />

1.0 BACKGROUND<br />

1.1 The application site relates to a 1.2 hectare area of l<strong>and</strong> at the north western side<br />

of Hammersmith Park, which is a public park located on the south side of South Africa<br />

Road. The l<strong>and</strong> currently comprises a floodlit all-weather football/games pitch, a disused<br />

playground, a bowling green <strong>and</strong> associated pavilion, a two-on-two basket ball court<br />

area <strong>and</strong> three public tennis courts. There is also a single storey public convenience<br />

building <strong>and</strong> a two storey changing room block on the site.<br />

1.2 The site forms part of the strategic White City Opportunity Area (WCOA) of the<br />

Council's Core Strategy <strong>and</strong> is designated as Open Space of borough-wide importance<br />

as a local park. A small part of the application site (110 sqm along the south-western<br />

boundary) is within a designated Nature Conservation Area of Grade II borough-wide<br />

importance, <strong>and</strong> the whole site is located within the Wood Lane Conservation Area. It is<br />

also within the Environment Agency's Flood Risk Zone 1, which is at the lowest risk<br />

from tidal flooding.<br />

1.3 The site is bounded to the south west by a car park, an access road <strong>and</strong> the five<br />

storey blocks of residential flats at Batman Close. To the south <strong>and</strong> south east is the<br />

rest of Hammersmith Park which extends to Frithville Gardens, <strong>and</strong> the BBC Television<br />

Centre (a grade II listed building, which is the subject of current applications for the


edevelopment for residential use - 2013/02355/CO<strong>MB</strong>, 2013/02356/LBC,<br />

2013/02244/CAC). To the east <strong>and</strong> north east are existing residential properties at<br />

White City Close, a Territorial Army (TA) centre <strong>and</strong> light industrial buildings <strong>and</strong><br />

ancillary car parking. Across South Africa Road to the north west, are further residential<br />

flat blocks <strong>and</strong> the Canberra Heath Centre, which form part of the White City Estate.<br />

1.4 The sports <strong>and</strong> recreation facilities that form the proposed redevelopment site<br />

were first created around 40 years ago, but have since fallen into a poor state of repair.<br />

The bowling green has become overgrown, following the club's relocation to<br />

Ravenscourt Park in 2011 <strong>and</strong> the changing blocks have been v<strong>and</strong>alised. In addition,<br />

the surfaces of the all-weather sports pitch are in poor condition <strong>and</strong> heavily damaged in<br />

some places, as is the concrete surfaces of the basket ball <strong>and</strong> tennis courts.<br />

1.5 There is no relevant planning history relating to this part of Hammersmith Park.<br />

1.6 In 2011, the Council ran a tendering process to find a potential developer who<br />

could undertake to provide upgraded sport <strong>and</strong> leisure facilities on this part of<br />

Hammersmith Park. The preferred bidders were 'PlayFootball', who run a number of<br />

facilities nationwide, providing all-weather five- <strong>and</strong> seven-a-side football pitches. The<br />

current applications have been submitted by PlayFootball . The proposal seeks planning<br />

permission <strong>and</strong> conservation area consent for a scheme involving the demolition of the<br />

existing buildings <strong>and</strong> structures on the site <strong>and</strong> redevelopment to create all-weather<br />

football <strong>and</strong> basketball facilities. This would comprise 2 no. seven-a-side football<br />

pitches, 11 no. five-a-side pitches <strong>and</strong> a two-on-two basketball training court. A single<br />

storey pavilion containing a bar, community multi-use room, public toilets, changing<br />

rooms <strong>and</strong> office is also proposed; along with fencing around <strong>and</strong> within the site, the<br />

erection of lighting columns, <strong>and</strong> associated hard <strong>and</strong> soft l<strong>and</strong>scaping. A new car park<br />

accessed from South Africa Road would be created, providing twenty spaces. This<br />

report covers matters arising from both the planning application <strong>and</strong> the conservation<br />

area consent application.<br />

2.0 PUBLICITY AND CONSULTATIONS<br />

2.1 Prior to the planning applications being submitted, PlayFootball held a public<br />

exhibition on 11th December 2012 to give local people an opportunity to view <strong>and</strong><br />

comment on the proposals. The applicants say that over 3,000 local residents were<br />

invited to the exhibition via individual letter <strong>and</strong> leaflet drop. The applicants report that<br />

57 people attended the public exhibition, the majority being from the surrounding<br />

residential areas <strong>and</strong> that 50 comment forms were completed - with 66% of respondees<br />

saying that they would support the proposals for a PlayFootball facility. Those raising<br />

concern or objection mentioned that a greater range of sports facilities were needed,<br />

objections to the cost <strong>and</strong> loss of free facilities, noise <strong>and</strong> disturbance of neighbouring<br />

residents, concern about impact on street parking, lack of consultation with local people.<br />

Following the public exhibition, the applicants have reduced the size of the proposed car<br />

park <strong>and</strong> are offering that the basketball pitch would be free to use by local people,<br />

along with two football pitches.<br />

Consultations<br />

2.2 English Heritage have written saying that they have no comments, <strong>and</strong> authorising<br />

the Local Authority to determine the application.


2.3 The Football Association (FA) has written in support of the proposal <strong>and</strong> the<br />

quality of the proposed facilities.<br />

2.4 Thames Water has responded, raising no objection to the proposals on the basis<br />

of water infrastructure, <strong>and</strong> suggesting informatives which have been attached to this<br />

recommendation. A condition on surface water drainage arrangements is also<br />

requested (this is covered by Condition 11).<br />

2.5 The Metropolitan Police Crime Prevention Design Advisor has been consulted, but<br />

has not formally commented on the proposal.<br />

Notifications<br />

2.6 The planning application has been advertised by way of a site <strong>and</strong> press notice<br />

<strong>and</strong> individual notification letters were sent to 192 neighbouring properties.<br />

2.7 Sixty four responses have been received in support <strong>and</strong> fourteen responses have<br />

been received in objection to the proposal.<br />

2.8 The responses in support comprise 12 individual responses, 44 duplicate letters<br />

signed by different addresses <strong>and</strong> 8 petitions.<br />

2.9 The supporting petitions were received from the following groups:<br />

Kokhob Football Club (99 signatures)<br />

Al Ansar Football Club (83 signatures)<br />

Nile Valley Community Centre (22 signatures)<br />

Eritrean Community (15 signatures)<br />

West 12 Football Club (57 signatures)<br />

White City Youths West Eagles (39 signatures)<br />

Horn of Africa Community Group (42 signatures)<br />

White City Youth Centre (25 signatures)<br />

2.10 A letter in support from the head teachers of Phoenix High School (enclosing 50<br />

individual letters of support from students), Hammersmith Academy (enclosing a petition<br />

with 100 students' signatures) <strong>and</strong> William Morris Sixth Form (enclosing a petition with<br />

70 students' signatures) were also received.<br />

2.11 The reasons for support in the individual letters from residents <strong>and</strong> the schools,<br />

<strong>and</strong> the reasons given for support in the petitions, are as follows:<br />

- Current pitch is unsafe <strong>and</strong> in poor condition, soon the existing local community<br />

football clubs will have to stop playing on it<br />

- New pitches will be of much better quality <strong>and</strong> will encourage more engagement in<br />

sport, leading to healthier lifestyle <strong>and</strong> community involvement<br />

- Community will be able to use high quality football pitches free of charge.<br />

2.12 The letters in objection were received from local residents in Batman Close,<br />

Frithville Gardens <strong>and</strong> the White City Estate. The following grounds for objection were<br />

raised:<br />

- Noise <strong>and</strong> disturbance will increase<br />

- Disturbance from floodlighting<br />

- Lack of clarity regarding the use of the community pitches


- Football is not the only sport; provision should be made for other sports that appeal to<br />

other groups <strong>and</strong> not just young males<br />

- Tennis courts should be kept <strong>and</strong> existing pitch upgraded<br />

- Scale of proposals will kill the park as a family oasis<br />

- Existing free facilities would be replaced with facilities for which there would be a fee<br />

- No need for a bar; concern about late opening: noise <strong>and</strong> security<br />

- Excluding local people; proposal does not have the interests of the community at heart<br />

2.13 The Hammersmith Society responded with the following objections to the<br />

proposal:<br />

- Proposal fails to address or acknowledge the heritage assets in the park; particularly<br />

the Japanese Garden of Peace - design of pavilion should reflect Japanese culture <strong>and</strong><br />

architecture<br />

- Proposal would cause significant light <strong>and</strong> noise <strong>and</strong> would not enhance planned<br />

housing at the BBC site or give comfort to existing residents<br />

- Proposal would involve a significant loss of mature trees <strong>and</strong> open space;<br />

replacements for trees must be sought<br />

- Concern that facility would discharge water into the Thames Water Counter's Creek<br />

sewer system which is already under pressure<br />

- The design of the pavilion in addition to tall fences, floodlights, CCTV <strong>and</strong> acoustic<br />

barriers add up to a bleak <strong>and</strong> inhospitable environment<br />

- Uneasy segregation between park users <strong>and</strong> visitors to the facility - bar facilities <strong>and</strong><br />

parking are for PlayFootball clients only<br />

- Object to principle of any car parking within the boundaries of Hammersmith Park<br />

- PlayFootball's demographic (males aged 18-34) make up only 10 per cent of the local<br />

population<br />

- Terms of community use need to be determined before application is considered<br />

- Hours of use are inconsiderate; suggest they are reviewed after 6 months<br />

2.14 The Friends of Hammersmith Park have written in support of the proposal with the<br />

following comments:<br />

- Welcome the provision of a café, toilets <strong>and</strong> a community room which would facilitate<br />

use of the park<br />

- Would like further discussions about the interior detail of the pavilion which could<br />

feature pictures of the Japanese Garden in 1910, as well as the possibility of including a<br />

feature on the grass outside the building which could reflect the Japanese heritage; <strong>and</strong><br />

discussions on the tree planting<br />

- Would like to see a transparent process for access to the two free pitches to ensure all<br />

community users have fair access<br />

2.15 The White City Residents' Association responded with the following objections:<br />

- Reduction of access to open space, will be detrimental to health of local people<br />

- Sports other than football are not included; proposal would involve loss of tennis<br />

courts <strong>and</strong> bowling green which is used by older people<br />

- Noise from bar <strong>and</strong> from the pitches<br />

- Noise mitigation will not help reduce noise at upper floor flats<br />

- Will attract hundreds of people into peaceful park <strong>and</strong> hundreds of cars to the<br />

surrounding streets<br />

- Concern about traffic safety <strong>and</strong> strain on existing traffic junctions<br />

- South Africa Road is closed on QPR match days; will users therefore try <strong>and</strong><br />

park on the surrounding streets?<br />

- Object to loss of trees


- Large facility surrounded by 3m fencing cannot be seen as environmental<br />

improvement<br />

- Local people cannot afford to pay to use facility; proposed facility is therefore<br />

incongruous with locality<br />

- Demographic of the facility does not represent demographic of local area; will<br />

reinforce inequality, no benefit to local community<br />

- Other options for restoring the all-weather pitch that will not involve loss of a third<br />

of the park to public access<br />

- Consultation with local residents has been inadequate<br />

- Applicant has singled out some of the current users <strong>and</strong> offered them preferred<br />

status for the community pitches in return for their support in the planning process;<br />

others who have asked for binding agreements have not been given this preferred<br />

status.<br />

2.16 Andy Slaughter MP has written with the following objections:<br />

- Loss of 1/3 of Hammersmith Park's green space to open access; particularly given the<br />

lower than average acreage of green space in Hammersmith <strong>and</strong> Fulham<br />

- Loss of trees; replacements must be sought<br />

- Segregation of amenities between park users <strong>and</strong> Playfootball customers<br />

- Object to the creation of parking spaces on park l<strong>and</strong><br />

- Impact of noise, light <strong>and</strong> opening hours on neighbouring residents<br />

2.17 Councillors Wesley Harcourt, Colin Aherne, Mercy Umeh <strong>and</strong> Max Schmid have<br />

asked for the application to be heard by the <strong>Planning</strong> <strong>Applications</strong> Committee, due to<br />

the potential for noise <strong>and</strong> other issues affecting local residents.<br />

2.18 The White City Community Association <strong>and</strong> the White City Neighbourhood Forum<br />

were also notified of the proposals; but have not commented.<br />

2.19 Stanhope - The developers of the BBC TV Centre have written to say that<br />

PlayFootball have been working with them to address their concerns on the lighting <strong>and</strong><br />

noise impacts for the potential residents, <strong>and</strong> are pleased to see the commitment to<br />

defensive planting around the boundaries with their site. They request, though, that the<br />

hours of opening for the pitches should be limited to 9.30pm. PlayFootball have<br />

responded that this would not make their business model viable <strong>and</strong> could not support<br />

the opening hours for the pitches being limited to any earlier than 10pm. Hours of use<br />

are discussed in the report below.<br />

3.0 PLANNING CONSIDERATIONS<br />

3.1 The main planning issues are considered to be the acceptability of the proposal in<br />

l<strong>and</strong> use terms including the development on existing open space; the design <strong>and</strong><br />

appearance of the proposal (including impact on the park, the nature conservation area<br />

<strong>and</strong> the Wood Lane Conservation Area) <strong>and</strong> its relationship with the adjoining open<br />

space; the impact on the residential amenity of surrounding residents; the impact on<br />

traffic <strong>and</strong> parking; <strong>and</strong> environmental matters including energy <strong>and</strong> sustainability, flood<br />

risk, <strong>and</strong> the presence of contaminated l<strong>and</strong>.<br />

LAND USE AND OPEN SPACE<br />

3.2 The existing site is in use as a sports <strong>and</strong> leisure facility, comprising a floodlit allweather<br />

football/games pitch, a disused children's playground, a bowling green <strong>and</strong>


associated pavilion (disused <strong>and</strong> overgrown), a two-on-two basket ball court area <strong>and</strong><br />

three public tennis courts. There is also a single storey public convenience building <strong>and</strong><br />

a two storey changing room block on the site. However, the existing facilities are in a<br />

poor state of repair. The intention is that the Council would lease the l<strong>and</strong> to<br />

PlayFootball, who would undertake the provision <strong>and</strong> management of the sports<br />

facilities. Essentially, the proposal involves the replacement of the existing sports uses<br />

with new sports facilities, for which there would be a charge, whilst retaining two football<br />

pitches <strong>and</strong> a basketball pitch for free community use. The children's playground on the<br />

site has been disused for several years. A new playground was built in 2010 to the<br />

south of the site.<br />

3.3 As the use of the l<strong>and</strong> as a sports <strong>and</strong> recreation facility would not change, there<br />

are no planning objections to the proposal in l<strong>and</strong> use terms. With regard to open space<br />

provision, Core Strategy policy OS1 sets out the need to protect <strong>and</strong> enhance parks,<br />

open spaces <strong>and</strong> biodiversity in the borough by a range of means, including improving<br />

parks <strong>and</strong> recreational facilities through the Parks <strong>and</strong> Open Spaces Strategy, with<br />

scheduled major refurbishment complemented with investment in sports facilities across<br />

the borough. Policy DM E1 of the DM Local Plan seeks improvements to existing open<br />

space where appropriate <strong>and</strong> states that development should be refused on public open<br />

space <strong>and</strong> other green open space of borough-wide importance unless it can be<br />

demonstrated that such development would preserve or enhance its open character, its<br />

function as a sport, leisure or recreational resource, <strong>and</strong> its contribution to biodiversity<br />

<strong>and</strong> visual amenity. In this case, it is clear that the proposal would enhance the existing<br />

function of the open space as a sports facility. Although the development would involve<br />

the erection of a building of 270 sqm <strong>and</strong> the provision of fencing which would enclose<br />

the l<strong>and</strong>, there is existing fencing around the sports pitches <strong>and</strong> the proposal would<br />

involve the demolition of three buildings <strong>and</strong> a portacabin also totalling 270 sqm in floor<br />

area. The proposed development is necessary for the function <strong>and</strong> operation of the<br />

sports facility. As discussed further below, it is not considered that the development has<br />

further impact on the contribution of the space to biodiversity or visual amenity. As such,<br />

it is not considered that there is conflict with policies relating to open space.<br />

LOSS OF EXISTING FACILITIES<br />

3.4 The proposed facility is predominantly football based, with one basketball court in<br />

addition to the thirteen football pitches. In this respect, the alternative sports provision,<br />

such as the existing tennis courts <strong>and</strong> bowling green would be lost from the site. In<br />

support of the application, the applicants have stated that the bowling green is now<br />

completely overgrown since the club's relocation to Ravenscourt Park in 2011. The<br />

bowling green required significant public investment in its upkeep <strong>and</strong> it was considered<br />

the most cost effective solution to consolidate this facility within the Ravenscourt Park<br />

club to enable both clubs to continue operating. In terms of tennis, there are alternative<br />

facilities in Wormholt Park around 500m away (which are free to use) Ravenscourt Park<br />

(1.5km away) <strong>and</strong> Brook Green (2km away), for which there is a charge.<br />

3.5 A dem<strong>and</strong> survey has been carried out by the applicant which indicates that of<br />

the 361,670 people who live within a 2 mile radius of the site, approximately 10% are<br />

males aged 18-34 - a key market group for PlayFootball. As an indication of the scale of<br />

dem<strong>and</strong> from the local population, research from another PlayFootball site in Southend<br />

shows that around 20-25% of all 18 to 34 year-old males would be keen to participate in<br />

small-sided football on a regular basis. Therefore, it is estimated that there would be<br />

dem<strong>and</strong> from around 9,000 18 to 34 year-old males who live locally. However, this is<br />

not the only group that would be expected to take advantage of the facilities. The


applicants state that small-sided football is a popular <strong>and</strong> growing sport, <strong>and</strong> that<br />

participation by younger people, women <strong>and</strong> older males is also expected <strong>and</strong><br />

encouraged. There are no other purpose-built small-sided football facilities in the vicinity<br />

(except for limited facilities at Linford Christie Stadium) <strong>and</strong> it is expected that the<br />

proposed development could significantly improve <strong>and</strong> increase the local population's<br />

access to a high quality sports facility.<br />

COMMUNITY USE<br />

3.6 Although the existing facilities on the site are poor quality, it should be<br />

acknowledged that they are currently free to use, <strong>and</strong> the proposal would involve the<br />

replacement with a largely charged-for sports facility. However, it is also proposed that<br />

one five-a-side pitch <strong>and</strong> one of the 7-a-side pitches would be made permanently<br />

available for use by the local community, free of charge. The applicants have provided<br />

further information about the use of these pitches <strong>and</strong> how this will be organised, as<br />

follows:<br />

- The two free pitches would strictly be for use by local residents, including those who<br />

live in the White City Estate, <strong>and</strong> the teams/clubs/groups that are associated with the<br />

area.<br />

- A PlayFootball Community Forum would be created who would then decide which<br />

teams/clubs/groups use the pitches, <strong>and</strong> at what time. The forum would decide how<br />

these pitches are managed. Initially the forum would be made up by representatives of<br />

the key teams/clubs/groups who would use the free community pitches. It is likely that a<br />

representative from the following clubs would sit on the forum:<br />

- Al Answar FC<br />

- Kokhob FC<br />

- White City Youth Centre<br />

- AFC West London<br />

- West Eagles FC<br />

- West 12 FC<br />

- The free pitches would be booked by the teams/clubs/groups at the start of each<br />

calendar year for the next 12 months, giving the team/club/group a guaranteed time slot<br />

for the forthcoming 12 month period<br />

- PlayFootball would also allocate specific time slots which would not be bookable (free<br />

play sessions). These slots would be available to the residents of the White City Estate<br />

on a first come first serve basis. Once allocated, the pitch would be available for 1 hour.<br />

- The White City community would be offered the opportunity to register their details at<br />

the PlayFootball desk. Photo ID would be required. Once registered, the person would<br />

be issued with a PlayFootball Community Use card. This card must be shown to<br />

PlayFootball staff upon entry. They would then be allowed access to the free use<br />

pitches.<br />

- The Phoenix Secondary School, The Hammersmith Academy <strong>and</strong> William Morris 6th<br />

form would be entitled to free use of pitches in the times allocated during the normal<br />

school term time. As these slots have already been agreed, there would not be a formal<br />

booking process; however, the bookings would be recorded on the PlayFootball<br />

computerised booking system. All other local school would be offered a discount on


normal PlayFootball off peak prices. Bookings of this type would be made in the normal<br />

way.<br />

- The basketball area would be open access to anyone at any time that the park is<br />

open. This area would operate in the same way that the current hard courts are used.<br />

Therefore, there would not be a booking system for this area.<br />

- The pavilion would include changing rooms, bar/café, <strong>and</strong> toilets, which would be open<br />

access for all users of Hammersmith Park (not just PlayFootball customers).<br />

PlayFootball would manage this in accordance with their st<strong>and</strong>ard operating<br />

procedures, but the facilities would be permanently available to the public during the<br />

opening hours of the park (this would be secured in a legal agreement).<br />

3.7 The permanent provision of the free community pitches, along with a management<br />

plan including full details of the membership <strong>and</strong> operation of the proposed community<br />

forum, would be secured within a S106 agreement.<br />

DESIGN AND CONSERVATION<br />

3.8 The whole of the site is within the Wood Lane Conservation Area. Core Strategy<br />

Policy BE1 <strong>and</strong> Policy DMG7 of the Local Plan emphasise the need for new<br />

development to integrate successfully <strong>and</strong> sympathetically into the existing built<br />

environment, open space <strong>and</strong> historic environment, including the need to preserve <strong>and</strong><br />

enhance existing historic assets.<br />

3.9 Conservation Area Consent is required for the demolition of the three existing<br />

structures on the site. These buildings are poor quality, <strong>and</strong> have been heavily<br />

v<strong>and</strong>alised, leaving the existing pavilion open to the elements. As the buildings do not<br />

contribute positively to the character <strong>and</strong> appearance of the conservation area, there is<br />

no objection to their removal <strong>and</strong> thus to the granting of Conservation Area Consent.<br />

3.10 The only new building proposed would be a single storey pavilion, providing<br />

changing rooms, a bar <strong>and</strong> public toilets, which would be located towards the southwestern<br />

boundary of the site beyond the proposed car park. The building would be a<br />

simple brick-faced structure with a mono-pitched metal clad roof <strong>and</strong> black panelling<br />

details surrounding the entrances, windows, <strong>and</strong> the western side elevation. The<br />

building would incorporate PlayFootball's br<strong>and</strong>ing but the signage would be restrained<br />

<strong>and</strong> non-illuminated. Any additional signage would need separate advertisement<br />

consent. Whilst the proposed building would be relatively functional in appearance, its<br />

modest size <strong>and</strong> height would ensure that it would not detract from the character <strong>and</strong><br />

appearance of its surroundings. Three existing poor quality brick buildings (one of a<br />

similar size <strong>and</strong> in a similar location to the proposed building) would be removed from<br />

the site.<br />

3.11 The perimeter of the football pitches would be surrounded by 5m high fencing,<br />

including 2.5m of solid boards <strong>and</strong> 2.5m of mesh fencing above. On the front boundary<br />

with South Africa Road there would be a 3m mesh security fence. On the southern<br />

boundaries, a 3m-high timber acoustic fence with trellis for climbing plants would be<br />

erected outside the perimeter fencing. On the western boundary of the car park, where<br />

it meets the park, 1.8m high metal railings would be erected. The scheme would also<br />

provide 36 lighting columns, each 8m in height.


3.12 It is noted that the existing site which fronts on to South Africa Road is already<br />

surrounded by 4m-high mesh fencing <strong>and</strong> 12 floodlighting columns which are 8m in<br />

height. Parts of the existing fencing are in poor repair with breaks having been made to<br />

gain access into the facilities. Therefore, whilst the appearance of this piece of l<strong>and</strong><br />

would change, it is not considered that the character of the area, which is already used<br />

as fenced sports pitches, would be significantly altered, <strong>and</strong> the appearance of the site<br />

would be improved.<br />

3.13 Comments have been received relating to the relationship of the site with the<br />

rest of Hammersmith Park, <strong>and</strong> saying that the proposed development fails to be in<br />

keeping with the Japanese Garden of Peace. However, it is considered that like many<br />

public parks, Hammersmith Park has distinct areas: here there is the l<strong>and</strong> used for<br />

formalised sports pitches, <strong>and</strong> there is also the l<strong>and</strong>scaped part of the park which is<br />

valued for its visual amenity <strong>and</strong> used for less formal leisure <strong>and</strong> recreation. As detailed<br />

above, there is no objection in l<strong>and</strong> use terms to the replacement of the existing sports<br />

facilities with a similar use. The two parts of the park are visually <strong>and</strong> functionally<br />

distinct, <strong>and</strong> since the proposed pavilion relates to the sports pitches it is not considered<br />

that there is a need or desire for it to respond architecturally to the Japanese garden.<br />

The interior of the building could reflect the history of the site, such as incorporating<br />

photographs of the Japanese garden <strong>and</strong>/or the 1910 exhibition. Details of this would be<br />

conditioned (Condition 35).<br />

3.14 It is therefore considered that the proposals are satisfactory in terms of design<br />

<strong>and</strong> would not detrimentally impact on the existing character <strong>and</strong> appearance of the<br />

park or the wider conservation area. The proposals are therefore considered to comply<br />

with Policies BE1 <strong>and</strong> DMG7.<br />

3.15 Hammersmith Park is designated as a nature conservation area, although this<br />

designation does not extend to the existing sports pitches at South Africa Road.<br />

However, a small part of the application site (110 sqm on the south western boundary)<br />

falls within the nature conservation area. Policy DM E3 of the Local Plan states that<br />

nature conservation areas will be protected from development which is likely to cause<br />

demonstrable harm to their ecological (species <strong>and</strong> habitats) value. In addition, Policy<br />

DM E1 states that developments should be refused which have an adverse impact on<br />

biodiversity. In this instance, the part of the site which is designated as part of the<br />

nature conservation area is a grassy piece of l<strong>and</strong> behind the existing changing room<br />

block, with two Cherry trees. As part of the applicant's submission, an Arboricultural<br />

survey has been undertaken, assessing the health <strong>and</strong> quality of the trees on the site.<br />

The two Cherry trees are assessed as Category 'U' (sometimes known as Category 'R'),<br />

which means that they are poor quality specimens with a life span of less than 10 years.<br />

Whilst these trees are proposed to be removed, they are likely to die or require removal<br />

in the next ten years, <strong>and</strong> as part of the proposal they would be replaced with new trees<br />

(see further below).<br />

3.16 The applicants have also submitted information about the effect of the<br />

development on protected species, <strong>and</strong> especially the impact of the proposed<br />

floodlighting on bats. It should be noted that the existing site has floodlighting around<br />

the main sports pitch, although it is acknowledged that the extent of the lighting would<br />

be increased. Floodlighting has the effect of deterring some light avoiding bat species<br />

such as Barbastelle <strong>and</strong> Greater <strong>and</strong> Lesser Horseshoe bats, but other species (such<br />

as Pipistrelle bats) would be attracted due to the fact that insects are attracted to the<br />

lights. Due to the urban location, the species most likely to occur here would be the


Pipistrelle species, which are one of the species shown to be attracted to lit areas.<br />

However, the lighting proposals would be designed to direct lights downwards at an<br />

angle of less than 75 degrees in accordance with general guidance (the lights would be<br />

pitched downwards at 65 degrees), <strong>and</strong> would be fitted on masts no higher than 8m,<br />

which is below the height that most species fly. It would be a condition of any approval<br />

(Condition 34) that a survey of bat roosting habitats on <strong>and</strong> surrounding the site is<br />

submitted prior to development, which would inform a further review of the impact on<br />

bats <strong>and</strong> a mitigation strategy if necessary. Therefore, it is not considered that the<br />

development on the nature conservation area would cause demonstrable harm to its<br />

ecological value or to biodiversity, in accordance with Policies DM E1 <strong>and</strong> DM E3.<br />

3.17 The proposal would involve the removal of 24 trees <strong>and</strong> 5 grouped trees/shrubs,<br />

including the two Cherry trees mentioned above. The removal of trees would be<br />

necessary in order to redevelop the site. Twenty trees on the site would be retained. Of<br />

the trees proposed to be removed, none are classified as the highest category i.e.<br />

Category 'A' trees (all 11 category A trees would be retained); 2 are classified as<br />

Category 'B' (7 of the 9 Category B trees would be retained); 15 are Category C, plus<br />

the 5 groups which are also Category C (3 Category C trees would be retained); <strong>and</strong> all<br />

7 Category 'U' trees would be removed. Officers acknowledge that the trees proposed<br />

to be removed are generally not high quality specimens, with the exception of the large<br />

(17m) healthy Sycamore tree on the southern boundary with the park (a Category 'B'<br />

tree). The other category B tree is on the same boundary <strong>and</strong> is a smaller Sycamore<br />

(14m). The large street trees which have a significant amount of visual amenity <strong>and</strong><br />

screen views of the site from South Africa Road would all be retained. It is also<br />

acknowledged that the removal of the trees would be necessary to enable development<br />

to take place. Nevertheless, the loss of a large number of trees is regrettable, <strong>and</strong> it is<br />

considered that the proposal would only be acceptable if an equivalent number of trees,<br />

of at least equal if not higher potential quality, are replaced. The replacement trees<br />

should be planted near to the boundaries of the site, or further into the park (with the<br />

agreement of the Council's Parks department <strong>and</strong> the Friends of Hammersmith Park)<br />

should it not be possible to plant all the replacements on the boundaries. A condition<br />

(Condition 6) would be attached to any planning approval, requiring a replacement tree<br />

planting schedule, detailing the number, species, size <strong>and</strong> location of the replacement<br />

trees, <strong>and</strong> funding for the replacement tree planting will be secured via the S106<br />

agreement.<br />

IMPACT ON THE AMENITIES OF RESIDENTS<br />

3.18 The development has the potential to impact on the amenities of nearby residents<br />

living in flats to the north west, south west <strong>and</strong> east of the proposed development, <strong>and</strong><br />

on the potential occupiers of the proposed residential redevelopment of the BBC<br />

Television Centre to the south (if consent were to be approved in the future). The<br />

potential impacts could be pollution from noise <strong>and</strong> light, as the proposed built<br />

development is not of a scale or nature to cause loss of amenity in terms of loss of light,<br />

privacy or outlook for neighbours. The potential for traffic noise <strong>and</strong> comings <strong>and</strong> goings<br />

from the site <strong>and</strong> the pavilion should also be considered.<br />

Lighting<br />

3.19 The proposal would incorporate floodlighting around the whole of the site.<br />

Currently, only the sports pitch is surrounded by floodlights <strong>and</strong> the lighting columns<br />

would be increased in number. Policy DM H10 of the Local Plan states that 'the<br />

potential adverse impacts from lighting arrangements will be controlled by requiring all<br />

developments that include proposals for external lighting to submit details showing that


it is appropriate for the intended use; provides the minimum amount of light necessary<br />

to achieve its purpose; is energy efficient; <strong>and</strong> provides adequate protection from glare<br />

<strong>and</strong> light spill, particularly to nearby sensitive receptors such as residential properties.'<br />

To establish the reasonable limits for the creation of any further light pollution in relation<br />

to neighbouring residential properties, the Council is guided by the Institute of Lighting<br />

Professional's 'Guidance Notes for the Reduction of Obtrusive Light GN01:2011' which<br />

recommends that in suburban areas, the maximum light intrusion into windows should<br />

be 10 lux 'pre-curfew' (generally understood to be 11pm) <strong>and</strong> 1 lux post curfew.<br />

3.20 In support of their application, the applicants have submitted a lighting report with<br />

modelling diagrams of the light spillage. The pitch lighting has been designed to comply<br />

with the Sport Engl<strong>and</strong> <strong>and</strong> FA requirements for training <strong>and</strong> small sided football which<br />

require community pitches to be lit to 120lux.<br />

3.21 Modelling of the lighting proposals, without mitigation methods, shows that the<br />

light spillage reaching the nearest residential facades would be below 10 lux in all cases<br />

apart from on the flank wall of 80-90 White City Close where illuminance would reach 10<br />

to 15 lux. However, this wall does not contain windows to habitable rooms - there is one<br />

small bathroom window on this wall to each floor level. With regard to the other<br />

surrounding residential properties, illumination reaching Batman Close <strong>and</strong> Baird House<br />

would be less than 1 lux, the rear elevation of the redeveloped BBC TV Centre would be<br />

illuminated by 1 to 5 lux <strong>and</strong> the rear elevation of 80-90 White City Close would be<br />

illuminated by 1 to 10 lux. It is therefore considered that the impact of the lighting on<br />

neighbouring properties would be acceptable in the pre-curfew hours, but additionally,<br />

rear shields <strong>and</strong> louvres can be fitted to the rear of the lights to further reduce light<br />

spillage, <strong>and</strong> it is the applicant's intention that this is done. It should also be noted that<br />

the modelling of the lighting is based on a 'worst case' scenario of all the lights being on<br />

at once, but the applicants have confirmed that each pitch would have individual lighting<br />

controls <strong>and</strong> that if a pitch is not being used, the lights would be switched off. This would<br />

be a condition of any planning approval (Condition 15). It would also be a condition<br />

(Condition 16) that shields would be fitted to all lights on the perimeter of the site to<br />

further reduce light spillage as much as possible, <strong>and</strong> that a post-development light<br />

spillage survey is carried out to ensure that illumination of neighbouring facades<br />

complies with the recommended st<strong>and</strong>ards <strong>and</strong> are further reduced as far as possible.<br />

The hours of use of the pitches would be restricted by planning condition (Condition 30)<br />

. No use would be allowable after 10pm (9pm on Sundays), <strong>and</strong> all floodlights must be<br />

switched off by 22.15 (21.15 on Sundays). Details of the car park lighting would be<br />

required as part of Condition 13 to ensure that illuminance of this area is suitable <strong>and</strong><br />

does not cause light pollution to neighbours.<br />

3.22 It is therefore considered that subject to conditions, the proposals would not have<br />

an unreasonable impact on the amenities of neighbouring properties in terms of light<br />

pollution <strong>and</strong> that the proposal is thus compliant with Policy DM H8 of the DM Local<br />

Plan.<br />

Noise <strong>and</strong> disturbance<br />

3.23 Whilst it should be noted that the site already provides sports pitches that are<br />

floodlit <strong>and</strong> thus available for evening use, the proposed development would be<br />

expected to intensify this use <strong>and</strong> could therefore lead to further noise from the playing<br />

of football matches. Such noise can be difficult to quantify as it depends on how many<br />

pitches are in use at one time, <strong>and</strong> to some extent the behaviour of the players<br />

themselves. However, using data from an existing PlayFootball facility in Swansea, the


applicants have established that the noise produced by five-a-side pitches was an<br />

average of 59-63 dB LAeq, measured 11m from the edge of the pitch (a similar distance<br />

as that of the nearest residential properties in this proposal). Existing background noise<br />

levels were measured at 47-59 dB LAeq at the three residential facades surrounding the<br />

site at around 10pm.<br />

3.24 British St<strong>and</strong>ard 8233: 1999, `Code of practice for sound insulation <strong>and</strong> noise<br />

reduction for buildings' makes recommendations for external noise levels in residential<br />

properties, <strong>and</strong> the Council is guided by this. Section 7.6.1.2 states: 'In gardens <strong>and</strong><br />

balconies etc. it is desirable that the steady noise level does not exceed 50 dB LAeq,T<br />

<strong>and</strong> 55 dB LAeq,T should be regarded as the upper limit'. Although the existing<br />

background noise levels are above these values in some instances, it is acknowledged<br />

that the use of the football pitches is likely to increase the noise levels further. In this<br />

respect, noise mitigation measures are also proposed.<br />

3.25 An acoustic screen (a solid, 3m high timber screen) would be erected around<br />

the south-eastern part of the site where it adjoins the boundaries with residential<br />

properties. It is also recommended, by the noise consultant employed by the applicant,<br />

that the rebound boards are fixed to blockwork walls of the same height. Previous<br />

investigative work undertaken for Play Football Ltd has demonstrated that this can<br />

reduce LAmax noise levels from the impact of balls on the rebound boards by greater<br />

than 10dB, as compared to the st<strong>and</strong>ard rebound boards (which were in use during the<br />

noise level survey of the existing facility). This would also help to reduce the LAeq noise<br />

level, as the rebound board noise is a significant component of the total noise level.<br />

Above the rebound boards, the dividers between pitches would be a mesh netting rather<br />

than a harder material, so that a ball would not make a noise when it hit this surface.<br />

Although it is difficult to predict the exact noise reduction due to the variable <strong>and</strong> mobile<br />

noise sources associated with football pitches, the noise mitigation measures could be<br />

expected to reduce the overall noise levels by 10dB on average, particularly at lower<br />

floor levels. The effect of the acoustic screening would be reduced for dwellings at<br />

upper floor levels, but the impact of noise is also reduced due to the increasing distance<br />

from the noise source. It is unlikely, in these cases, that the noise would regularly be<br />

significantly greater than the existing recorded background noise levels, <strong>and</strong> the use of<br />

the pitches would cease at 10pm. Therefore, it is expected that the noise produced by<br />

the facility would be within the recommended British St<strong>and</strong>ard guidelines.<br />

3.26 Officers have assessed the applicant's noise survey <strong>and</strong> noise mitigation<br />

measures, <strong>and</strong> concur with their findings. Having regard to the existing site's<br />

circumstances, it is considered that the noise impacts, with the proposed mitigation,<br />

would be reasonable in relation to nearby residential properties. The implementation of<br />

the recommended noise mitigation measures, along with a post installation noise<br />

survey, would be a condition of any planning approval (Conditions 17 <strong>and</strong> 19). It should<br />

also be noted that any disturbance caused by the use of the pitches would be limited to<br />

the opening hours of the facility <strong>and</strong> there would not be disturbance late at night.<br />

Officers consider that it would be reasonable to limit the hours of operation from 9am-<br />

10pm Mondays-Saturdays <strong>and</strong> 9am-9pm on Sundays, <strong>and</strong> this would be a condition of<br />

the approval (Condition 30).<br />

3.27 The PlayFootball facility would also include a clubhouse <strong>and</strong> bar. This is intended<br />

for use by players using the facility to relax <strong>and</strong> socialise together after their match. The<br />

floorplan shows that the bar would have 16 tables <strong>and</strong> 64 chairs. The clubhouse would<br />

be located approximately 35m from the nearest residential neighbouring properties. It


was proposed by the applicant that the facility would open until 11pm on Sundays to<br />

Thursdays <strong>and</strong> until midnight on Fridays <strong>and</strong> Saturdays. However, officers consider that<br />

a midnight opening for a bar within the park is not appropriate <strong>and</strong> the closing hours for<br />

the pavilion have been amended to 11pm on Mondays-Saturdays, <strong>and</strong> 10pm on<br />

Sundays; <strong>and</strong> for the bar no customers shall be on the premises after 11pm (10pm on<br />

Sundays). These hours would be conditioned (Conditions 31 <strong>and</strong> 32). It is noted that a<br />

nearby public house on South Africa Road, the 'Springbok', has a licence to open until<br />

2am <strong>and</strong> is immediately adjacent to residential properties. Although the proposed facility<br />

in this instance is relatively small <strong>and</strong> is separated from the nearest residential<br />

properties by some distance, given the bar's location within the park boundaries, it is<br />

considered that later opening hours would have the potential for the creation of further<br />

noise <strong>and</strong> disturbance. It is therefore considered that the conditioned hours are<br />

appropriate for this facility. Given the limited number of parking spaces <strong>and</strong> that most<br />

people would be expected to walk or cycle to the new facilities, but at staggered times, it<br />

is not considered that comings <strong>and</strong> goings would result in unacceptable noise<br />

conditions for residents.<br />

3.28 Subject to the above conditions, it is considered that a reasonable environment for<br />

the occupiers of neighbouring properties would be preserved in terms of noise, <strong>and</strong> the<br />

development would thus comply with Policy DM H9 of the Local Plan.<br />

HIGHWAYS MATTERS<br />

3.29 The proposal would involve the creation of a car park with 20 spaces for use by<br />

staff <strong>and</strong> visitors (Five full time staff are proposed). The site is within Controlled Parking<br />

Zone O, which operates restricted parking Monday to Saturday 9:00am to 5:00pm. The<br />

site has a public transport accessibility level of 6a using Transport for London's<br />

methodology, indicating that it is extremely accessible by public transport.<br />

3.30 Pedestrian access to the football facility would be via a new pedestrian gate <strong>and</strong><br />

access way off South Africa Road in the western corner of the site <strong>and</strong> via a pedestrian<br />

entrance from Hammersmith Park on the south-western boundary of the site. These are<br />

considered adequate for the proposed use. It would be envisaged, given the proximity<br />

to transport routes <strong>and</strong> the surrounding housing estates, that the majority of people<br />

would access the site from South Africa Road rather than though the park.<br />

3.31 There is currently one vehicle crossover serving the site, which would become<br />

redundant. A new 5.5m wide vehicle crossover is proposed between the existing<br />

crossover <strong>and</strong> a pedestrian refuge isl<strong>and</strong>. This would allow vehicles to enter <strong>and</strong> exit the<br />

site simultaneously <strong>and</strong> would reduce the possibility of vehicles queuing on the public<br />

highway. The redundant crossover would need to be reinstated to footway <strong>and</strong> the<br />

proposed crossover constructed to Streetsmart st<strong>and</strong>ards. This development, along with<br />

associated works such as the relocation of lamp columns, other street furniture <strong>and</strong><br />

relocation of the pedestrian refuge isl<strong>and</strong>, would be undertaken by the Council's<br />

contractors <strong>and</strong> funded by the applicant, <strong>and</strong> this funding would be secured within the<br />

S106 agreement.<br />

Traffic Generation<br />

3.31 The Transport Statement submitted includes an estimate of traffic the proposal is<br />

likely to generate based on the TRICS database. This database's outputs are multimodal<br />

<strong>and</strong> indicate person trips. However, due to the high PTAL of the site <strong>and</strong> the fact<br />

that it is likely a high proportion of visitors to the facility during the evening would be<br />

linked-trips (eg people on their way home from work), census data for the surrounding


area has been used to indicate a car driver mode share of 10.6%. This approach is<br />

considered acceptable <strong>and</strong> the weekday <strong>and</strong> Saturday peak hour traffic generated is set<br />

out below:<br />

Car Driver Traffic Generation (two way trips):<br />

Weekday Peak Saturday Peak<br />

20:00 - 21:00 11:00 - 12:00<br />

Proposed Use 24 23<br />

3.32 A draft travel plan has been submitted with the application which is aimed at<br />

reducing the reliance on car use by staff <strong>and</strong> visitors. The travel plan is considered<br />

acceptable <strong>and</strong> as part of the S106 agreement it would be a requirement to review <strong>and</strong><br />

monitor this plan.<br />

Car Parking<br />

3.33 Twenty car parking spaces, including two car parking spaces of sufficient size to<br />

be for use by disabled people, are proposed. The London Plan gives no specific<br />

guidance on parking provision for sporting facilities. However, given the above<br />

estimation of the likely vehicle trips, the proposed provision is considered to be an<br />

acceptable level of parking for the proposed facility in this highly accessible area. It<br />

would also ensure that residents on-street parking would not be unduly affected.<br />

3.34 South Africa Road is subject to closures during QPR home matches. The road is<br />

closed up to two hours before match kick off <strong>and</strong> up to an hour after final whistle, but is<br />

reopened during the match. For information, there are 25 home fixtures in the coming<br />

season. The applicants are aware of this <strong>and</strong> would notify members of the facility in<br />

advance, advising them to make alternative arrangements to arrive at the site other than<br />

driving. The notification arrangements would be detailed in the travel plan, to be<br />

submitted as part of the S106 agreement.<br />

Cycle Parking<br />

3.35 Racks for the parking of 24 bicycles would be provided within the car park (this<br />

provision would be secured under Condition 9. This complies with the cycle parking<br />

st<strong>and</strong>ard in the London Plan 2011, which requires 1 space per 10 staff <strong>and</strong> 1 per 10<br />

visitors (the highest number of visitors expected at the facility, in the weekday peak, is<br />

230 <strong>and</strong> 5 full-time equivalent employees are proposed, equating to 24 spaces).<br />

Servicing <strong>and</strong> refuse<br />

3.36 Servicing for the facility would entail one delivery every two days, by a small van<br />

consisting of stock items such as snacks <strong>and</strong> refreshments <strong>and</strong> service consumables<br />

such as cleaning products. This would be able to be accommodated on site.<br />

3.37 Refuse collection is proposed to take place on street due to site constraints. There<br />

is no-waiting at any time on South Africa Road outside the site, but there are no loading<br />

restrictions. It is considered that this would be able to be undertaken safely <strong>and</strong> without<br />

affecting network performance provided that it takes place to the north-east of the<br />

proposed entrance. The carriageway is wide <strong>and</strong> includes a hatched central median.<br />

Storage of refuse <strong>and</strong> recycling would be within the site, in an enclosure adjacent to the<br />

pavilion building which has the capacity to store 3-4 1100L Eurobins. This is considered<br />

to be sufficient storage for this use. Full details of the refuse <strong>and</strong> recycling storage <strong>and</strong>


collection arrangements, including the location of collections, would be required to be<br />

submitted <strong>and</strong> approved by condition (Condition 8)<br />

3.38 It is considered that the development, subject to conditions <strong>and</strong> the completion of<br />

a satisfactory legal agreement, would be acceptable in terms of its impact on the<br />

highway network <strong>and</strong> local parking conditions, in accordance with Policies T1 of the<br />

Core Strategy <strong>and</strong> Policies DM J1 <strong>and</strong> DM J2 of the Local Plan.<br />

ACCESSIBILITY<br />

3.39 London Plan Policy 7.2 <strong>and</strong> Design Policies 1, 2, 3 <strong>and</strong> 8 of the Council's <strong>Planning</strong><br />

Guidance SPD are both relevant <strong>and</strong> require developments to be fully inclusive <strong>and</strong><br />

accessible. The <strong>Planning</strong> Guidance SPD sets out specific requirements to enable ease<br />

of access both to <strong>and</strong> within developments.<br />

3.40 The application is accompanied by a Design <strong>and</strong> Access Statement which states<br />

that the facility would be fully inclusive. Measures would be taken to ensure that level<br />

access around the site <strong>and</strong> at entrances to the buildings is provided, <strong>and</strong> there would be<br />

an accessible WC <strong>and</strong> changing rooms.<br />

3.41 It is considered that the proposed development would ensure ease of access for<br />

all users, but a condition is recommended to ensure that the development is constructed<br />

according to these relevant criteria (Condition 23)<br />

SECURED BY DESIGN<br />

3.42 The site will be secured with a gate to the vehicle entrance on South Africa Road<br />

<strong>and</strong> a gate to the side giving access into the rest of the park for use during the day. The<br />

side gate would be locked when the park closes at dusk (the existing park entrance on<br />

to South Africa Road would remain unaffected by the development), so that when the<br />

park is closed the only access to the PlayFootball site is through the site's entrance<br />

from South Africa Road. Therefore, there would be no access into the park after hours.<br />

It is considered that the development would be secure, <strong>and</strong> would not give rise to<br />

security concerns or anti social behaviour in Hammersmith Park. The implementation of<br />

secured by design measures, including details of the entrance gates, will be required by<br />

condition (Condition 10).<br />

ENVIRONMENTAL MATTERS<br />

Energy <strong>and</strong> Sustainability<br />

3.43 Although this is not a major application, the applicants have provided information<br />

on proposed measures to reduce carbon emissions <strong>and</strong> ensure a sustainable<br />

development. Energy efficient lighting is to be used for flood lighting <strong>and</strong> energy<br />

efficiency measures will be integrated into the pavilion building: all windows face north<br />

east or north west, which limits solar gain <strong>and</strong> should remove the need for cooling, the<br />

proposed U values of the various elements of the building, exceed the requirements of<br />

the Building Regulations by approximately 10%. A good st<strong>and</strong>ard of air-tightness is<br />

proposed (5 - 6 ach). Wherever practically possible sustainable materials <strong>and</strong><br />

construction methods will be used <strong>and</strong> all methods will comply with building control<br />

regulation on sustainability <strong>and</strong> design. A condition (Condition 36) will be attached to<br />

require final details of the sustainable design <strong>and</strong> construction <strong>and</strong> energy efficiency<br />

measures to be implemented, to ensure that the development is sustainable, in<br />

accordance with DM Local Plan policies DM H1 <strong>and</strong> DM H2.<br />

Flood Risk <strong>and</strong> Sustainable Urban Drainage


3.44 A Flood Risk Assessment (FRA) has been submitted with the application. The site<br />

is in the Environment Agency's Flood Zone 1. This indicates a low risk of flooding from<br />

the Thames. The Environment Agency has not raised an objection to the proposal. The<br />

impact on surface water flooding has been considered. The area of the site covered in<br />

tarmac/concrete would be reduced by 2300m2 (around 50%), with the majority of the<br />

hard surfaces being replaced with astroturf, to be laid on a permeable base which will<br />

allow surface water to infiltrate. This would help control surface water run-off at the site.<br />

The FRA states that the post development surface water discharge rates will be<br />

maintained at pre-development levels, discharging to the Thames Water combined<br />

sewer system. Thames Water have confirmed that they have no objection to the<br />

proposal with regard to water infrastructure.<br />

3.45 To ensure compliance with the Council's DM Local Plan Policy DM H3 on<br />

controlling flood risk, <strong>and</strong> the London Plan Policies 5.12 <strong>and</strong> 5.13, a condition will be<br />

attached requiring a sustainable urban drainage strategy to be submitted prior to the<br />

commencement of the development (Condition 11)<br />

Contamination<br />

3.46 Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. Conditions are therefore recommended to ensure that no<br />

unacceptable risks are caused to humans, controlled waters or the wider environment<br />

during <strong>and</strong> following the development works, in accordance with Policy CC4 of the Core<br />

Strategy <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the Development Management Local Plan<br />

2013, <strong>and</strong> policy 5.21 of The London Plan 2011 (Conditions 24-29).<br />

PLANNING OBLIGATIONS<br />

Community Infrastructure Levy (CIL)<br />

3.47 Mayoral CIL came into effect in April 2012 <strong>and</strong> is a material consideration to<br />

which regard must be had when determining this planning application. CIL Regulations<br />

(2010) state that in dealing with planning applications, local planning authorities<br />

consider each on its merits <strong>and</strong> reach a decision based on whether the application<br />

accords with the relevant development plan, unless material considerations indicate<br />

otherwise. This development will be liable for Mayoral CIL charged at £50/psqm for the<br />

new building.<br />

Legal Agreement<br />

3.48 The development shall be subject to a S106 legal agreement securing the<br />

following items:<br />

- Funding of all works related to entrance arrangements on South Africa Road<br />

- Submission of a Travel Plan <strong>and</strong> a contribution for monitoring of £3k<br />

- Funding of replacement tree planting in accordance with a tree replacement plan, to<br />

be agreed.<br />

- Permanent provision of two football pitches <strong>and</strong> the basketball pitch for free<br />

community use, <strong>and</strong> submission of a management plan detailing the terms of use of<br />

the free pitches.<br />

- Permanent public access to the pavilion during park opening hours<br />

3.49 To ensure that successors in title to the council, which is the present owner of<br />

the site, will be bound by the planning obligation a condition (no. 33) currently relates.


4.0 CONCLUSIONS <strong>and</strong> RECOMMENDATION<br />

4.1 It is considered that the proposed development is acceptable in l<strong>and</strong> use terms<br />

<strong>and</strong> is consistent with the Council's policies on open space. The proposal would provide<br />

for a significant upgrade in sports facilities, with some facilities available to the local<br />

community free of charge, <strong>and</strong> park users able to make use of the cafe <strong>and</strong> public<br />

conveniences during park hours. There would not be further harmful impact on the<br />

conservation area or the nature conservation area. Subject to conditions, the impact on<br />

the amenities of neighbouring residents is considered to be acceptable. There would not<br />

be a detrimental impact on the operation of the highway or on local parking conditions.<br />

The development would be accessible, sustainable, <strong>and</strong> subject to conditions it would<br />

not have a further impact on flood risk.<br />

4.2 It is thereby recommended that planning permission be granted subject to<br />

conditions <strong>and</strong> a legal agreement; <strong>and</strong> that conservation area consent be granted<br />

subject to conditions above.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Shepherd's Bush Green<br />

Site Address:<br />

Hammersmith Park South Africa Road London<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/01085/CAC<br />

Date Valid:<br />

04.04.2013<br />

Case Officer:<br />

Katherine Wood<br />

Conservation Area:<br />

Wood Lane Conservation Area - Number 42<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

Mr S Bennett<br />

C/o The Sports & Leisure Group Ltd 442 Wilford Lane West Bridgford Nottingham<br />

Notts<br />

NG2 7RN<br />

Description:<br />

Demolition of existing bowling pavilion, changing rooms, storage building <strong>and</strong> portacabin;<br />

Creation of an all-weather football facility comprising of 2no. seven-a-side<br />

pitches, 11no. five-a-side pitches <strong>and</strong> a two-on-two basketball training court to replace<br />

an existing all weather pitch, tennis <strong>and</strong> basketball courts, bowling green <strong>and</strong> disused<br />

playground; Erection of a single storey pavilion containing a bar, community multi-use<br />

room, changing rooms <strong>and</strong> office; Fencing around <strong>and</strong> within the site; Lighting columns;<br />

Hard <strong>and</strong> soft l<strong>and</strong>scaping; Associated car parking providing 20no. spaces.<br />

Drg Nos: (08)002 Rev A00; (08)003 Rev A00; (08)004 Rev A00;(08)005 Rev A00;<br />

(08)006 Rev A00; (08)007 Rev A00;(08)008 Rev A00; (08)009 Rev A00; (08)010 Rev<br />

A00;(08)011 Rev A00; (08)012 Rev A00; (08)013 Rev A00;<br />

Application Type:<br />

Conservation Area Consent<br />

Officer Recommendation:<br />

That the application be approved subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) Unless otherwise agreed in writing by the Council, the demolition of the buildings<br />

hereby permitted shall not be undertaken before:<br />

(i) a building contract for the redevelopment of the site in accordance with<br />

planning permission reference 2013/01084/FUL has been entered into, <strong>and</strong>;<br />

(ii) notice of demolition in writing <strong>and</strong> a copy of the building contract has been<br />

submitted to the Council.<br />

To ensure that the demolition does not take place prematurely <strong>and</strong> to safeguard<br />

the character <strong>and</strong> appearance of the conservation area, in accordance with<br />

Policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan 2013.<br />

3) The demolition hereby permitted shall be undertaken before a scheme for<br />

temporary fencing <strong>and</strong>/or enclosure of the site has been submitted to <strong>and</strong><br />

approved in writing by the Council, <strong>and</strong> such enclosure has been erected in<br />

accordance with the approved details <strong>and</strong> retained for the duration of the building<br />

works.


To ensure that the site remains in a tidy condition <strong>and</strong> to prevent harm to the street<br />

scene, in accordance with policies DM G1 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan 2013.<br />

Justification for Approving the Application:<br />

1) The proposed demolition is considered to be acceptable on the basis that planning<br />

permission exists for a satisfactory redevelopment scheme. Accordingly, it is not<br />

considered that the demolition would have an unacceptable impact on the<br />

character or appearance of the conservation area, in accordance with Policy DM<br />

G7 of the DM LP 2013 <strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 15th March 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

Dated:<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

Football Services Division The FA Group Wembley Stadium,<br />

Wembley, HA9 0WS 10.05.13<br />

2 Lisgar Terrace W14 8SL 04.06.13<br />

14 Goldhawk Road W12 8DH 04.06.13<br />

20 Flat 3 Sycamore Gardens W6 0AP 04.06.13<br />

40 Flat C Stamford Brook Road W6 04.06.13<br />

27 Hasting House White City London W12 7PY 29.04.13<br />

27 Hasting House White City London W12 7PY 25.04.13<br />

West 12 FC Lime Grove Shepherds Bush W12 8EE 03.05.13<br />

Cocoon House Market Approach, Off Lime Grove Shepherds Bush<br />

W12 8EE 03.05.13<br />

Eritrean Community Lime Grove Shepherds Bush W12 8EE 03.05.13<br />

William Morris Sixth Form St Dunstan's Road London W6 8RB 03.05.13<br />

25 Cathnor Road Hammersmith London W12 9RD 03.05.13<br />

25 Cathnor Road Hammersmith London W12 9JD 03.05.13<br />

A N G 07.05.13<br />

90 Frithville Gardens London W12 7JW 07.06.13<br />

Australia Road 21.06.13<br />

187 Freston Road London W10 6TH 03.05.13


4 Wolfe House Australia Road White City Estate W12 7PX 04.06.13<br />

9 Simspsons Drive London W3 6YR 25.04.13<br />

28 Ormiston shepherd's bush W12 0JT 01.06.13<br />

Phoenix High School The Curve Shepherds Bush W12 0RQ 29.04.13<br />

Phoenix High School The Curve Shepherds Bush W12 0RQ 29.04.13<br />

Cocoon House Market App Lime Grove W12 8EE 04.06.13<br />

55 Thorpebank Road Shepherds Bush W12 0PG 04.06.13<br />

10 Mackay House White City Estate 04.06.13<br />

75 Champlain House W12 7QN 04.06.13<br />

74 Blaxl<strong>and</strong> House Australia Road White City Estate W12 7NH 04.06.13<br />

17 Creighton Close White City W12 04.06.13<br />

W12 7QP 04.06.13<br />

2 Champlain House W12 7QN 04.06.13<br />

59 Bryony Road London W12 0SP 04.06.13<br />

24 W12 7AT 04.06.13<br />

50 Denham House W12 7PE 04.06.13<br />

1 Hanover Court Uxbridge Road W12 9EP 04.06.13<br />

10 Brisbone House W12 7AF 04.06.13<br />

9 Phipps House White City Estate W12 7QE 04.06.13<br />

95 Bloemfontein Road W12 7DA 04.06.13<br />

22 Champlain House White City W12 7QN 04.06.13<br />

43 Mackay House White City W12 7PB 04.06.13<br />

46 Mackay House White City Estate W12 7PB 04.06.13<br />

22 Canning House W12 7QU 04.06.13<br />

A N G 03.05.13<br />

Nile Valley Comm Ctre Annex House Shepherds Bush W12 8EE 07.05.13<br />

69 Ellanborough House W12 7NB 04.06.13<br />

4 Mitchell House White City W12 7PF 04.06.13<br />

A.N.G 25.04.13<br />

34 Cornwallis House, India Way London W12 QT 30.05.13<br />

135 Poynter House Queensdale Crescent W11 4td 04.06.13<br />

Flat 3 Culross House Bridge Close W10 6TW 04.06.13<br />

39A LETCHFORD GARDENS Nw10 6ad 04.06.13<br />

6 Blaxl<strong>and</strong> House White City W12 7NH 04.06.13<br />

61 Court Way W3 04.06.13<br />

77 Abbey Gardens W6 8QR 04.06.13<br />

13 Campbell House Australia Road White City Estate W12 7PG 04.06.13<br />

6 Michell House White City 04.06.13<br />

29 Mitchell House Australia Road White City Estate W12 7PF 04.06.13<br />

8 Mitchell House Australia Road White City Estate W12 7PF 04.06.13<br />

17 Wharton Street WC1X 9PT 04.06.13<br />

Flat 10 Phipps House White City Estate W12 7QF 04.06.13<br />

77 Abbey Gardens London W6 8QR 04.06.13<br />

48 Orson Ct 182 Shepherd's Bush Road W6 7PF 04.06.13<br />

69 Cleverely Estate Wormholt Road 04.06.13<br />

166 Blaxl<strong>and</strong> House W12 7WS 04.06.13<br />

Commonwealth Avenue White City Estate 04.06.13<br />

Hammersmith Academy 25 Cathnor Road London W12 9JD 20.05.13<br />

NAG 05.07.13<br />

Please refer to ref: 2013/01084/FUL for the report.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Ravenscourt Park<br />

Site Address:<br />

Palco House 11 - 21 Beavor Lane London W6 9AR<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/01619/FUL<br />

Date Valid:<br />

03.06.2013<br />

Case Officer:<br />

Katherine Wood<br />

Conservation Area:<br />

Committee Date:<br />

31.07.2013


Applicant:<br />

Fruition Properties<br />

C/O Agent<br />

Description:<br />

Redevelopment to provide 8 no. 4-storey four-bedroom townhouses <strong>and</strong> 1 no. 4 storey<br />

Class B1 office building (772sqm); along with nine car parking spaces in a new<br />

basement storey, <strong>and</strong> associated storage areas, plant, cycle parking <strong>and</strong> l<strong>and</strong>scaping;<br />

following demolition of office/warehouse building (Class B1/B8)<br />

Drg Nos: 108 Rev E; 109 Rev F; 110 Rev G; 111 Rev F, 112 Rev G;115 Rev C; 116<br />

Rev B; 117 Rev E; 119 Rev D; 120 Rev C; 121<br />

Application Type:<br />

Full Detailed <strong>Planning</strong> Application<br />

Officer Recommendation:<br />

That the Committee resolve that the Executive Director of Transport <strong>and</strong> Technical<br />

Services be authorised to determine the application <strong>and</strong> grant permission up on the<br />

completion of a satisfactory legal agreement <strong>and</strong> subject to the condition(s) set out<br />

below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) The development shall be carried out <strong>and</strong> completed in accordance with the<br />

following approved drawings: 108 Rev E; 109 Rev F; 110 Rev G; 111 Rev F, 112<br />

Rev G; 115 Rev C; 116 Rev B; 117 Rev E; 119 Rev D; 120 Rev C; 121<br />

In order to ensure full compliance with the planning application hereby approved<br />

<strong>and</strong> to prevent harm arising through deviations from the approved plans, in<br />

accordance with policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, <strong>and</strong> 7.21 of the London Plan<br />

<strong>and</strong> policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan<br />

2013 <strong>and</strong> policy BE1 of the Core Strategy 2011.<br />

3) Prior to commencement of the development hereby approved, a Demolition<br />

Management Plan, a Construction Logistics Plan <strong>and</strong> a Construction Management<br />

Plan shall be submitted to <strong>and</strong> approved in writing by the Council. Details shall<br />

include control measures for dust, noise, vibration, lighting, delivery locations,<br />

restriction of hours of work <strong>and</strong> all associated activities audible beyond the site<br />

boundary to 0800-1800hrs Mondays to Fridays <strong>and</strong> 0800-1300hrs on Saturdays,<br />

advance notification to neighbours <strong>and</strong> other interested parties of proposed works<br />

<strong>and</strong> public display of contact details including accessible phone contact to persons<br />

responsible for the site works for the duration of the works. The details shall also<br />

include the numbers, size <strong>and</strong> routes of demolition <strong>and</strong> construction vehicles,<br />

provisions within the site to ensure that all vehicles associated with the<br />

construction works are properly washed <strong>and</strong> cleaned to prevent the passage of


mud <strong>and</strong> dirt onto the highway, <strong>and</strong> other matters relating to traffic management to<br />

be agreed. Approved details shall be implemented throughout the project period.<br />

To ensure that construction works do not adversely impact on the operation of the<br />

public highway, <strong>and</strong> that the amenity of occupiers of surrounding premises is not<br />

adversely affected by noise, vibration, dust, lighting or other emissions from the<br />

building site, in accordance with Policies DM J1, DM J6, DM H9, DM H11 of the<br />

Development Management Local Plan 2013.<br />

4) No development shall commence until a scheme for temporary fencing <strong>and</strong>/or<br />

enclosure of the site where necessary has been submitted to <strong>and</strong> approved in<br />

writing by the Council, <strong>and</strong> such enclosure has been erected in accordance with<br />

the approved details <strong>and</strong> retained for the duration of the building works. No part of<br />

the temporary fencing <strong>and</strong>/or enclosure of the site shall be used for the display of<br />

advertisement hoardings.<br />

To ensure a satisfactory external appearance of the site, in accordance with<br />

policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan 2013<br />

<strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

5) The development hereby permitted shall not commence until particulars <strong>and</strong><br />

samples of materials to be used in all external faces <strong>and</strong> roof coverings of the<br />

buildings (including colour <strong>and</strong> sample of render), have been submitted <strong>and</strong><br />

approved in writing by the Council. The development shall be carried out in<br />

accordance with the approved details.<br />

To ensure a satisfactory external appearance, in accordance with Policies DM G1<br />

<strong>and</strong> DM G7 of the Development Management Local Plan 2013, <strong>and</strong> Policy BE1 of<br />

the Core Strategy 2011.<br />

6) The development shall not commence until detailed drawings of a typical bay on<br />

the front elevations of the new buildings, including detailed drawings of the<br />

porticos, in plan, section <strong>and</strong> elevation at a scale of no less than 1:20 are<br />

submitted in writing for the Council's approval prior to construction commencing<br />

<strong>and</strong> built in accordance with the approved drawings.<br />

To ensure a satisfactory external appearance <strong>and</strong> prevent harm to the street<br />

scene, in accordance with Policies DM G1 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan 2013 <strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

7) No alterations shall be carried out to the external appearance of the building,<br />

including the installation of air-conditioning units, ventilation fans or extraction<br />

equipment not shown on the approved drawings, without planning permission first<br />

being obtained.<br />

To ensure a satisfactory external appearance <strong>and</strong> to prevent harm to the<br />

amenities of the occupiers of neighbouring residential properties, in accordance<br />

with Policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan<br />

2013, <strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

8) The development shall not commence until a statement of how 'Secured by<br />

Design' requirements are to be adequately achieved has been submitted to <strong>and</strong><br />

approved in writing by the Council. The approved details shall be carried out prior


to occupation of the development hereby approved <strong>and</strong> permanently maintained<br />

thereafter.<br />

To ensure a safe <strong>and</strong> secure environment for users of the development, in<br />

accordance with policy DM G1 of the Development Management Local Plan 2013.<br />

9) Prior to commencement of the development hereby approved, details of the<br />

measures taken to ensure compliance with Lifetime Homes st<strong>and</strong>ards, <strong>and</strong> that<br />

the proposed office is accessible to all users, shall be submitted to <strong>and</strong> approved<br />

in writing by the Council. The development shall be carried out in accordance with<br />

such details as approved <strong>and</strong> permanently retained thereafter.<br />

To ensure that the new dwellings are built to `Lifetime Homes' st<strong>and</strong>ards <strong>and</strong> that<br />

the office provides an accessible environment, in accordance with Policy H4 of the<br />

Core Strategy 2011, Policy 3.8 of The London Plan (2011), Policy DM A4 <strong>and</strong><br />

DM G1 of the Development Management Local Plan 2013 <strong>and</strong> Design Policy 1 of<br />

the <strong>Planning</strong> Guidance SPD.<br />

10) Notwithst<strong>and</strong>ing the provisions of the Town <strong>and</strong> Country <strong>Planning</strong> (General<br />

Permitted Development) Order 1995 (or any Order revoking or re-enacting that<br />

Order with or without modification), no aerials, antennae, satellite dishes or related<br />

telecommunications equipment shall be erected on any part of the development<br />

hereby permitted, without planning permission first being obtained.<br />

To ensure that that the visual impact of telecommunication equipment can be<br />

considered in accordance with Policies DM G1 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan 2013.<br />

11) The development shall not be commence until full details of the refuse storage<br />

arrangements, including provision for the storage of recyclable materials, have<br />

been submitted to <strong>and</strong> approved in writing by the Council. Such details as are<br />

approved shall be fully implemented prior to the occupation of the development. All<br />

refuse/recycling generated by the development hereby approved shall be stored<br />

within the agreed areas. These areas shall be permanently retained for this use.<br />

To ensure the satisfactory provision of refuse storage <strong>and</strong> recycling in accordance<br />

with policy DM H5 of the Development Management Local Plan 2013.<br />

12) The development shall not be occupied until the cycle storage arrangements<br />

indicated on approved drawings ref 109 Rev F <strong>and</strong> 110 Rev G have been<br />

constructed <strong>and</strong> completed <strong>and</strong> the provision shall be retained thereafter for the<br />

lifetime of the development.<br />

To ensure the suitable provision of cycle parking within the development to meet<br />

the needs of future site occupiers <strong>and</strong> users, in accordance with policies 6.9 <strong>and</strong><br />

6.13 of the London Plan 2011 <strong>and</strong> policy DM J5 of the Development Management<br />

Local Plan 2013.<br />

13) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council, of the sound insulation of the floor/ ceiling/<br />

walls separating the commercial parts of the premises from dwellings. Details<br />

shall demonstrate that the sound insulation value DnT,w [<strong>and</strong> L'nT,w ] is<br />

sufficiently enhanced <strong>and</strong>, where necessary, additional mitigation measures are


implemented to contain commercial noise within the commercial premises <strong>and</strong> to<br />

achieve the `Good' criteria of BS8233:1999 within the dwellings. Approved details<br />

shall be implemented prior to occupation of the development <strong>and</strong> thereafter be<br />

permanently retained.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013.<br />

14) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council, of the sound insulation of the floor/ ceiling/<br />

walls separating the basement plant room, basement car park, <strong>and</strong> car lift from<br />

noise sensitive premises. Details shall demonstrate that the sound insulation<br />

value DnT,w [<strong>and</strong> L'nT,w ] is sufficiently enhanced <strong>and</strong>, where necessary,<br />

additional mitigation measures implemented to contain commercial noise within<br />

the commercial premises <strong>and</strong> to achieve the `Good' criteria of BS8233:1999 within<br />

the noise sensitive premises. Approved details shall be implemented prior to<br />

occupation of the development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013.<br />

15) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council, of an enhanced sound insulation value DnT,w<br />

<strong>and</strong> LnT,w for the floor/ceiling/ wall structures separating different types of rooms/<br />

uses in adjoining dwellings. The details as approved shall be implemented prior to<br />

occupation of the development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013.<br />

16) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council, of the external noise level emitted from plant/<br />

machinery/ equipment (including the proposed car lift) <strong>and</strong> mitigation measures as<br />

appropriate. The measures shall ensure that the external noise level emitted from<br />

plant, machinery/ equipment (including the car lift) will be lower than the lowest<br />

existing background noise level by at least 10dBA, as assessed according to<br />

BS4142:1997 at the nearest <strong>and</strong>/or most affected noise sensitive premises, with<br />

all machinery operating together at maximum capacity. A post installation noise<br />

assessment shall be carried out <strong>and</strong> submitted to the Council for approval prior to<br />

first occupation of the development to confirm compliance with the noise criteria<br />

<strong>and</strong> additional steps to mitigate noise shall be taken, as necessary. Approved<br />

details shall be implemented prior to occupation of the development <strong>and</strong> thereafter<br />

be permanently retained.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013.


17) Prior to commencement of the development, details of anti-vibration measures<br />

shall be submitted to <strong>and</strong> approved in writing by the Council. The measures shall<br />

ensure that machinery (including the proposed car lift), plant/ equipment, extract/<br />

ventilation system <strong>and</strong> ducting are mounted with proprietary anti-vibration isolators<br />

<strong>and</strong> fan motors are vibration isolated from the casing <strong>and</strong> adequately silenced.<br />

Approved details shall be implemented prior to occupation of the development <strong>and</strong><br />

thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise, in accordance with Policy DM H9 of the Development<br />

Management Local Plan 2013.<br />

18) The use of the office shall not be permitted during the hours of 20:00 - 07:30<br />

Mondays to Fridays, 20:00 -07:30 on Saturdays nor at any time on Sundays <strong>and</strong><br />

Public/Bank Holidays.<br />

To ensure that the amenity of occupiers of surrounding premises is not adversely<br />

affected by noise from activities or people at or leaving the site, in accordance with<br />

Policy DM H9 of the Development Management Local Plan 2013.<br />

19) The development hereby permitted shall not commence until further details of a<br />

Sustainable Urban Drainage System (SUDS), including maintenance programme<br />

have been submitted to <strong>and</strong> approved in writing by the council. The SUDS scheme<br />

shall be implemented in accordance with the approved details prior to occupation<br />

of the development hereby permitted, <strong>and</strong> thereafter permanently retained <strong>and</strong><br />

maintained in line with the agreed plan.<br />

To ensure that surface water run-off is managed in a sustainable manner, in<br />

accordance with policy 5.13 of The London Plan 2011, Policy CC2 of the Core<br />

Strategy 2011 <strong>and</strong> policy DM H3 of the Development Management Local Plan<br />

2013.<br />

20) The development hereby permitted shall not be occupied before implementation of<br />

the energy efficiency <strong>and</strong> renewable energy measures detailed in the submitted<br />

Energy Strategy dated April 2013. All details shall be implemented prior to<br />

occupation or use of the development hereby permitted, <strong>and</strong> thereafter<br />

permanently retained.<br />

To ensure a satisfactory external appearance <strong>and</strong> the integration of energy<br />

generation from renewable sources, consistent with the Mayor's sustainable<br />

design objectives in accordance with Policies DM G1<strong>and</strong> DM H1 of the<br />

Development Management Local Plan 2013, Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The<br />

London Plan (2011), <strong>and</strong> Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />

21) The development hereby permitted shall be constructed in accordance with the<br />

sustainable design <strong>and</strong> construction measures detailed in the submitted<br />

Sustainability Statement for 11 Beavor Lane dated April 2013. All details shall be<br />

implemented prior to occupation or use of the development hereby permitted, <strong>and</strong><br />

thereafter permanently retained.<br />

To ensure a sustainable development, consistent with the Mayor's sustainable<br />

design objectives in accordance with Policies DM G1, DM H2 of the Development


Management Local Plan 2013 <strong>and</strong> Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The London<br />

Plan (2011), <strong>and</strong> Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />

22) No development shall commence until a preliminary risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall comprise: a<br />

desktop study which identifies all current <strong>and</strong> previous uses at the site <strong>and</strong><br />

surrounding area as well as the potential contaminants associated with those<br />

uses; a site reconnaissance; <strong>and</strong> a conceptual model indicating potential pollutant<br />

linkages between sources, pathways <strong>and</strong> receptors, including those in the<br />

surrounding area <strong>and</strong> those planned at the site; <strong>and</strong> a qualitative risk assessment<br />

of any potentially unacceptable risks arising from the identified pollutant linkages<br />

to human health, controlled waters <strong>and</strong> the wider environment including ecological<br />

receptors <strong>and</strong> building materials. All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. The condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy 2011 <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the<br />

Development Management Local Plan 2013.<br />

23) No development shall commence until a site investigation scheme is submitted to<br />

<strong>and</strong> approved in writing by the Council. This scheme shall be based upon <strong>and</strong><br />

target the risks identified in the approved preliminary risk assessment <strong>and</strong> shall<br />

provide provisions for, where relevant, the sampling of soil, soil vapour, ground<br />

gas, surface <strong>and</strong> groundwater . All works must be carried out in compliance with<br />

<strong>and</strong> by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. The condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy 2011 <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the<br />

Development Management Local Plan 2013.<br />

24) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, following a site investigation undertaken in compliance with the<br />

approved site investigation scheme, a quantitative risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall: assess the<br />

degree <strong>and</strong> nature of any contamination identified on the site through the site<br />

investigation; include a revised conceptual site model from the preliminary risk<br />

assessment based on the information gathered through the site investigation to<br />

confirm the existence of any remaining pollutant linkages <strong>and</strong> determine the risks<br />

posed by any contamination to human health, controlled waters <strong>and</strong> the wider<br />

environment. All works must be carried out in compliance with <strong>and</strong> by a competent<br />

person who conforms to CLR 11: Model Procedures for the Management of L<strong>and</strong>


Contamination (Defra 2004) or the current UK requirements for sampling <strong>and</strong><br />

testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. The condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy 2011 <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the<br />

Development Management Local Plan 2013.<br />

25) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, a remediation method statement is submitted to <strong>and</strong> approved in<br />

writing by the Council. This statement shall detail any required remediation works<br />

<strong>and</strong> shall be designed to mitigate any remaining risks identified in the approved<br />

quantitative risk assessment. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. The condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy 2011 <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the<br />

Development Management Local Plan 2013.<br />

26) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until the approved remediation method statement has been carried out<br />

in full <strong>and</strong> a verification report confirming these works has been submitted to, <strong>and</strong><br />

approved in writing, by the Council. This report shall include: details of the<br />

remediation works carried out; results of any verification sampling, testing or<br />

monitoring including the analysis of any imported soil; all waste management<br />

documentation showing the classification of waste, its treatment, movement <strong>and</strong><br />

disposal; <strong>and</strong> the validation of gas membrane placement. If, during development,<br />

contamination not previously identified is found to be present at the site, the<br />

Council is to be informed immediately <strong>and</strong> no further development (unless<br />

otherwise agreed in writing by the Council) shall be carried out until a report<br />

indicating the nature of the contamination <strong>and</strong> how it is to be dealt with is<br />

submitted to, <strong>and</strong> agreed in writing by, the Council. Any required remediation shall<br />

be detailed in an amendment to the remediation statement <strong>and</strong> verification of<br />

these works included in the verification report. All works must be carried out in<br />

compliance with <strong>and</strong> by a competent person who conforms to CLR 11: Model<br />

Procedures for the Management of L<strong>and</strong> Contamination (Defra 2004) or the<br />

current UK requirements for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. The condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic


Policy CC4 of the Core Strategy 2011 <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the<br />

Development Management Local Plan 2013<br />

27) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until an onward long-term monitoring methodology report is submitted<br />

to <strong>and</strong> approved in writing by the Council where further monitoring is required past<br />

the completion of development works to verify the success of the remediation<br />

undertaken. A verification report of these monitoring works shall then be submitted<br />

to <strong>and</strong> approved in writing by the Council when it may be demonstrated that no<br />

residual adverse risks exist. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. The condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy 2011 <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the<br />

Development Management Local Plan 2013<br />

28) Prior to commencement of the works above ground hereby permitted, details of<br />

the hard <strong>and</strong> soft l<strong>and</strong>scaping of all areas external to the building, including<br />

planting <strong>and</strong> paving, detailed drawings at a scale of not less than 1:20 of fences,<br />

gates <strong>and</strong> other means of enclosure shall have been submitted to <strong>and</strong> approved in<br />

writing by the Council, <strong>and</strong> the development shall not be used until such hard<br />

l<strong>and</strong>scaping as is approved has been carried out. Soft l<strong>and</strong>scaping shall be carried<br />

out during the first planting season available. Any soft l<strong>and</strong>scaping removed or<br />

severely damaged, dying or becoming seriously diseased within 5 years of<br />

planting shall be replaced with a tree or shrub of similar size <strong>and</strong> species to that<br />

originally required to be planted.<br />

To ensure a satisfactory external appearance <strong>and</strong> satisfactory provision for<br />

permeable surfaces in accordance with policies DM G7 <strong>and</strong> DM G1 of the<br />

Development Management Local Plan 2013, <strong>and</strong> policy BE1 of the Core Strategy<br />

2011.<br />

29) The occupation of the office hereby approved shall not commence until a Service<br />

Management Plan, specific to the proposed use within the unit, has been<br />

submitted to <strong>and</strong> approved in writing by the Council. The plan shall specify the<br />

number of weekly deliveries <strong>and</strong> size of vehicles to be used, as well as the times<br />

for deliveries. The office shall only be occupied in accordance with the details<br />

approved as part of the Service Management Plan.<br />

To ensure satisfactory provision for servicing <strong>and</strong> to prevent noise <strong>and</strong> disturbance<br />

to neighbouring residents, in accordance with Policy DM J6 <strong>and</strong> DM H9 of the<br />

Development Management Local Plan 2013<br />

30) The proposed car parking spaces shall be laid out as shown on drawing no.109<br />

Rev F <strong>and</strong> shall not be altered unless otherwise agreed in writing by the Council.


At least one of the proposed spaces shall be permanently available for disabled<br />

drivers. Prior to the occupation or use of the development, a car park management<br />

plan shall be submitted to <strong>and</strong> approved in writing by the Council, details of which<br />

shall include how disabled people would have priority over use of the designated<br />

disabled parking bay(s). The parking arrangements, including the designated<br />

disabled parking bay(s), shall be permanently retained.<br />

To ensure satisfactory parking provision, including for disabled people, in<br />

accordance with Policy DM J2 <strong>and</strong> DM J4 of the Development Management Local<br />

Plan 2013.<br />

31) Prior to first use of the office hereby approved, the proposed windows in the rear<br />

elevation at ground, first, second <strong>and</strong> third floor levels shall be glazed with obscure<br />

glass, a sample of which shall have been submitted to <strong>and</strong> approved in writing by<br />

the Council before development commences. The windows shall also be installed<br />

to be non-opening or top opening only prior to first use of the office. The windows<br />

shall be permanently maintained in this form.<br />

To prevent loss of privacy to a neighbour, in accordance with Policy DM A9 of the<br />

Development Management Local Plan 2013 <strong>and</strong> Housing Policy 8 of the <strong>Planning</strong><br />

Guidance SPD 2013.<br />

32) Notwithst<strong>and</strong>ing the provisions of Part 1 of Schedule 2 to The Town <strong>and</strong> Country<br />

<strong>Planning</strong> (General Permitted Development) Order 1995 (or any order amending,<br />

revoking <strong>and</strong> re-enacting that Order) no extensions or other form of enlargement<br />

to the residential dwellings hereby permitted, nor erection of porches, outbuildings,<br />

hardst<strong>and</strong>ings or storage tanks shall be carried out within the residential<br />

curtilages.<br />

To enable the Council to retain control over any future development in view of the<br />

restricted area of the site <strong>and</strong> the effect of such development on the residential<br />

amenities of surrounding properties, in accordance with Policies DM G1 <strong>and</strong> DM<br />

G7 of the Development Management Local Plan 2013, <strong>and</strong> Policy BE1 of the Core<br />

Strategy 2011.<br />

33) The development shall be implemented in accordance with the recommended<br />

flood mitigation measures as proposed in the submitted Flood Risk Assessment.<br />

In line with advice from Thames Water, a non-return valve or other suitable device<br />

shall be installed to avoid the risk of the sewerage network surcharging<br />

wastewater to basement/ground level during storm conditions. The recommended<br />

mitigation measures shall be permanently retained thereafter.<br />

To prevent risk from flooding, in accordance with Policy CC2 of the Core Strategy<br />

2011, <strong>and</strong> Policy DM H3 of the Development Management Local Plan 2013.<br />

34) The development shall not commence until full details of the operation of the<br />

proposed car lift, including the dimensions, time taken to complete an operation,<br />

<strong>and</strong> a scheme for maintenance <strong>and</strong> emergency repair, has been submitted to <strong>and</strong><br />

approved in writing by the Council. The approved details shall be fully<br />

implemented <strong>and</strong> permanently maintained as such.


To ensure the safe operation of the car lift <strong>and</strong> the highway, in accordance with<br />

Policy DM J6 of the Development Management Local Plan 2013.<br />

35) With the exception of the terrace areas indicated on the approved drawings, no<br />

part of any other roof of the approved buildings shall be used as a terrace or other<br />

amenity space.<br />

To safeguard the amenities of the occupiers of neighbouring properties, <strong>and</strong> to<br />

avoid overlooking <strong>and</strong> loss of privacy <strong>and</strong> the potential for additional noise <strong>and</strong><br />

disturbance, in accordance with Policy DM H9 <strong>and</strong> DM A9 of the Development<br />

Management Local Plan 2013.<br />

Justification for Approving the Application:<br />

1) 1. L<strong>and</strong> Use: The proposed development would achieve a sustainable<br />

development with efficient use of previously developed l<strong>and</strong>. The proposal would<br />

provide a mixed use development, retaining employment use appropriate to the<br />

site's context <strong>and</strong> family-sized residential units. The proposal is considered to be in<br />

accordance with Core Strategy Policies LE1, H1 <strong>and</strong> H2, London Plan Policies<br />

3.3, 3.4, 4.2 <strong>and</strong> 4.3 <strong>and</strong> policies DM B1, DM A1 <strong>and</strong> A3 of the Development<br />

Management Local Plan 2013.<br />

2. Housing mix <strong>and</strong> quality: The proposed development would contribute too<br />

much needed additional housing, <strong>and</strong> would help the borough meet its housing<br />

targets, in accordance with London Plan Policies 3.3 <strong>and</strong> 3.4. The housing brought<br />

forward by the development would provide family units in accordance with DM LP<br />

2013 policies DM A1 <strong>and</strong> DM A3, together with Core Strategy H4. The internal<br />

design <strong>and</strong> layout of the new residential units are considered satisfactory having<br />

regard to Mayor's Design Guidelines, <strong>and</strong> London Plan Policy 3.5 <strong>and</strong> table 3.3,<br />

together with policies DM A2 <strong>and</strong> DM A9 of the Development Management Local<br />

Plan 2013.<br />

3. Density: The proposal is of an acceptable density which would optimise the<br />

potential of the site <strong>and</strong> would be compatible with the local character <strong>and</strong> context<br />

<strong>and</strong> with public transport capacity. The proposal thereby satisfies London Plan<br />

Policy 3.4, Core Strategy H3, policy DM A2 <strong>and</strong> DM G1 of the Development<br />

Management Local Plan 2013 <strong>and</strong> London Plan Policies 3.8 <strong>and</strong> 7.2.<br />

4. Design: The development is considered to comply with Development<br />

Management Local Plan 2013 Policies DM G1, DM G7 <strong>and</strong> Core Strategy 2011<br />

Policy BE1, which requires a high st<strong>and</strong>ard of design in all developments,<br />

compatible with the scale <strong>and</strong> character of existing development <strong>and</strong> its setting,<br />

<strong>and</strong> London Plan policies 7.1, 7.2, 7.4, 7.5, 7.6 which seek a high quality in design<br />

<strong>and</strong> architecture, requiring new developments to have regard to the pattern <strong>and</strong><br />

grain of existing development. The proposal would preserve <strong>and</strong> enhance the<br />

character <strong>and</strong> appearance of the adjacent conservation area in accordance with<br />

the policies detailed above.<br />

5. Residential Amenity: The impact of the proposed development upon<br />

adjoining occupiers is considered acceptable. The proposal would not have an<br />

unacceptably harmful impact on neighbouring residential amenity in terms of light,<br />

outlook or privacy <strong>and</strong> noise <strong>and</strong> disturbance. The office use would not result in


unacceptable noise <strong>and</strong> disturbance to nearby residents. In this regard, the<br />

development would respect the principles of good neighbourliness, <strong>and</strong> would<br />

therefore be acceptable in accordance with Policy DM H9 <strong>and</strong> SPD Housing Policy<br />

8 of the Development Management Local Plan 2013.<br />

6. Access & Safety: The development would provide a safe <strong>and</strong> secure<br />

environment for all users, <strong>and</strong> would provide ease of access for all people,<br />

including disabled people, in accordance with in accordance with Policy DM G1<br />

<strong>and</strong> DM A4 of the Development Management Local Plan 2013 <strong>and</strong> London Plan<br />

Policies 3.8 <strong>and</strong> 7.2.<br />

7. Highways matters: It has been demonstrated that the scheme would not<br />

have a significant further impact on the highway network or local parking<br />

conditions <strong>and</strong> is thus considered to be acceptable. Satisfactory provision would<br />

be made for cycle parking <strong>and</strong> future occupiers would be prevented from obtaining<br />

on-street parking permits as part of the legal agreement, to help prevent overspill<br />

of parking onto the local highways. There are available public transport <strong>and</strong> other<br />

services nearby <strong>and</strong> adequate provision for storage <strong>and</strong> collection of refuse <strong>and</strong><br />

recyclables would be provided. The development thereby accords with<br />

Development Management Local Plan 2013 Policies DM J1, DM J2, DM J3, DM<br />

H5, Core Strategy Policies CC3 <strong>and</strong> London Plan Policies 6.1, 6.3, 6.10, 6.11 <strong>and</strong><br />

6.13.<br />

8. Sustainability: The application proposes a number of measures to reduce<br />

CO2 emissions from the baseline, including renewable energy measures. The<br />

proposal would seek to reduce pollution <strong>and</strong> waste <strong>and</strong> minimise its environmental<br />

impact. In this respect the proposal complies with Development Management<br />

Local Plan policies H1 <strong>and</strong> H2, Core Strategy policies CC1 <strong>and</strong> Policies 5.2, 5.3<br />

<strong>and</strong> 5.7 of The London Plan.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 22nd April 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

The Development Management Local Plan 2013<br />

Consultation Comments:<br />

Comments from:<br />

Dated:


Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

1 Theresa Road Ravenscourt Park London W6 9AQ 09.06.13<br />

44 Ravenscourt Gardens 44 Ravenscourt Gardens W6 0TU 10.07.13<br />

24 St Peter's Road London W6 9BD 18.06.13<br />

6 Beavor Lane London W6 9UL 04.07.13<br />

6 Beavor Lane London W6 9UL 05.07.13<br />

1.0 BACKGROUND<br />

1.1 The site comprises a two <strong>and</strong> a half storey high building on the eastern side of<br />

Beavor Lane, opposite the junction with Theresa Road. The building is occupied by a<br />

storage warehouse (Class B8) on the ground floor <strong>and</strong> offices (Class B1) on the upper<br />

floor.<br />

1.2 The site is not within a conservation area, although it is directly opposite the St<br />

Peter's Square Conservation Area which starts on the junction of Beavor Lane <strong>and</strong> the<br />

southern side of Theresa Road. The site is within the Environment Agency's Flood Risk<br />

Zones 2 <strong>and</strong> 3. The public transport accessibility level of the site (PTAL) is 4 which is<br />

considered to be very good.<br />

1.3 The site is bounded to the west by the two storey residential building on the<br />

corner of Beavor Lane <strong>and</strong> Theresa Road (nos.23-34 Beavor Lane) <strong>and</strong> also 12 <strong>and</strong> 14<br />

Beavor Lane, <strong>and</strong>, on the opposite side of the road, the playground to St Peter's<br />

Primary School. To the south the premises are adjoined by a three storey office building<br />

at 23-31 Beavor Lane. To the east, the majority of the site directly abuts the rear wall of<br />

a Royal Mail depot building on Vencourt Place, but the northern part of the site adjoins<br />

the rear boundary with 7-12 Court Mansions - a four storey block of flats.<br />

1.4 To the north, the site is adjoined by the commercial development at 281 King<br />

Street which extends south along Beavor Lane (the three storey rear wing of this<br />

building is separated from the site by a car park <strong>and</strong> a part one, part two storey<br />

building). A planning application has recently been submitted for the redevelopment of<br />

this site, including the erection of townhouses along Beavor Lane to the north of this<br />

application site.<br />

1.5 The proposal is to demolish the existing building <strong>and</strong> to redevelop the site to<br />

provide eight 4-storey four-bedroom townhouses <strong>and</strong> a 4-storey Class B1 office building<br />

(772sqm); along with nine car parking spaces in a new basement storey, <strong>and</strong><br />

associated storage areas, plant, cycle parking <strong>and</strong> l<strong>and</strong>scaping.<br />

1.6 <strong>Planning</strong> permission was granted in 2005 (2005/02827/FUL) for the change of<br />

use of ground floor from storage <strong>and</strong> distribution (Class B8) to office (Class B1) <strong>and</strong><br />

replacement of existing roller shutters with windows on the front elevation. This<br />

permission was renewed in 2008 (2008/03312/FUL) <strong>and</strong> 2011 (2011/03108/FUL) but<br />

has never been implemented <strong>and</strong> a warehouse use remains on the ground floor.


2.0 PUBLICITY AND CONSULTATIONS<br />

2.1 Notification letters were sent to 350 surrounding properties, as well as residents'<br />

associations <strong>and</strong> amenity groups including the Hammersmith Society, Hammersmith<br />

<strong>and</strong> Fulham Historic Buildings Group, St Peter's Residents' Association <strong>and</strong> the<br />

Ravenscourt Society, <strong>and</strong> a site <strong>and</strong> press notice were posted. Responses have been<br />

received from five individual neighbours.<br />

2.2 Two responses are in support or part-support of the proposal, with the following<br />

comments:<br />

- development will be an improvement to the area, as housing is preferable to<br />

warehouses<br />

- as development provides parking for the houses <strong>and</strong> office, assuming the impact on<br />

existing residential parking will be minimal<br />

- development has much to recommend it - traditional architecture fits well with nearby<br />

buildings in St Peter's Square <strong>and</strong> on King Street<br />

2.3 Three responses are in objection to the proposal, <strong>and</strong> one letter raises concerns<br />

as well as support, with the following comments in summary:<br />

- 4 storey townhouses not in keeping with the character of the area; three storeys would<br />

be better <strong>and</strong> would give the street a more unified height.<br />

- development would be overbearing on properties opposite<br />

- loss of light<br />

- detailed design is not in keeping with character of surrounding buildings<br />

- detailing could be better - e.g. front doors look out of proportion, portico columns need<br />

resolving.<br />

- concerns about impact on traffic, use of car lift leading to traffic queuing on Beavor<br />

Lane <strong>and</strong> noise<br />

- office building should be pushed back to be on the same building line as the proposed<br />

houses <strong>and</strong> should be on the opposite side of development to avoid conflict with<br />

residential properties opposite<br />

- concern about effects of excavating the basement/heavy machinery close to existing<br />

old houses<br />

- noise <strong>and</strong> disturbance from building works<br />

- potential for loss of privacy<br />

- lack of developer consultation<br />

2.4 The Hammersmith Society, the Hammersmith <strong>and</strong> Fulham Historic Buildings<br />

Group, St Peter's Residents' Association <strong>and</strong> the Ravenscourt Society have not<br />

commented on the proposal.<br />

2.5 Officer's note: matters relating to the noise <strong>and</strong> disturbance from building works<br />

cannot be taken into account in assessing the planning proposal; this is controlled<br />

under relevant environmental health legislation. With regard to developer consultation,<br />

the developers held a meeting on 8th April 2013 to discuss the proposals, to which<br />

representatives of amenity groups <strong>and</strong> local residents were invited (<strong>and</strong> attended). A<br />

meeting was also held with St Peter's primary school on 26th February 2013. The other<br />

planning issues raised will be considered in the report below.<br />

2.6 The Environment Agency has responded to consultation on the application, raising<br />

no objection.


2.7 The London Fire And Emergency <strong>Planning</strong> Authority have been consulted, but<br />

have not responded.<br />

2.8 The Metropolitan Police's Crime Prevention Design Advisor has been consulted,<br />

but has not responded.<br />

3.0 PLANNING CONSIDERATIONS<br />

3.1 The main planning issues to be considered in the light of relevant national,<br />

regional <strong>and</strong> local planning policies include:<br />

- The principle of development in l<strong>and</strong> use terms<br />

- The quantum <strong>and</strong> tenure of the scheme<br />

- The impact of the design <strong>and</strong> scale of the proposed new development, including the<br />

impact on the adjoining conservation area<br />

- The effect on amenity of neighbours<br />

- The quality of the proposed residential accommodation<br />

- Highways <strong>and</strong> parking<br />

- Environmental matters - sustainability, flood risk <strong>and</strong> contaminated l<strong>and</strong><br />

LAND USE, QUANTUM, TENURE<br />

3.2 The existing site has an established use as a Class B8/B1 warehouse <strong>and</strong> office<br />

facility <strong>and</strong> is currently occupied by an office supplies business. The applicant has<br />

submitted information to demonstrate that the existing offices are outdated <strong>and</strong> no<br />

longer fit for purpose. The company is relocating as the existing premises <strong>and</strong> location<br />

are not suitable to run <strong>and</strong> exp<strong>and</strong> the business. The current site provides 926sqm of<br />

warehouse space on the ground floor <strong>and</strong> 858sqm of office space on the first floor.<br />

Currently, 67 employees work at the site, of which 60 work in the first floor offices <strong>and</strong> 7<br />

in the warehouse. The proposal would involve the removal of the warehouse space <strong>and</strong><br />

the replacement of offices within a mixed use residential <strong>and</strong> office scheme, with the<br />

floorspace of the new offices being 772sqm.<br />

3.3 Core Strategy Policy LE1 states that the Council will require the 'retention of<br />

premises capable of providing continued accommodation for local services or significant<br />

employment unless: continued use would adversely impact on residential areas; or it<br />

can be satisfactorily demonstrated that the property is no longer required for<br />

employment purposes.' Further, Policy DM B1 of the Local Plan states: 'Where the loss<br />

of employment use is proposed in line with borough wide policy LE1 (sub para.3) the<br />

council will have regard to:<br />

- the suitability of the site or premises for continued employment use with or without<br />

adaptation;<br />

- evidence of unsuccessful marketing;<br />

- the need to avoid adverse impact on established clusters of employment use; <strong>and</strong><br />

- the need to ensure a sufficient stock of premises <strong>and</strong> sites to meet local need for a<br />

range of types of employment uses in appropriate locations.<br />

The mixed use enhancement of employment sites will be considered acceptable where<br />

these are under-utilised, subject to the satisfactory retention or replacement of<br />

employment uses in the scheme where this continues to be appropriate.'<br />

3.4 Additionally, London Plan Policies 4.2 <strong>and</strong> 4.3 specify that employment l<strong>and</strong> <strong>and</strong><br />

premises should be retained where needed <strong>and</strong> intensified where appropriate, but that<br />

surplus l<strong>and</strong> or premises should be released to provide for other uses such as housing.


3.5 In this instance, the Class B8 warehouse floorspace on the ground floor is<br />

considered to have limited employment potential as it is used primarily for storage <strong>and</strong><br />

only 7 people work in half of the building's floorspace. There is also evidence to suggest<br />

that the use of the warehouse <strong>and</strong> the heavy traffic associated with it could cause<br />

conflict with the existing predominantly residential uses in the surrounding area. There<br />

are no objections in principle to the loss of this use, therefore. The retention of an<br />

employment use in the form of Class B1 offices in the proposed mixed-use scheme is<br />

welcomed. Whilst there would be a reduction in office floorspace of 86 sqm, the<br />

submitted condition report <strong>and</strong> an officer's site visit has confirmed that the current<br />

offices are in poor condition <strong>and</strong> also underused, <strong>and</strong> the proposed offices would<br />

involve a significant upgrade of the existing accommodation which has the potential to<br />

provide space for at least as many employees as the existing offices (as serviced<br />

offices, the proposal could accommodate 80 - 100 employees). It is therefore<br />

considered that the scheme, in redeveloping <strong>and</strong> enhancing an underutilised site for a<br />

mixed use development which retains accommodation for employment, would be<br />

consistent with the aims of Policies LE1 <strong>and</strong> DM B1, as well as the aims of the London<br />

Plan.<br />

3.6 Policy 3.3 of The London Plan states that 32,210 net additional homes should be<br />

delivered per annum in London. Of this, the London Borough of Hammersmith <strong>and</strong><br />

Fulham has a target to deliver 615 net additional dwellings per annum. The Council's<br />

Core Strategy Policy H1 <strong>and</strong> DM Local Plan Policy DM A1 support this by stating that<br />

the Council will seek to exceed the London Plan's targets by, amongst other things,<br />

seeking housing on windfall sites where l<strong>and</strong> <strong>and</strong> premises are shown to be surplus to<br />

requirements of other l<strong>and</strong> uses. The proposed redevelopment to provide 8 residential<br />

units would contribute to these targets. The site has an area of 950sqm, <strong>and</strong> eight fourbedroom<br />

units would give a residential density of approximately 424 habitable<br />

rooms/hectare or 85 dwellings/hectare. This is at the mid-to-lower end of expected<br />

density ranges for housing within this urban location with a PTAL rating of 6a, according<br />

to London Plan Policy 3.4 <strong>and</strong> Table 3.2. However, the provision of large family housing<br />

is welcomed. Given the need to protect amenity to neighbouring residents, <strong>and</strong> the fact<br />

that the proposal retains the existing employment uses which is also welcomed, officers<br />

agree that it would not be desirable to try to achieve a greater number of units within<br />

this scheme, which would trigger the need for consideration of affordable housing to be<br />

provided. The proposed houses would be for market sale.<br />

3.7 The proposed l<strong>and</strong> uses <strong>and</strong> residential density are therefore considered<br />

acceptable <strong>and</strong> in accordance with Policies LE1 <strong>and</strong> H1 of the Core Strategy, <strong>and</strong><br />

Policies 3.3 <strong>and</strong> 4.2 of The London Plan.<br />

VISUAL AMENITY<br />

3.8 Core Strategy Policy BE1 <strong>and</strong> Policies DM G1 <strong>and</strong> DM G7 are relevant. These<br />

policies require new development to be compatible with the scale <strong>and</strong> character of<br />

existing development, reinforce local distinctiveness, be neighbourly, be inclusive,<br />

adhere to sustainability principles <strong>and</strong> secure by design, <strong>and</strong> to respect the setting of<br />

heritage assets, including conservation areas. In addition, Design policies 1 <strong>and</strong> 45-50<br />

of the <strong>Planning</strong> Guidance SPD will also be considered.<br />

3.9 The existing warehouse/office building dates from the 1970s <strong>and</strong> is a flat roofed<br />

building rising to 2 ½ storeys, built from light coloured brick. There are two large roller-


shutter entrance doors at ground floor level, at the north <strong>and</strong> south sides of the front<br />

elevation, with the front door in the middle. There are no other openings at ground floor<br />

level <strong>and</strong> the building presents a somewhat bleak aspect on to Beavor Lane. The<br />

building is not a high quality structure <strong>and</strong> does not contribute positively to the<br />

appearance of the street scene. There is no objection in principle to its demolition,<br />

therefore, subject to a scheme to provide a satisfactory replacement development. The<br />

redevelopment scheme proposed would help to activate the street frontage <strong>and</strong> would<br />

provide a set-back building line with l<strong>and</strong>scaping to front gardens, which is welcomed.<br />

3.10 The proposed development would consist of a three storey terrace of buildings<br />

along the street frontage, with a set-back fourth storey. A traditional design has been<br />

chosen for the townhouses, which would incorporate pillared front porches, white<br />

rendered facades, slate mansard roofs <strong>and</strong> a front parapet, incorporating bottle<br />

balustrading to alternate properties. The front parapet would align with the height of the<br />

adjacent three storey building at no.23 Beavor Lane, <strong>and</strong> the set back additional storey<br />

would not be prominent within the street scene, though it would be visible in longer<br />

views from Theresa Road opposite <strong>and</strong> views of the side elevation from the north.<br />

Given the scale <strong>and</strong> heights of the adjoining buildings, it is considered that the scale<br />

<strong>and</strong> massing, with the set back to the third floor, would be appropriate to the site's<br />

context. The elevational design, whilst taking references from dwellings further within<br />

the St Peter's Square Conservation Area rather than the immediate context, is<br />

considered acceptable given the fact that there is no consistent design or period to the<br />

buildings within Beavor Lane. The proposed elegant residential facades, along with the<br />

l<strong>and</strong>scaped front gardens <strong>and</strong> regular front door <strong>and</strong> window openings, would serve to<br />

significantly enhance the appearance of the street scene <strong>and</strong> would make a positive<br />

contribution to the character <strong>and</strong> appearance of the adjacent conservation area. The<br />

proposal would thus comply with Policies BE1, DM G1 <strong>and</strong> DM G7.<br />

3.11 The detailing of the front elevation <strong>and</strong> elements such as the porticos, windows<br />

<strong>and</strong> balustrades would be critical to the success of the overall design <strong>and</strong> thus detailed<br />

elevational <strong>and</strong> sectional drawings, as well as the materials, will be reserved by<br />

condition (conditions 5 <strong>and</strong> 6).<br />

3.12 It is noted that a planning application has recently been submitted for the<br />

redevelopment at the adjacent site to the north, at 271-281 King Street. Should<br />

permission be granted for this current scheme at 11-21 Beavor Lane, the new King<br />

Street application will be considered having regard to the impact of the proposed<br />

scheme on Beavor Lane <strong>and</strong> the relationship between the two proposals.<br />

IMPACT on NEIGHBOURS<br />

3.13 The northern end of the site is located opposite residential properties on the<br />

eastern side of Beavor Lane, <strong>and</strong> there are flats at Court Mansions to the northeast.<br />

The southern half of the site is opposite the playground of St Peter's Primary School.<br />

There are commercial buildings immediately adjacent directly to the north <strong>and</strong> south.<br />

Outlook<br />

3.14 The existing building would be replaced with a taller three storey building on the<br />

frontage, with a set-back fourth floor. The building line of the proposed office building<br />

would follow the existing building line on the upper floors. The proposed residential<br />

properties would be set back by 1.5m to provide the front gardens. The resulting built<br />

form would therefore be taller by 2.1m on the frontage, with an additional floor set 2.1m


ack from the frontage. In relation to the properties opposite on Beavor Lane, it should<br />

be noted that these two storey dwellings already face development that is considerably<br />

higher than the eaves of the houses <strong>and</strong> it is not considered that the additional height of<br />

the building's frontage would have a significantly overbearing impact on these<br />

properties <strong>and</strong> would not further reduce outlook. The height of the additional storey<br />

would not be readily apparent when viewed from the ground floor of these properties<br />

due to its set back <strong>and</strong> the width of the street. The development would be within a 45<br />

degree line drawn from the boundary with the front gardens of the properties opposite,<br />

indicating an acceptable impact in terms of outlook in accordance with Housing Policy 8<br />

of the <strong>Planning</strong> Guidance SPD.<br />

3.15 The upper floors of the proposed office building would be set back from the rear<br />

building line in order to ease the relationship with the rear elevation of Court Mansions<br />

behind this development. Amended plans have been received during the course of the<br />

application to ensure that no development at ground <strong>and</strong> first floor levels would extend<br />

beyond the existing development at these levels, <strong>and</strong> in fact part of the ground floor<br />

would be set back from the existing rear extent of the ground floor level by 1.8m <strong>and</strong> the<br />

whole of the ground floor would be reduced in height by 1m compared to the existing<br />

development. Whilst the height of the building would be raised by 2m from the existing<br />

first floor level to accommodate the proposed second floor level, the angle of outlook<br />

drawn from the ground floor level of Court Mansions would actually be slightly improved<br />

due to the reduction in height of the ground floor level (50% compared to the existing<br />

53%). The proposed third floor level is well set back from the rear boundary (by 10m)<br />

<strong>and</strong> would not impact further on outlook from the rear of Court Mansions. It is not<br />

considered then that the development would unreasonably affect outlook or sense of<br />

enclosure for the occupiers of these flats.<br />

Daylight/Sunlight<br />

3.16 The applicants have carried out a daylight <strong>and</strong> sunlight assessment which<br />

analyses the impact of the proposed development on light conditions at neighbouring<br />

properties, based on the British Research Establishment (BRE) guidelines. Windows to<br />

residential properties within Beavor Lane <strong>and</strong> Court Mansions have been assessed.<br />

Vertical Sky Component (VSC) has been assessed. The analysis shows that none of<br />

the windows closest to the development would experience a noticeable reduction in<br />

daylight (defined as a greater than 20% loss of VSC) apart from the rear facing windows<br />

to the southernmost first floor flat at Court Mansions. Two of the three windows here<br />

would experience a 22% reduction (a kitchen <strong>and</strong> a bathroom window) <strong>and</strong> one window<br />

would experience a 27% reduction (a bedroom window) in VSC. The flat's living room<br />

<strong>and</strong> another bedroom are to the front of the property <strong>and</strong> would be unaffected. As the<br />

kitchen <strong>and</strong> bathroom windows do not serve a habitable room, the relatively small<br />

noticeable loss of daylight is not considered to significantly affect the amenity of the<br />

occupier(s) of the flat. In terms of the bedroom window, the BRE guidelines<br />

acknowledge that bedrooms have a lesser need for daylight than other habitable rooms.<br />

In this case, a good level of daylight would still be achieved within this room (VSC levels<br />

would be reduced from 29.5% to 21.5%). Additionally, information on the Average<br />

Daylight Factor (ADF) for the kitchen <strong>and</strong> bedroom has been submitted. The<br />

calculations show that the ADF for the kitchen would be 2.5% (the BRE guidelines state<br />

a minimum of 2% should be achieved) <strong>and</strong> 1.85% for the bedroom (BRE guidelines are<br />

that 1% should be achieved). It is therefore considered that this flat would continue to<br />

receive adequate daylight as a result of the development <strong>and</strong> the amenity of all<br />

surrounding occupiers would not be unreasonably affected in this regard.


3.17 Neighbouring property has also been assessed in relation to sunlight. All windows<br />

within 90 degrees of due south have been assessed, in accordance with the guidelines.<br />

The analysis indicates that adjacent property would not experience any unacceptable<br />

overshadowing, <strong>and</strong> would be in keeping with the BRE guidance.<br />

3.18 It is therefore considered that the impact of the proposal on daylight <strong>and</strong> sunlight<br />

to neighbouring occupiers is acceptable.<br />

Privacy<br />

3.19 All new windows within the development would be positioned on the same plane<br />

as existing windows on the building. Therefore, whilst there would be a distance of 15m<br />

from the proposed development to the properties opposite on Beavor Lane, <strong>and</strong> a<br />

distance of 7.5m from the rear of Court Mansions, there are already windows facing<br />

these residential properties at this distance. It should be acknowledged, in the case of<br />

the residential properties on Beavor Lane that would face the residential part of the<br />

development instead of the office development, that there would be a different pattern of<br />

use for the proposed residential buildings <strong>and</strong> the rooms would be occupied in the<br />

evening. However, given that it is front facing windows which would be affected, which<br />

already have a lesser degree of privacy since they face the public realm, <strong>and</strong> the fact<br />

that the frontage to frontage difference would replicate a common street pattern for<br />

residential streets, it is not considered that the development would lead to unreasonable<br />

loss of privacy. The second <strong>and</strong> third floor level windows would be above the roof level<br />

of the properties opposite; <strong>and</strong> direct views would not be achieved into the windows of<br />

these properties as a result. It should be noted that in relation to Court Mansions, the<br />

existing office windows would be replaced by another office development as the<br />

proposed residential properties would be built at the rear of the sorting office building<br />

<strong>and</strong> would not directly adjoin the rear boundary with Court Mansions. However, the<br />

applicants have agreed to install obscured-glazed windows (which would be conditioned<br />

- Condition 31) in the rear elevation of the proposed office building, so that the existing<br />

situation with regard to privacy would be improved for the occupiers of Court Mansions.<br />

3.20 Half of the site is positioned opposite the playground of St Peter's primary<br />

school, <strong>and</strong> here the proposal would provide a row of residential houses. Again, it<br />

should be noted that the site is already overlooked by the windows of the existing office<br />

buildings, <strong>and</strong> also that the playground is fully viewable from the public realm. Whilst<br />

there may be a slightly different pattern of use with the residential properties it is not<br />

considered that the proposed use would have a significantly different impact on the use<br />

of the school playground.<br />

3.21 The scheme would incorporate roof terraces for the residential properties at the<br />

rear at first floor level, <strong>and</strong> at main roof level, as well as terraces at the front of the<br />

building at third floor level <strong>and</strong> small 'Juliet' balconies at second floor level. The terraces<br />

to the rear would not overlook any residential property, as they would back on to the<br />

rear wall of the sorting office building. The terraces at main roof level would be set<br />

behind the front pitched roof, such that no overlooking of the properties opposite would<br />

occur. The terraces to the front would not project beyond the existing window wall <strong>and</strong><br />

could not therefore be considered to reduce privacy. The office building would also have<br />

a 12sqm terrace at ground floor level (screened by obscurely glazed privacy screening)<br />

<strong>and</strong> a larger terrace (24sqm) at first floor level. This replicates the existing first floor<br />

level terrace which office workers use, <strong>and</strong> therefore cannot be judged to give rise to


additional loss of privacy to Court Mansions. The development is considered to be in<br />

accordance with Housing Policy 8 of the <strong>Planning</strong> Guidance SPD.<br />

Noise <strong>and</strong> disturbance<br />

3.22 As the larger terraces would be to the rear of the building, it is not considered that<br />

significant noise <strong>and</strong> disturbance would result from their use. The terraces to the front<br />

would measure 8 sqm (9.5 sqm for the commercial premises) <strong>and</strong> the Juliette balconies<br />

would measure 2 sqm. Given the limited size of the terraces, their location adjacent to<br />

the highway, <strong>and</strong> the fact that only two of the proposed eight residential houses would<br />

be directly opposite any residential properties (the rest of the proposed terrace would be<br />

opposite the school playground), it is considered unlikely that the terraces would give<br />

rise to unacceptable noise <strong>and</strong> disturbance for neighbours. The proposal would<br />

introduce a car lift to basement level, <strong>and</strong> the use of this would be considered in the<br />

highways section below. Conditions would be attached to ensure that no noise results<br />

from machinery within the development (Condition 16). It is therefore considered that<br />

the development would not cause undue noise <strong>and</strong> disturbance to neighbouring<br />

residents, in accordance with Policy CC4 <strong>and</strong> Amenity Policy 24 of the <strong>Planning</strong><br />

Guidance SPD.<br />

QUALITY of ACCOMMODATION<br />

3.23 The proposal would provide eight four-bedroom residential units with floor areas of<br />

between 223 sqm <strong>and</strong> 231 sqm. These sizes are well in excess of the Mayor's Housing<br />

Design guidelines <strong>and</strong> Policy 3.5 of The London Plan 2011. None of the dwellings would<br />

have all of its habitable rooms facing in a northerly direction (the dwellings have an<br />

east-west aspect on the upper floors, with the ground floor being single aspect to the<br />

front, with the rear kitchen area lit with a rooflight). All dwellings would have areas of<br />

private amenity space totalling over 67 sqm. <strong>Planning</strong> Guidance SPD Housing Policy 1<br />

<strong>and</strong> the Mayor's requires family sized dwellings to have access to at least 36sqm of<br />

amenity space, <strong>and</strong> St<strong>and</strong>ard 4.10.1 of the Mayor's Housing SPD 2012 requires up to<br />

11sqm for a four bedroom house, <strong>and</strong> so the scheme would significantly exceed these<br />

requirements. It is considered that the proposed development would provide large<br />

dwellings with a satisfactory st<strong>and</strong>ard of living for all potential occupants, <strong>and</strong> would be<br />

in compliance with the Council's <strong>and</strong> the Mayor's st<strong>and</strong>ards for residential<br />

accommodation.<br />

Accessibility<br />

3.24 Design Policy 1 of the <strong>Planning</strong> Guidance SPD states that 'applications for new<br />

buildings - should ensure that the building is designed to be accessible <strong>and</strong> inclusive to<br />

all who may use or visit the building - including identifying potential barriers to<br />

accessibility <strong>and</strong> how these can be overcome, <strong>and</strong> how accessibility can be managed<br />

when the building is in use'. Core Strategy Policy H4 requires all residential,<br />

developments to conform to Lifetime Homes st<strong>and</strong>ards. For design reasons it is<br />

considered more desirable that the ground floor level would be raised above street level<br />

to provide elegance to the buildings <strong>and</strong> additional privacy for the occupiers. A level<br />

threshold would be provided from the entrance to the dwellings into a lobby, where the<br />

rest of the ground floor would be accessed via three steps. There would be space here<br />

to install a wheelchair lift to gain access to the raised ground floor <strong>and</strong> a wiring<br />

installation would be installed for this purpose. Once inside, the dwellings would be<br />

adaptable internally with 'soft spots' in the upper floor for a potential through-the-floor lift<br />

access between ground <strong>and</strong> first floors. It is considered that the development complies<br />

with Core Strategy Policy H4 <strong>and</strong> Lifetime Homes requirements.


3.25 The office would have a lift from the basement to all floor levels <strong>and</strong> a level<br />

entrance to the street would be provided. It is considered that this building would be<br />

designed to be accessible, in accordance with Policy DM G1 of the DM Local Plan <strong>and</strong><br />

Design Policy 1 of the <strong>Planning</strong> Guidance SPD. A condition (Condition 9) will be<br />

attached to ensure that all proposed measures to comply with accessibility requirements<br />

are implemented.<br />

HIGHWAYS<br />

Traffic Generation<br />

3.26 The existing office/warehouse site, with its substantial loading bay <strong>and</strong> parking<br />

space for a private car, has the potential to generate a significant amount of vehicular<br />

traffic. The applicants estimate, based on surveys <strong>and</strong> records from the current<br />

occupiers, that the site currently generates 15-20 daily movements by lorries, <strong>and</strong><br />

approximately 5 movements by private car in both the AM <strong>and</strong> PM peak. The<br />

development would provide a replacement office use, with one designated parking<br />

space, <strong>and</strong> eight residential units with one parking space each. It can be assumed,<br />

then, that the vehicle trips associated with the proposed office use would be similar or<br />

lower, whilst the trips associated with the warehouse <strong>and</strong> loading bay would be<br />

completely removed. Data from comparable sites suggests that the proposed residential<br />

use would be expected to generate around 5 movements by private car in the AM <strong>and</strong><br />

PM peak. Therefore, the overall traffic generation would be expected to be significantly<br />

less than the existing lawful use of the site.<br />

Car parking <strong>and</strong> car lift<br />

3.27 The parking would be provided in the new basement storey, <strong>and</strong> accessed by<br />

car lift, as the dimensions of the site could not accommodate a ramp to basement level.<br />

In terms of the level of parking, Policy DM J2 of the Local Plan <strong>and</strong> London Plan's<br />

parking st<strong>and</strong>ards in Table 6.2 state that dwellings with 4 or more bedrooms should<br />

have a maximum of 1.5 - 2 spaces per dwelling, although in areas of good transport<br />

accessibility developments should aim for significantly less than 1 space per unit. The<br />

site is within PTAL 4 which is not the highest public transport accessibility, <strong>and</strong> given the<br />

benefits in reducing traffic generation of removing the existing use, it is considered that<br />

one parking space per unit is acceptable in this instance. It would be a condition of a<br />

planning approval that the residential dwellings are not entitled to a residents' parking<br />

permit, to avoid placing further stress on the on-street parking conditions. This will be<br />

secured as part of the S106 legal agreement.<br />

3.28 The car lift would be accessed towards the north of the site, adjacent to the<br />

proposed office building, <strong>and</strong> would utilise part of the existing vehicle crossover. The<br />

visibility splays of the lift have been assessed by officers <strong>and</strong> found to be acceptable.<br />

The car lift would be positioned within the building lines of the new building, which would<br />

help to shield any noise arising from the use of the lift. The applicants have carried out a<br />

night time survey of existing background noise, measured at the facades of the nearest<br />

residential properties, <strong>and</strong> compared this to the noise output of the car lift. The noise<br />

associated with the car lift would be from the motor powering the hydraulics; there<br />

would be little noise from the shaft itself. The motor would have a noise output of up to<br />

80dB but would be positioned within the basement, significantly shielding any audible<br />

noise, <strong>and</strong> acoustic attenuation would be applied to the ventilation louvre within the<br />

plant room. Taking this into account, <strong>and</strong> allowing for the anti-vibration treatment that<br />

would also be applied to the plant, the noise from the car lift would be more than 10dB<br />

lower than the lowest existing background noise levels (which were recorded at 43dB),


which is in accordance with the Council's requirements. Full details of the operation of<br />

the car lift would be required by condition (Conditions 14, 16 <strong>and</strong> 34). It is not therefore<br />

considered that the installation of the car lift would cause noise <strong>and</strong> disturbance to<br />

neighbouring residents or the future occupiers of the dwellings.<br />

3.29 In terms of the impact on the highway, the applicants have confirmed that one<br />

cycle of the car lift would take approximately two <strong>minutes</strong>, <strong>and</strong> when the lift is not in<br />

operation it would return to a st<strong>and</strong>by position at street level. Although the use of the lift<br />

would potentially involve cars entering the development having to wait on Beavor Lane<br />

whilst another car used the lift, given the small number of parking spaces within the<br />

development <strong>and</strong> the fact that at peak times, vehicles would generally be travelling to<br />

<strong>and</strong> from the development in the same direction, such occurrences should be pretty<br />

infrequent. It is therefore considered that the inclusion of a car lift to access the<br />

development is acceptable in this instance <strong>and</strong> in accordance with <strong>Planning</strong> Guidance<br />

SPD Transport Policy 33. Full details of the dimensions <strong>and</strong> operation of the car lift<br />

would be required by condition (Condition 34)<br />

3.30 The proposal would involve works to the highway to remove redundant crossovers<br />

<strong>and</strong> to restore the pavement to Streetsmart st<strong>and</strong>ards. The funding for the highways<br />

works, to be undertaken by Council contractors, would be secured within a S106<br />

agreement.<br />

Cycle Parking<br />

3.31 Thirty five cycle parking spaces would be provided at basement level; 19 for the<br />

office use <strong>and</strong> 16 for the dwellings. This is in compliance with the Council's cycle<br />

parking st<strong>and</strong>ards in DMLP Policy DM J5 which state that Class B1 uses should have 1<br />

space per 50sqm (16 spaces required in this instance) <strong>and</strong> 2 spaces per dwelling with<br />

three or more bedrooms (16 spaces required in this instance). The permanent provision<br />

of cycle storage would be conditioned (Condition 12).<br />

Refuse storage<br />

3.32 Individual storage enclosures for refuse <strong>and</strong> recycling would be provided within the<br />

front gardens for each of the dwellings. A refuse <strong>and</strong> recycling storage area would be<br />

provided at basement level for the commercial unit. The amount of storage provided has<br />

been assessed <strong>and</strong> is considered to be satisfactory for the requirements of the<br />

development, <strong>and</strong> in accordance with Policy DM H5 of the DM LP 2013. A condition<br />

would be attached to ensure that the refuse provision is provided in accordance with the<br />

Council's policies (Condition 11). Refuse would be collected via the usual weekly<br />

Council collections.<br />

Construction <strong>and</strong> Demolition<br />

3.33 It is recognised that the site is on a narrow roadway, close to residential <strong>and</strong><br />

school uses. Demolition <strong>and</strong> construction vehicles would therefore need to be carefully<br />

managed in order to avoid conflict with other highways users. <strong>Meetings</strong> have been held<br />

with officers to discuss the potential logistics, <strong>and</strong> full details of this would be required to<br />

be submitted as part of a Construction <strong>and</strong> Demolition Management Plan (condition 3).<br />

ENVIRONMENTAL<br />

Flood Risk <strong>and</strong> Sustainability<br />

3.34 The site is located within the Environment Agency's (EA's) Flood Zones 2 <strong>and</strong> 3<br />

<strong>and</strong> the proposal would introduce residential use on a site previously used for


commercial purposes. A Flood Risk Assessment has therefore been submitted with the<br />

application. Although Flood Zone 3 is classified as having a high risk of flooding from<br />

the River Thames, this area is protected by the Thames Barrier <strong>and</strong> river walls. These<br />

defend the site to a 1 in 1000 year annual probability of river flooding in any year<br />

(


on its merits <strong>and</strong> reach a decision based on whether the application accords with the<br />

relevant development plan, unless material considerations indicate otherwise. This<br />

development will be liable for the payment of Mayoral CIL at a rate of £50psqm for the<br />

additional floorspace.<br />

S106 Legal agreement<br />

3.40 The development would be subject to a legal agreement requiring the following:<br />

- Development to be parking permit free<br />

- Funding for the works to the public highway, including alterations to the existing<br />

crossover <strong>and</strong> footway <strong>and</strong> resurfacing of the entrance to the site<br />

- Submission of a Workplace Travel Plan for the office use, with monitoring fee of<br />

£2,000, to be reviewed on 1st, 3rd <strong>and</strong> 5th anniversaries.<br />

4.0 CONCLUSION <strong>and</strong> RECOMMENDATION<br />

4.1 It is considered that the proposed development would be appropriate in terms of<br />

l<strong>and</strong> use, design <strong>and</strong> scale, <strong>and</strong> would not cause demonstrable harm to the amenities of<br />

neighbouring residents to justify the refusal of planning permission. The proposal would<br />

enhance the existing appearance of the street scene <strong>and</strong> the adjacent conservation<br />

area. The development would not impact significantly on the highway network <strong>and</strong> local<br />

parking conditions. Sustainability, flood risk <strong>and</strong> contaminated l<strong>and</strong> matters are<br />

considered to be acceptable<br />

4.2 In view of the above it is therefore recommended that planning permission be<br />

granted subject to condition(s) set out above <strong>and</strong> the completion of a satisfactory legal<br />

agreement.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Avonmore And Brook Green<br />

Site Address:<br />

Spring Vale Estate Ceylon Road London W14 0PY<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/01865/FR3<br />

Date Valid:<br />

09.05.2013<br />

Committee Date:<br />

31.07.2013<br />

Case Officer:<br />

Neil Egerton<br />

Conservation Area:<br />

: Lakeside/Sinclair/Blythe Road Conservation Area<br />

- Number 36


Applicant:<br />

Mr Eric Holroyd<br />

Housing & Regeneration 3rd Floor, Hammersmith Town Hall Ext. Hammersmith<br />

W6 9JU<br />

Description:<br />

Redevelopment comprising erection of a four storey building providing 8 flats (2 x 1 bed,<br />

6 x 2 bed) together with two, 2 storey 3 bedroom dwelling houses; with associated<br />

parking, l<strong>and</strong>scaping, <strong>and</strong> alterations to the existing footpath <strong>and</strong> vehicle access,<br />

following demolition of four garages<br />

Drg Nos: AECOM Geotechnical <strong>and</strong> Geo-Environmental Assessment: Spring Vale,<br />

Dated May 2013,SV-FP - 1, 2, 3, 4, 5, SV-RP - 1, SV-EL - 1, 2, 3, 4,SV-SE - 1, SV-LA -<br />

1, 2, SV-AA - 1, SV-TP - 1.Sustainability Statement Spring Vale Dated May 2013 ,Tree<br />

Survey Report Spring Vale Dated May 2013External Noise Assessment Spring Vale<br />

Dated May 2013Energy Statement Spring Vale Dated May 2013<br />

Application Type:<br />

Full Regulation 3 - LBHF is Developer<br />

Officer Recommendation:<br />

That the application be approved subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) The development shall be carried out <strong>and</strong> completed in accordance with the<br />

following approved drawings: SV-FP - 1, 2, 3, 4, 5, SV-RP - 1, SV-EL - 1, 2, 3, 4,<br />

SV-SE - 1, SV-LA - 1, 2, SV-AA - 1, SV-TP - 1.<br />

In order to ensure full compliance with the planning application hereby approved<br />

<strong>and</strong> to prevent harm arising through deviations from the approved plans, in<br />

accordance with policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, <strong>and</strong> 7.21 of the London Plan<br />

<strong>and</strong> policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan<br />

2013 <strong>and</strong> policy BE1 of the Core Strategy 2011.<br />

3) Prior to commencement of the development hereby approved, a Demolition<br />

Management Plan, a Construction Logistics Plan <strong>and</strong> a Construction Management<br />

Plan shall be submitted to <strong>and</strong> approved in writing by the Council. Details shall<br />

include control measures for dust, noise, vibration, lighting, delivery locations,<br />

restriction of hours of work <strong>and</strong> all associated activities audible beyond the site<br />

boundary to 0800-1800hrs Mondays to Fridays <strong>and</strong> 0800-1300hrs on Saturdays,<br />

advance notification to neighbours <strong>and</strong> other interested parties of proposed works<br />

<strong>and</strong> public display of contact details including accessible phone contact to persons<br />

responsible for the site works for the duration of the works. The details shall also<br />

include the numbers, size <strong>and</strong> routes of demolition <strong>and</strong> construction vehicles,


provisions within the site to ensure that all vehicles associated with the<br />

construction works are properly washed <strong>and</strong> cleaned to prevent the passage of<br />

mud <strong>and</strong> dirt onto the highway, <strong>and</strong> other matters relating to traffic management to<br />

be agreed. Approved details shall be implemented throughout the project period.<br />

To ensure that construction works do not adversely impact on the operation of the<br />

public highway, <strong>and</strong> that the amenity of occupiers of surrounding premises is not<br />

adversely affected by noise, vibration, dust, lighting or other emissions from the<br />

building site, in accordance with Policies DM J1, DM J6, DM H9, DM H11 of the<br />

Development Management Local Plan 2013.<br />

4) No development shall commence until a scheme for temporary fencing <strong>and</strong>/or<br />

enclosure of the site where necessary has been submitted to <strong>and</strong> approved in<br />

writing by the Council, <strong>and</strong> such enclosure has been erected in accordance with<br />

the approved details <strong>and</strong> retained for the duration of the building works. No part of<br />

the temporary fencing <strong>and</strong>/or enclosure of the site shall be used for the display of<br />

advertisement hoardings.<br />

To ensure a satisfactory external appearance of the site, in accordance with<br />

policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan 2013<br />

<strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

5) The development hereby permitted shall not commence until particulars <strong>and</strong><br />

samples of materials to be used in all external faces <strong>and</strong> roof coverings of the<br />

building (including colour <strong>and</strong> sample of render), have been submitted <strong>and</strong><br />

approved in writing by the Council. The development shall be carried out in<br />

accordance with the approved details.<br />

To ensure a satisfactory external appearance, in accordance with Policies DM G1<br />

<strong>and</strong> DM G7 of the Development Management Local Plan 2013, <strong>and</strong> Policy BE1 of<br />

the Core Strategy 2011.<br />

6) The development shall not commence until detailed drawings of a typical bay on<br />

the front elevations of the new buildings in plan, section <strong>and</strong> elevation at a scale of<br />

no less than 1:20 are submitted in writing for the Council's approval prior to<br />

construction commencing <strong>and</strong> built in accordance with the approved drawings.<br />

To ensure a satisfactory external appearance <strong>and</strong> prevent harm to the street<br />

scene, in accordance with Policies DM G1 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan 2013 <strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

7) No alterations shall be carried out to the external appearance of the building,<br />

including the installation of air-conditioning units, ventilation fans or extraction<br />

equipment not shown on the approved drawings, without planning permission first<br />

being obtained. Any such changes shall be carried out in accordance with the<br />

approved details.<br />

To ensure a satisfactory external appearance <strong>and</strong> to prevent harm to the<br />

amenities of the occupiers of neighbouring residential properties, in accordance<br />

with Policies DM G1 <strong>and</strong> DM G7 of the Development Management Local Plan<br />

2013, <strong>and</strong> Policy BE1 of the Core Strategy 2011.


8) The development shall not commence until a statement of how "Secured by<br />

Design" requirements are to be adequately achieved has been submitted to <strong>and</strong><br />

approved in writing by the Council. The approved details shall be carried out prior<br />

to occupation of the development hereby approved <strong>and</strong> permanently maintained<br />

thereafter.<br />

To ensure a safe <strong>and</strong> secure environment for users of the development, in<br />

accordance with policy DM G1 of the Development Management Local Plan 2013.<br />

9) Prior to commencement of the development hereby approved, details <strong>and</strong><br />

drawings at a scale of 1:100 demonstrating the flats within the development's<br />

compliance with the Lifetimes Home st<strong>and</strong>ards shall be submitted to <strong>and</strong> approved<br />

in writing by the Council. The development shall be carried out in accordance with<br />

such details as approved <strong>and</strong> permanently retained thereafter.<br />

To ensure that the new flats are built to `Lifetime Homes' st<strong>and</strong>ards, in accordance<br />

with Policy H4 of the Core Strategy 2011, Policy 3.8 of The London Plan (2011)<br />

<strong>and</strong> Policy DM A4 of the Development Management Local Plan 2013.<br />

10) Notwithst<strong>and</strong>ing the provisions of the Town <strong>and</strong> Country <strong>Planning</strong> (General<br />

Permitted Development) Order 1995 (or any Order revoking or re-enacting that<br />

Order with or without modification), no aerials, antennae, satellite dishes or related<br />

telecommunications equipment shall be erected on any part of the development<br />

hereby permitted, without planning permission first being obtained.<br />

To ensure that that the visual impact of telecommunication equipment can be<br />

considered in accordance with Policies DM G1 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan 2013.<br />

11) The development shall not be occupied before the refuse storage arrangements<br />

hereby approved, including provision for the storage of recyclable materials, have<br />

been implemented. All refuse/recycling generated by the development hereby<br />

approved shall be stored within the approved areas. These areas shall be<br />

permanently retained for this use.<br />

To ensure the satisfactory provision of refuse storage <strong>and</strong> recycling, in accordance<br />

with policy DM H5 of the Development Management Local Plan 2013.<br />

12) The development shall not be occupied until the cycle storage arrangements<br />

indicated on approved drawing SV-FP-1 have been provided <strong>and</strong> completed; <strong>and</strong><br />

the facilities shall be retained thereafter for the lifetime of the development.<br />

To ensure the suitable provision of cycle parking within the development to meet<br />

the needs of future site occupiers <strong>and</strong> users, in accordance with policies 6.9 <strong>and</strong><br />

6.13 of the London Plan 2011 <strong>and</strong> policy DM J5 of the Development Management<br />

Local Plan 2013.<br />

13) With the exception of the terrace areas indicated on the approved drawings, no<br />

part of any other roof of the approved buildings shall be used as a terrace or other<br />

amenity space.


To safeguard the amenities of the occupiers of neighbouring properties, <strong>and</strong> to<br />

avoid overlooking <strong>and</strong> loss of privacy <strong>and</strong> the potential for additional noise <strong>and</strong><br />

disturbance, in accordance with Policy DM H9 <strong>and</strong> DM A9 of the Development<br />

Management Local Plan 2013.<br />

14) The sound proofing details identified within the External Noise Assessment Spring<br />

Vale Dated May 2013 shall be implemented prior to the occupation of the<br />

residential units hereby approved, <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of the development site are not adversely<br />

affected by noise from transport [industrial/ commercial noise sources], in<br />

accordance with Policy DM H9 of the Development Management Local Plan 2013.<br />

15) Prior to commencement of the development, details shall be submitted to <strong>and</strong><br />

approved in writing by the Council, of an enhanced sound insulation value DnT,w<br />

<strong>and</strong> LnT,w for the floor/ceiling/ wall structures separating different types of rooms/<br />

uses in adjoining dwellings. The details as approved shall be implemented prior to<br />

occupation of the development <strong>and</strong> thereafter be permanently retained.<br />

To ensure that the amenity of occupiers of the development site is not adversely<br />

affected by noise, in accordance with Policies H11, DM H9 of the Development<br />

Management Local Plan 2013.<br />

16) The development hereby permitted shall not commence until further details of a<br />

Sustainable Urban Drainage System (SUDS), including maintenance programme<br />

have been submitted to <strong>and</strong> approved in writing by the council. The SUDS scheme<br />

shall be implemented in accordance with the approved details prior to occupation<br />

of the development hereby permitted, <strong>and</strong> thereafter permanently retained <strong>and</strong><br />

maintained in line with the agreed plan.<br />

To ensure that surface water run-off is managed in a sustainable manner, in<br />

accordance with policy 5.13 of The London Plan 2011, Policy CC2 of the Core<br />

Strategy 2011 <strong>and</strong> policy DM H3 of the Development Management Local Plan<br />

2013.<br />

17) The development hereby permitted shall not be occupied before implementation of<br />

the energy efficiency <strong>and</strong> renewable energy measures detailed in the submitted<br />

Energy Statement Spring Vale Dated May 2013. All details shall be implemented<br />

prior to occupation or use of the development hereby permitted, <strong>and</strong> thereafter<br />

permanently retained.<br />

To ensure a satisfactory external appearance <strong>and</strong> the integration of energy<br />

generation from renewable sources, consistent with the Mayor's sustainable<br />

design objectives in accordance with Policies DM G1<strong>and</strong> DM H1 of the<br />

Development Management Local Plan 2013, Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The<br />

London Plan (2011), <strong>and</strong> Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />

18) The development hereby permitted shall not be occupied before implementation of<br />

the sustainable design <strong>and</strong> construction measures detailed in the submitted<br />

Sustainability Statement Spring Vale Dated May 2013. All details shall be<br />

implemented prior to occupation or use of the development hereby permitted, <strong>and</strong><br />

thereafter permanently retained.


To ensure a satisfactory external appearance <strong>and</strong> the integration of energy<br />

generation from renewable sources, consistent with the Mayor's sustainable<br />

design objectives in accordance with Policies DM G1, DM H2 of the Development<br />

Management Local Plan 2013 <strong>and</strong> Policies 5.1, 5.2, 5.3 <strong>and</strong> 5.7 of The London<br />

Plan (2011), <strong>and</strong> Core Strategy (2011) Policies BE1 <strong>and</strong> CC1.<br />

19) No development shall commence until a site investigation scheme, to substantiate<br />

the preliminary findings of the AECOM Geotechnical <strong>and</strong> Geo-Environmental<br />

Assessment Report (dated May 2013) submitted with application 2013/01865/FR3,<br />

is submitted to <strong>and</strong> approved in writing by the Council. This scheme shall be<br />

based upon <strong>and</strong> target the risks identified in the preliminary risk assessment <strong>and</strong><br />

shall provide provisions for, where relevant, the sampling of soil, soil vapour,<br />

ground gas, surface <strong>and</strong> groundwater . All works must be carried out in<br />

compliance with <strong>and</strong> by a competent person who conforms to CLR 11: Model<br />

Procedures for the Management of L<strong>and</strong> Contamination (Defra 2004) or the<br />

current UK requirements for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the Development<br />

Management Local Plan 2013.<br />

20) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, following a site investigation undertaken in compliance with the<br />

approved site investigation scheme, a quantitative risk assessment report is<br />

submitted to <strong>and</strong> approved in writing by the Council. This report shall: assess the<br />

degree <strong>and</strong> nature of any contamination identified on the site through the site<br />

investigation; include a revised conceptual site model from the preliminary risk<br />

assessment based on the information gathered through the site investigation to<br />

confirm the existence of any remaining pollutant linkages <strong>and</strong> determine the risks<br />

posed by any contamination to human health, controlled waters <strong>and</strong> the wider<br />

environment. All works must be carried out in compliance with <strong>and</strong> by a competent<br />

person who conforms to CLR 11: Model Procedures for the Management of L<strong>and</strong><br />

Contamination (Defra 2004) or the current UK requirements for sampling <strong>and</strong><br />

testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the Development<br />

Management Local Plan 2013.<br />

21) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until, a remediation method statement is submitted to <strong>and</strong> approved in<br />

writing by the Council. This statement shall detail any required remediation works<br />

<strong>and</strong> shall be designed to mitigate any remaining risks identified in the approved<br />

quantitative risk assessment. All works must be carried out in compliance with <strong>and</strong>


y a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the Development<br />

Management Local Plan 2013.<br />

22) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until the approved remediation method statement has been carried out<br />

in full <strong>and</strong> a verification report confirming these works has been submitted to, <strong>and</strong><br />

approved in writing, by the Council. This report shall include: details of the<br />

remediation works carried out; results of any verification sampling, testing or<br />

monitoring including the analysis of any imported soil; all waste management<br />

documentation showing the classification of waste, its treatment, movement <strong>and</strong><br />

disposal; <strong>and</strong> the validation of gas membrane placement. If, during development,<br />

contamination not previously identified is found to be present at the site, the<br />

Council is to be informed immediately <strong>and</strong> no further development (unless<br />

otherwise agreed in writing by the Council) shall be carried out until a report<br />

indicating the nature of the contamination <strong>and</strong> how it is to be dealt with is<br />

submitted to, <strong>and</strong> agreed in writing by, the Council. Any required remediation shall<br />

be detailed in an amendment to the remediation statement <strong>and</strong> verification of<br />

these works included in the verification report. All works must be carried out in<br />

compliance with <strong>and</strong> by a competent person who conforms to CLR 11: Model<br />

Procedures for the Management of L<strong>and</strong> Contamination (Defra 2004) or the<br />

current UK requirements for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks<br />

are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the Development<br />

Management Local Plan 2013.<br />

23) Unless the Council agree in writing that a set extent of development must<br />

commence to enable compliance with this condition, no development shall<br />

commence until an onward long-term monitoring methodology report is submitted<br />

to <strong>and</strong> approved in writing by the Council where further monitoring is required past<br />

the completion of development works to verify the success of the remediation<br />

undertaken. A verification report of these monitoring works shall then be submitted<br />

to <strong>and</strong> approved in writing by the Council when it may be demonstrated that no<br />

residual adverse risks exist. All works must be carried out in compliance with <strong>and</strong><br />

by a competent person who conforms to CLR 11: Model Procedures for the<br />

Management of L<strong>and</strong> Contamination (Defra 2004) or the current UK requirements<br />

for sampling <strong>and</strong> testing.<br />

Potentially contaminative l<strong>and</strong> uses (past or present) are understood to occur at,<br />

or near to, this site. This condition is required to ensure that no unacceptable risks


are caused to humans, controlled waters or the wider environment during <strong>and</strong><br />

following the development works, in accordance with Borough Wide Strategic<br />

Policy CC4 of the Core Strategy <strong>and</strong> policies DM H7 <strong>and</strong> H11 of the Development<br />

Management Local Plan 2013.<br />

24) The development shall not be occupied prior to the highway alterations on the<br />

Ceylon Road junction. Any changes to the vehicular access layout, will have to be<br />

undertaken by the council's contractor, <strong>and</strong> the applicant will have to pay for all<br />

expenses in relation to this. Estimate costs for the above work can be obtained<br />

from a highway officer on 020 8753 3070.<br />

In order to prevent harm arising through deviations from the approved plans, in<br />

accordance with policy DM G1, DM G7 <strong>and</strong> DM J1 of the Development<br />

Management Local Plan 2013.<br />

25) Prior to commencement of the works above ground hereby permitted, details of<br />

the hard <strong>and</strong> soft l<strong>and</strong>scaping of all areas external to the building, including<br />

planting <strong>and</strong> paving, detailed drawings at a scale of not less than 1:20 of fences,<br />

gates <strong>and</strong> other means of enclosure shall have been submitted to <strong>and</strong> approved in<br />

writing by the Council, <strong>and</strong> the development shall not be used until such hard<br />

l<strong>and</strong>scaping as is approved has been carried out. Soft l<strong>and</strong>scaping shall be carried<br />

out during the first planting season available. Any soft l<strong>and</strong>scaping removed or<br />

severely damaged, dying or becoming seriously diseased within 5 years of<br />

planting shall be replaced with a tree or shrub of similar size <strong>and</strong> species to that<br />

originally required to be planted.<br />

To ensure a satisfactory external appearance <strong>and</strong> satisfactory provision for<br />

permeable surfaces in accordance with policies DM G7 <strong>and</strong> DM G1 of the<br />

Development Management Local Plan 2013, <strong>and</strong> policy BE1 of the Core Strategy<br />

2011.<br />

26) No construction shall take place until the trees on/adjacent to the site are<br />

adequately protected as per BS5837:2013, <strong>and</strong> the details within the Tree Survey<br />

Report Spring Vale Dated May 2013.<br />

To ensure that trees on site are retained <strong>and</strong> to prevent harm during the course of<br />

construction, in accordance with policies DM G7 <strong>and</strong> DM E4 of the Development<br />

Management Local Plan 2013, <strong>and</strong> policy BE1 of the Core Strategy (2011).<br />

27) No occupier of the development hereby permitted, with the exception of disabled<br />

persons who are blue badge holders, shall apply to the council for a parking permit<br />

or retain such a permit <strong>and</strong> if such a permit is issued it shall be surrendered to the<br />

Council within seven days of written dem<strong>and</strong>.<br />

In order to ensure that the development does not harm the existing amenities of<br />

the occupiers of neighbouring residential properties by adding to the already high<br />

level of on-street car parking stress in the area, in accordance with policies DM J1<br />

<strong>and</strong> DM J2 of the Development Management Local Plan 2013.<br />

28) The development hereby permitted shall not be occupied until such time as a<br />

scheme has been submitted to <strong>and</strong> approved in writing by the local planning<br />

authority to ensure that all occupiers, other than those with disabilities who are


lue badge holders, have no entitlement to parking permits from the council <strong>and</strong> to<br />

ensure that occupiers are informed, prior to occupation, of such restriction. The<br />

development shall not be used otherwise than in accordance with the approved<br />

scheme unless prior written agreement is issued by the council.<br />

In order that the prospective occupiers of the units are made aware of the fact that<br />

they will not be entitled to an on-street car parking permit, in the interests of the<br />

proper management of parking, <strong>and</strong> to ensure that the development does not<br />

harm the existing amenities of the occupiers of neighbouring residential properties<br />

by adding to the already high level of on-street car parking stress in the area, in<br />

accordance with policies DM J1 <strong>and</strong> DM J2 of the Development Management<br />

Local Plan 2013.<br />

29) The development hereby permitted shall not be occupied until such time as a<br />

scheme has been submitted to <strong>and</strong> approved in writing by the local planning<br />

authority to ensure that all occupiers, other than those with disabilities who are<br />

blue badge holders, have no entitlement to parking permits from the council <strong>and</strong> to<br />

ensure that occupiers are informed, prior to occupation, of such restriction. The<br />

development shall not be used otherwise than in accordance with the approved<br />

scheme unless prior written agreement is issued by the council.<br />

In order that the prospective occupiers of the flats are made aware of the fact that<br />

they will not be entitled to an on-street car parking permit, in the interests of the<br />

proper management of parking, <strong>and</strong> to ensure that the development does not<br />

harm the existing amenities of the occupiers of neighbouring residential properties<br />

by adding to the already high level of on-street car parking stress in the area, in<br />

accordance with policies DM J1 <strong>and</strong> DM J2 of the Development Management<br />

Local Plan 2013.<br />

30) The development shall not commence until a car parking management plan has<br />

been submitted to <strong>and</strong> approved in writing by the council. This shall provide details<br />

of where existing tenants with a right to park within the development site would be<br />

able to park during the implementation of the planning approval; <strong>and</strong> a strategy to<br />

ensure that the approved details are implemented for the duration of the works.<br />

In order to ensure that existing tenants who have a right to park within the site are<br />

not disadvantaged by the redevelopment <strong>and</strong> have facilities to park adjacent to, or<br />

within reasonable distance of, the site, in accordance with policy DM J2 of the<br />

Development Management Local Plan 2013.<br />

31) Prior to the development hereby approved being occupied, full details of the<br />

screening proposed for the roof terraces including fixings, <strong>and</strong> samples, shall be<br />

submitted to <strong>and</strong> approved in writing by the Council. The use of the terraces shall<br />

not commence until the screens as approved have been installed <strong>and</strong> they shall<br />

be permanently retained thereafter.<br />

In order to ensure a satisfactory external appearance <strong>and</strong> ensure no overlooking<br />

or loss of privacy in accordance with <strong>Planning</strong> Guidance Supplementary <strong>Planning</strong><br />

Document 2013 - Housing Policy 8.<br />

32) The development shall not commence until a car parking management plan,<br />

including allocation of spaces, has been submitted to <strong>and</strong> approved in writing by


the council. The approved details shall be retained thereafter for the lifetime of the<br />

development.<br />

In order to ensure that parking is adequately controlled within the development, in<br />

accordance with policy DM J2 of the Development Management Local Plan 2013.<br />

Justification for Approving the Application:<br />

1) 1. L<strong>and</strong> Use: The proposed development would achieve a sustainable<br />

development with efficient use of brownfield l<strong>and</strong>. The proposal would provide a<br />

mix of family <strong>and</strong> non family units <strong>and</strong> contribute to much needed additional<br />

affordable housing, in accordance with Core Strategy Policies H1 <strong>and</strong> H2, London<br />

Plan Policies 3.3 B, 3.11, 3.12 <strong>and</strong> 3.13, <strong>and</strong> policies DM A1 <strong>and</strong> A3 of the<br />

Development Management Local Plan 2013.<br />

2. Housing mix: The proposed development would contribute too much<br />

needed additional housing, <strong>and</strong> would help the borough meet its housing targets,<br />

in accordance with London Plan Policies 3.3 <strong>and</strong> 3.4. The proposed tenure, which<br />

would comprise of six intermediate <strong>and</strong> four market housing units at this site is<br />

considered acceptable. In the context of London Plan policies, the tenure mix is<br />

considered to be acceptable, taking into account the objectives of encouraging<br />

residential development, <strong>and</strong> the individual circumstances of the site. In this<br />

respect no objection is raised under London Plan Policy 3.3B. The housing<br />

brought forward by the development would also be an appropriate mix having<br />

regard to the objective of securing family <strong>and</strong> non family units in accordance with<br />

DM LP 2013 policies DM A1 <strong>and</strong> DM A3, together with Core Strategy H4. The<br />

internal design <strong>and</strong> layout of the new residential units are considered satisfactory<br />

having regard to Mayors Design Guidelines, <strong>and</strong> London Plan Policy 3.5 <strong>and</strong> table<br />

3.3, together with policies DM A2 <strong>and</strong> DM A9 of the Development Management<br />

Local Plan 2013.<br />

3. Density: The proposal is of an acceptable density which would optimise the<br />

potential of the site <strong>and</strong> would be compatible with the local character <strong>and</strong> context<br />

<strong>and</strong> with public transport capacity. The proposal thereby satisfies London Plan<br />

Policy 3.4, Core Strategy H3 <strong>and</strong> policy DM A2 of the Development Management<br />

Local Plan 2013.<br />

4. Design: The development is considered to comply with Development<br />

Management Local Plan 2013 Policies DM G1, DM G7 <strong>and</strong> Core Strategy 2011<br />

Policy BE1, which requires a high st<strong>and</strong>ard of design in all developments,<br />

compatible with the scale <strong>and</strong> character of existing development <strong>and</strong> its setting,<br />

<strong>and</strong> London Plan policies 7.1, 7.2, 7.4, 7.5, 7.6 which seek a high quality in design<br />

<strong>and</strong> architecture, requiring new developments to have regard to the pattern <strong>and</strong><br />

grain of existing development. The proposal would preserve <strong>and</strong> enhance the<br />

character <strong>and</strong> appearance of the conservation area in accordance with the<br />

policies detailed above.<br />

5. Residential Amenity: The impact of the proposed development upon<br />

adjoining occupiers is considered acceptable. The proposal would not have an<br />

unacceptably harmful impact on neighbouring residential amenity in terms of light,<br />

outlook or privacy <strong>and</strong> noise <strong>and</strong> disturbance. In this regard, the development<br />

would respect the principles of good neighbourliness, <strong>and</strong> would therefore be


acceptable in accordance with Policy DM H9 <strong>and</strong> SPD Housing Policy 8 of the<br />

Development Management Local Plan 2013.<br />

6. Access & Safety: The development would provide a safe <strong>and</strong> secure<br />

environment for all users, <strong>and</strong> would provide ease of access for all people,<br />

including disabled people, in accordance with in accordance with Policy DM A4 of<br />

the Development Management Local Plan 2013, London Plan Policies 3.8 <strong>and</strong> 7.2.<br />

7. Highways matters: It has been demonstrated that the scheme would not<br />

have a significant further impact on the highway network or local parking<br />

conditions <strong>and</strong> is thus considered to be acceptable. Satisfactory provision would<br />

be made for cycle parking <strong>and</strong> future occupiers would be prevented from obtaining<br />

on-street parking permits by way of conditions, to help prevent overspill of parking<br />

onto the local highways. There are available public transport <strong>and</strong> other services<br />

nearby <strong>and</strong> adequate provision for storage <strong>and</strong> collection of refuse <strong>and</strong> recyclables<br />

would be provided. The development thereby accords with Development<br />

Management Local Plan 2013 Policies DM J1, DM J2, DM J3, DM H5, Core<br />

Strategy Policies CC3 <strong>and</strong> London Plan Policies 6.1, 6.3, 6.10, 6.11 <strong>and</strong> 6.13.<br />

8. Sustainability: The application proposes a number of measures to reduce<br />

CO2 emissions from the baseline, including renewable energy measures. The<br />

proposal would seek to reduce pollution <strong>and</strong> waste <strong>and</strong> minimise its environmental<br />

impact. In this respect the proposal complies with Development Management<br />

Local Plan 2013 policies H1 <strong>and</strong> H2, Core Strategy policies CC1 <strong>and</strong> Policies 5.2,<br />

5.3 <strong>and</strong> 5.7 of The London Plan.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 7th May 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

Environment Agency - <strong>Planning</strong> Liaison<br />

Thames Water - Development Control<br />

London Fire And Emergency <strong>Planning</strong> Authority<br />

Environment Agency - <strong>Planning</strong> Liaison<br />

Dated:<br />

21.05.13<br />

23.05.13<br />

03.06.13<br />

29.05.13


Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

Blythe Road 18.07.13<br />

35A Gratton Road London W14 0JX 12.06.13<br />

Brangwyn Court Blythe Road London W14 0PJ 16.07.13<br />

Flat 6 39 Gratton Road London W14 0JX 09.06.13<br />

Flat 5 35 - 37 Gratton Road London W14 0JX 11.06.13<br />

Flat 3 20 Porten Road London W14 0LZ 02.06.13<br />

16 Ceylon Road West Kensington W14 0PY 17.07.13<br />

16 Ceylon Road London W14 0PY 14.07.13<br />

Flat 6 39 Gratton Road London W14 0JX 09.06.13<br />

19A Porten Road London W14 0LZ 10.06.13<br />

NAG 14.06.13<br />

35-37 Gratton Road Flat 6 London W14 0JX 11.06.13<br />

25 Porten Road London W14 0LQ 24.05.13<br />

1.0 BACKGROUND<br />

1.1 The application site (0.1644 ha) comprises a rectangular parcel of l<strong>and</strong>, in Council<br />

ownership, within the Spring Vale Estate. The estate comprises a number of blocks of<br />

flats ranging from 4 to 8 storeys in height. To the north of the site there is Porten Road<br />

(4-storey property), to the east is Brangwyn Court (4 storey residential block), to the<br />

South sits Elgar Court (6 storey residential block) <strong>and</strong> to the west is Ceylon Road (2<br />

storey property). The site is an open hard l<strong>and</strong>scaped area, currently used for estate<br />

resident car parking <strong>and</strong> includes a single storey garage block.<br />

1.2 The site is located within the Lakeside, Sinclair, Blythe Road Conservation Area.<br />

The majority of the application site is located within Flood Zone 1 (the area least at risk<br />

of flooding), whilst the northern edges of the site are located within Flood Risk Zones 2<br />

<strong>and</strong> 3. The immediate character <strong>and</strong> appearance of the area is residential. The<br />

application site is located in Public Transport Accessibility Level (PTAL) 3.<br />

1.3 There is no relevant planning history with regard to the application site.<br />

1.4 The proposal seeks consent for the demolition of a garage block, in connection<br />

with the redevelopment of the site incorporating a 4 storey residential block (comprising<br />

2 x 1 bed units, 6 x 2 bed units), together with the erection of two 2-storey 3 bedroom<br />

houses, with associated parking, access, l<strong>and</strong>scaping <strong>and</strong> alterations to the existing<br />

footpath <strong>and</strong> highway. There is a related Conservation Area Consent application<br />

(2013/01866/CACHF). This report covers matters arising from both applications.<br />

1.5 The project forms part of the Council's 'New Build Innovative Housing Programme',<br />

<strong>and</strong> it is proposed to deliver this scheme using the Rational House product. This is a<br />

housing product where houses are built using a range of st<strong>and</strong>ard parts that can be<br />

fitted together in different ways, to achieve different forms of development. These<br />

components are attached to a primary structure, <strong>and</strong> the shell of a typical house can be<br />

erected in 10 days. The primary structure <strong>and</strong> panels are made from pre-cast stone,<br />

<strong>and</strong> the use of these load bearing panels means that the internal walls can be changed<br />

to accommodate the different needs of the house throughout its lifetime.


2.0 PUBLICITY AND CONSULTATIONS<br />

2.1 The application has been advertised by way of site notices <strong>and</strong> a press advert. In<br />

addition, over 300 individual notification letters were sent to neighbouring properties in<br />

Elgar Court, Thackeray Court, Brangwyn Court, Calcott Court, Ceylon Road, Porten<br />

Road, Gratton Road <strong>and</strong> Milson Road. In addition, notifications were sent to the<br />

Springvale Tenants <strong>and</strong> Residents Association. English Heritage, the Environment<br />

Agency, the London Fire <strong>and</strong> Emergency <strong>Planning</strong> Authority, the Metropolitan Police's<br />

Crime Prevention Officer <strong>and</strong> Thames Water were consulted.<br />

2.2 Twenty two letters of objection have been received from residents. These<br />

objections (from: 35a, 35c, Flats 6 35-37 <strong>and</strong> Flat 6 39 Gratton Road; 19A Porten Road,<br />

Flat 3 20 Porten Road <strong>and</strong> 25 Porten Road; 10, 13, 16, 33 Ceylon Road (2 letters), 14<br />

Burn<strong>and</strong> House (3 letters); 7 Elgar Court; 1 Calcott Court, 18 Margaret, 25 Thackeray<br />

Court; 79 Westwick Gardens, 3 Brangwyn Court <strong>and</strong> one with no address given) can<br />

be summarised as follows:<br />

- Insufficient consultation with residents<br />

- Loss of existing open space<br />

- Will block light to adjacent properties<br />

- Proposal is too high <strong>and</strong> not in keeping with area<br />

- Will result in loss of existing off-street car parking, <strong>and</strong> an increased dem<strong>and</strong> for the<br />

spaces left<br />

- Increased dem<strong>and</strong> for local services<br />

- Increased noise nuisance from the development<br />

- Will harm the character <strong>and</strong> appearance of the conservation area<br />

- Unsatisfactory l<strong>and</strong>scaping<br />

- Refuse storage located adjacent to Porten Road, no consideration given to Porten<br />

Road side of scheme<br />

- Should be rented accommodation only<br />

- Loss of trees<br />

- Ceylon Road too narrow for additional vehicle movements <strong>and</strong> turning<br />

- Area should be l<strong>and</strong>scaped as previously agreed<br />

2.3 An objection has also been received from the local MP, Andrew Slaughter<br />

supporting the residents' grounds for objection.<br />

2.4 English Heritage has responded to say the scheme should be determined in line<br />

with local policy.<br />

2.5 The Environment Agency has responded to state that they have no objection to<br />

the proposed development<br />

2.6 Thames Water has raised no objections, subject to conditions.<br />

2.7 The London Fire <strong>and</strong> Emergency <strong>Planning</strong> Authority have responded to state that<br />

they are satisfied with the proposals.<br />

2.8 The Metropolitan Police Crime Design Advisor has looked at the proposed<br />

development <strong>and</strong> has suggested measures to meet the SBD criteria. This is discussed<br />

later in the report.


3.0 PLANNING CONSIDERATIONS<br />

3.1 The main planning considerations to be considered in light of the London Plan <strong>and</strong><br />

the Council's adopted Core Strategy <strong>and</strong> Development Management Local Plan 2013,<br />

policies <strong>and</strong> st<strong>and</strong>ards include; the principle of the residential use in l<strong>and</strong> use terms<br />

including tenure; quantum <strong>and</strong> intensity of development in terms of the height, scale <strong>and</strong><br />

massing; impact on surrounding uses particularly on the existing amenities of occupiers<br />

of neighbouring residential properties in terms of noise, outlook, light <strong>and</strong> privacy;<br />

quality of accommodation; environmental matters including sustainability <strong>and</strong> energy<br />

issues, flood risk matters, contaminated l<strong>and</strong>; impact on services <strong>and</strong> potential for traffic<br />

generation, <strong>and</strong> the impact on the highway network.<br />

LAND USE<br />

3.2 The development proposes the provision of ten residential units, located within an<br />

existing residential area. Therefore, there would be no conflict between the proposed<br />

use <strong>and</strong> the existing use in the area.<br />

3.3 The NPPF seeks to deliver a wide choice of high quality homes, widen<br />

opportunities for home ownership <strong>and</strong> create sustainable, inclusive <strong>and</strong> mixed<br />

communities. London Plan Policy 3.3 B states that an annual average of 32,210 net<br />

additional homes should be delivered. Table 3.1 sets an annual target of 615 net<br />

additional dwellings for Hammersmith <strong>and</strong> Fulham. Core Strategy Policy H1 reiterates<br />

the London Plan's annual target of 615 net additional dwellings for the borough. Policy<br />

DM A1 of the DM LP 2013 states the council will seek to exceed the London Plan<br />

housing target by seeking housing on both identified <strong>and</strong> windfall sites <strong>and</strong> as a result of<br />

change of use. The provision of ten units would contribute towards these targets. It is<br />

noted that there would be a loss of some garages within the estate, albeit that eight<br />

spaces would be provided adjacent to the development to replace these garages. There<br />

is no objection to that in l<strong>and</strong> use terms.<br />

3.4 Core Strategy Policy H4 <strong>and</strong> Policy DM A3 of the DM LP 2013 require a choice of<br />

high quality residential accommodation that meets the local residents needs <strong>and</strong><br />

aspirations <strong>and</strong> market dem<strong>and</strong>. In particular there should be a mix of housing types<br />

<strong>and</strong> sizes in development schemes, especially increasing the proportion of family<br />

accommodation.<br />

3.5 The proposal would involve building on existing car parking spaces, the site of 4<br />

garages (to be demolished) <strong>and</strong> would also involve the use of an underused grassed<br />

area to the east of the garage block. At present there is a total of some 336 sqm of<br />

grassed/l<strong>and</strong>scaped area on the site. Following the redevelopment this<br />

grassed/l<strong>and</strong>scaped area would increase to around 390 sqm (within the application<br />

site), with some further l<strong>and</strong>scaping proposed adjacent to the site (which would add a<br />

further 100 sqm). Accordingly, officers consider that the development would result in an<br />

increase in open l<strong>and</strong> provision in this part of the site. It is considered thereby that the<br />

development would comply with DM LP 2013 policy DM E1.<br />

3.6 The proposed dwelling mix of 2 x 1 bed flats, 4 x 2 bed flats, 2 x 2 bed<br />

maisonettes <strong>and</strong> 2 x 3 bed houses) represents a range of unit sizes, including a<br />

provision of family sized units. The dwelling mix is considered to meet the policy<br />

requirement for the provision of a range of unit sizes within new development in<br />

accordance with Core Strategy Policy H4 <strong>and</strong> DM A3 of the DM LP 2013.


Density<br />

3.7 London Plan Policy 3.4 <strong>and</strong> Core Strategy Policy H3 seek to ensure that<br />

development proposals achieve the optimum intensity of use compatible with local<br />

context, design principles <strong>and</strong> with public transport capacity, with consideration for the<br />

density ranges set out in Table 3.2 of The London Plan. This is supported by Policy DM<br />

A2 of the DM LP 2013.<br />

3.8 The application site is located in Public Transport Accessibility Level (PTAL) 3<br />

using Transport for London's methodology, indicating that it has good accessibility to<br />

public transport. According to The London Plan density matrix, the site is considered to<br />

be set in an urban area with predominantly dense development such as, for example,<br />

terraced houses, mansion blocks, a mix of different uses, medium building footprints<br />

<strong>and</strong> typically buildings of two to four storeys, located within 800 metres walking distance<br />

of a district centre or, along main arterial routes. This would support a density of<br />

between 200 <strong>and</strong> 450 habitable rooms per hectare (Hrh).<br />

3.9 The proposed development site comprises 0.164 hectares <strong>and</strong> would have<br />

approximately 42 habitable rooms which would result in a residential density of 260<br />

hr/ha, which is within the density range stipulated in the London Plan.<br />

3.10 The proposed scheme has been designed to take account of its local context <strong>and</strong><br />

character in terms of appropriate scale <strong>and</strong> massing, the form <strong>and</strong> character of<br />

surrounding development <strong>and</strong> the historic grain <strong>and</strong> impact on neighbours, as well as<br />

complying with the st<strong>and</strong>ards on the size of residential units. For these reasons it is<br />

considered that the development would optimise the site's potential <strong>and</strong> that the<br />

proposed density is considered acceptable.<br />

Tenure<br />

3.11 London Plan Policy 3.13 (Affordable Housing Thresholds) outlines that affordable<br />

housing will normally be required on a site which has the capacity to provide 10 or more<br />

homes <strong>and</strong> that negotiations should take account of development viability.<br />

3.12 London Plan policy 3.10 (Definition of Affordable Housing) defines affordable<br />

housing as including social rented <strong>and</strong> intermediate housing provided to specified<br />

eligible households whose needs are not met by the market, <strong>and</strong> goes on to specify that<br />

affordable housing should also a) meet the needs of eligible households, b) include<br />

provisions for the unit to remain at an affordable price for future generations, <strong>and</strong> c) if<br />

these restrictions are lifted, for the subsidy to be recycled for alternative affordable<br />

housing provision.<br />

3.13 Policy 3.11 (Affordable Housing Targets) of The London Plan sets a London wide<br />

affordable housing target of at least 13,200 more affordable homes per year. The policy<br />

advises that 60% of new affordable housing should be provided for social rent <strong>and</strong> 40%<br />

for intermediate rent or sale, with priority accorded to the provision of affordable family<br />

housing. The second part of policy 3.11 relates to the establishment of borough level<br />

affordable housing targets through LDF preparation, that should take account of a range<br />

of considerations that include the strategic target <strong>and</strong> local circumstances.<br />

3.14 Policy 3.12 of The London Plan states 'The maximum reasonable amount of<br />

affordable housing should be sought when negotiating on individual private residential<br />

<strong>and</strong> mixed use schemes, having regard to a) current <strong>and</strong> future requirements for<br />

affordable housing at local <strong>and</strong> regional levels identified in line with Policies 3.8 <strong>and</strong>


3.10 <strong>and</strong> 3.11; b) affordable housing targets adopted in line with policy 3.11; c) the need<br />

to encourage rather than restrain residential development (Policy 3.3); d) the need to<br />

promote mixed <strong>and</strong> balanced communities (Policy 3.9); e) the size <strong>and</strong> type of<br />

affordable housing needed in particular locations; <strong>and</strong> f) the specific circumstances of<br />

individual sites.' The London Plan goes on to say that 'the Mayor wishes to encourage,<br />

not restrain overall residential development. Boroughs should take a reasonable <strong>and</strong><br />

flexible approach to securing affordable housing on a site by site basis. Boroughs<br />

should take into account economic viability <strong>and</strong> the most effective use of public <strong>and</strong><br />

private investment, including the use of developer contributions. Development<br />

appraisals should be provided to demonstrate that the scheme maximises affordable<br />

housing output.'<br />

3.15 Core Strategy Borough Wide Strategic Policy H2 Affordability sets a target for 40%<br />

of additional dwellings to be affordable, with a preference for intermediate <strong>and</strong><br />

affordable rented. It also states that in 'negotiating for affordable housing the council will<br />

take into account financial viability'.<br />

3.16 The need for intermediate housing, rather than social housing in the Borough is<br />

highlighted in the supporting text for Policy H2. Paragraph 8.17 goes on to say that<br />

although the stock of intermediate affordable housing has increased in the last 10 years<br />

it still makes up only about 1,850 dwellings or just over 2% of the housing stock. This<br />

compares to over 3,000 households registered for low cost homeownership on the H&F<br />

Homebuy Register. Paragraph 8.20 highlights a severe lack of affordable market<br />

housing in H&F coupled with a probable reduction in owner occupation. The above<br />

demonstrates that there is a need to increase the supply of intermediate affordable<br />

housing. The supporting text also suggests that even if the entire 40% affordable<br />

housing target (almost 3,000 dwellings by 2021/22) is intermediate housing, this will still<br />

only increase the intermediate housing stock to about 4,800 dwellings or about 5.5% of<br />

the total dwelling stock.<br />

3.17 Paragraph 8.21 goes on to stress that as house prices <strong>and</strong> market rents are so<br />

high in H&F, intermediate housing <strong>and</strong> affordable rented housing needs to be affordable<br />

to a broad range of incomes. The income range of households that cannot afford market<br />

housing in H&F is £19,900 to £79,400 for households that require 4 or more bedrooms.<br />

It states that the council will encourage the provision of a variety of intermediate housing<br />

products that will assist people who cannot afford market housing to buy (e.g. shared<br />

ownership, equity share, discounted market sale) or rent (e.g. affordable rented<br />

housing). The provision <strong>and</strong> affordability of such housing will be taken into account in<br />

considering the appropriate proportion of affordable housing on individual sites.<br />

3.18 The application proposes 6 affordable housing units (2 x 1 bed, 4 x 2 bed)<br />

representing 60% of the overall development. All of these units would be provided as<br />

intermediate housing (discounted market sale). Two of the six units (a third) would be<br />

sold to applicants with a household income of up to £30,000 p.a., two of the units (a<br />

third) would be sold to applicants with a household income of up to £40,000 p.a. <strong>and</strong><br />

two of the units (a third) would be sold to applicants with a household income of up to<br />

£60,000 p.a. This equates to an average household income of £43,300 <strong>and</strong> is in line<br />

with the Council guidance on affordability levels for low cost homeownership. The<br />

affordable homes would be sold to people who live or work within the borough <strong>and</strong> this<br />

process would be managed by the Council's HomeBuy department.


3.19 The scheme's affordable provision is in excess of the affordable housing target of<br />

the Core Strategy, London Plan <strong>and</strong> DM LP 2013; officers raise no objection to this<br />

element of the proposed development.<br />

DESIGN <strong>and</strong> CONSERVATION<br />

3.20 Among the core planning principles of the NPPF are that development always<br />

seek to secure high quality design <strong>and</strong> a good st<strong>and</strong>ard of amenity for all existing <strong>and</strong><br />

future occupants of l<strong>and</strong> <strong>and</strong> buildings. Furthermore proposals should conserve heritage<br />

assets in a manner appropriate to their significance, so that they can be enjoyed for<br />

their contribution to the quality of life of this <strong>and</strong> future generations. London Plan<br />

Policies 7.1, 7,2. 7.4. 7.5 <strong>and</strong> 7.6 require all new development to be of high quality that<br />

responds to the surrounding context <strong>and</strong> improves access to social <strong>and</strong> community<br />

infrastructure, contributes to the provision of high quality living environments <strong>and</strong><br />

enhances the character, legibility, permeability <strong>and</strong> accessibility of the surrounding<br />

neighbourhood.<br />

3.21 Core Strategy Policy BE1 `Built Environment' states that 'All development within<br />

the borough, including in the regeneration areas should create a high quality urban<br />

environment that respects <strong>and</strong> enhances its townscape context <strong>and</strong> heritage assets.<br />

There should be an approach to accessible <strong>and</strong> inclusive urban design that considers<br />

how good design, quality public realm, l<strong>and</strong>scaping <strong>and</strong> l<strong>and</strong> use can be integrated to<br />

help regenerate places'.<br />

3.22 Policy DM G1 (Design of New Build) of the DM LP 2013, seeks to ensure that new<br />

build development to be of a high st<strong>and</strong>ard of design <strong>and</strong> compatible with the scale <strong>and</strong><br />

character of existing development <strong>and</strong> its setting. It states that:<br />

'All proposals must be designed to respect:<br />

a) the historical context <strong>and</strong> townscape setting of the site, <strong>and</strong> its sense of place;<br />

b) the scale, mass, form <strong>and</strong> grain of surrounding development;<br />

c) the relationship of the proposed development to the existing townscape,<br />

including the local street pattern, local l<strong>and</strong>marks <strong>and</strong> the skyline;<br />

d) the local design context, including the prevailing rhythm <strong>and</strong> articulation of<br />

frontages, local building materials <strong>and</strong> colour, <strong>and</strong> locally distinctive architectural<br />

detailing, <strong>and</strong> thereby promote <strong>and</strong> reinforce local distinctiveness;<br />

e) the principles of good neighbourliness;<br />

f) the local l<strong>and</strong>scape context <strong>and</strong> where appropriate should provide good<br />

l<strong>and</strong>scaping <strong>and</strong> contribute to an improved public realm; <strong>and</strong><br />

g) sustainability objectives; including adaptation to, <strong>and</strong> mitigation of, the effects<br />

of climate change;<br />

h) the principles of accessible <strong>and</strong> inclusive design; <strong>and</strong><br />

i) the principles of Secured by Design.'<br />

3.23 Policy DM G7 (Heritage <strong>and</strong> Conservation) of the DM LP 2013 states that the<br />

council will '....aim to protect, restore or <strong>and</strong> enhance the quality, <strong>and</strong> character,<br />

appearance <strong>and</strong> setting of the borough's conservation areas <strong>and</strong> its historic<br />

environment, including listed buildings, historic parks <strong>and</strong> gardens, buildings <strong>and</strong><br />

artefacts of local importance <strong>and</strong> interest, archaeological priority areas <strong>and</strong> the<br />

scheduled ancient monument'.<br />

3.24 Design Policies 1 <strong>and</strong> 45 - 50 of the <strong>Planning</strong> Guidance SPD 2013 are also<br />

relevant. Finally, the NPPF (Conserving <strong>and</strong> enhancing the historic environment) states<br />

that In determining planning applications, local planning authorities should take account


of the desirability of sustaining <strong>and</strong> enhancing the significance of heritage assets <strong>and</strong><br />

putting them to viable uses consistent with their conservation; the positive contribution<br />

that conservation of heritage assets can make to sustainable communities including<br />

their economic vitality; <strong>and</strong> the desirability of new development making a positive<br />

contribution to local character <strong>and</strong> distinctiveness. The NPPF goes on to state that local<br />

planning authorities should also look for opportunities for new development within<br />

conservation areas <strong>and</strong> within the setting of heritage assets to enhance or better reveal<br />

their significance. It says that proposals that preserve those elements of the setting that<br />

make a positive contribution to or better reveal the significance of the asset should be<br />

treated favourably. The proposal uses the modular house design product known as<br />

Rational House. Committee members may be aware of the approved Rational House<br />

scheme for a single house in Biscay Road. The underlying aim of Rational House is to<br />

provide high quality city dwellings at affordable costs. It is a modular design which has<br />

been developed with flexibility to deal with a range of circumstances <strong>and</strong> dem<strong>and</strong>s. The<br />

application site is located within the Lakeside, Sinclair, Blythe Road Conservation Area,<br />

<strong>and</strong> occupies a plot of l<strong>and</strong> within the Spring Vale estate. The site currently contributes<br />

little to the conservation area <strong>and</strong> presents a poor aspect <strong>and</strong> physical environment,<br />

consisting of parking spaces <strong>and</strong> single storey garages.<br />

3.25 The surrounding area is primarily residential <strong>and</strong> is either in the form of<br />

traditional Victorian two-storey terraces such as those along Ceylon Road <strong>and</strong> the west<br />

side of Porten Road, or blocks of flats at four <strong>and</strong> six storeys such as Brangwyn Court at<br />

four storeys, Elgar Court at six storeys <strong>and</strong> Porten House on the east side of Porten<br />

Road at four storeys. The predominant character of the surrounding streets in the<br />

conservation area is one of well- defined frontages where the residential properties<br />

address the street. Currently the view along Porten Road is poorly enclosed by the site,<br />

<strong>and</strong> terminated by the open hard surfaced area of the car park. Perimeter trees along<br />

the site boundary to Ceylon Road are alone in providing some edge definition to the<br />

street. There is an opportunity to reinstate an edge to the streets around the perimeter<br />

of this plot with a new built form which respects the existing townscape, <strong>and</strong> would<br />

thereby create a link between the residential streets <strong>and</strong> the residential estate, <strong>and</strong><br />

provide an enhancement to the street scene <strong>and</strong> conservation area. The demolition of<br />

the single storey garage block (4 garages) is considered to be acceptable as it has<br />

limited architectural quality <strong>and</strong> makes a neutral contribution to the character <strong>and</strong><br />

appearance of the area generally at this point (the reduction in the number of parking<br />

spaces is a separate issue to be discussed later in the report).<br />

3.26 The proposed scheme would reflect the built forms found in the surrounding<br />

townscape <strong>and</strong> proposes a four storey block on the axis of the view along Porten Road,<br />

which would provide good definition to the street edge with a consistent building scale,<br />

<strong>and</strong> two two-storey houses are proposed along the Ceylon Road frontage, which would<br />

respond to the terrace opposite. The proposed heights would reflect the prevailing<br />

heights of the surrounding built form <strong>and</strong> along Ceylon Road the alignment would be set<br />

back to allow for parking spaces <strong>and</strong> soft l<strong>and</strong>scaping, including the retention of the<br />

existing trees.<br />

3.27 The Rational House concept allows for the roof space to be habitable <strong>and</strong> the<br />

vertical circulation core is lower in height giving a varied massing to the street<br />

elevations. The design of the facades would adopt the proportions <strong>and</strong> details evident<br />

on surrounding buildings. A white masonry base <strong>and</strong> main rendered facade with white<br />

masonry architraves to the upper windows which is particularly characteristic in the<br />

surrounding townscape would be carried through to the proposed facades. The precise


materials would be reserved by condition (condition 5). Particular care has been paid to<br />

the flank elevation of the four storey block as it faces Ceylon Road. An ordered<br />

fenestration pattern <strong>and</strong> projecting balconies would give this elevation variation <strong>and</strong><br />

visual interest in recognition of the prominence it would have in the street scene.<br />

3.28 The existing mature trees which line the edge of the site, the Cherry trees on<br />

Ceylon Road <strong>and</strong> the Hornbeam trees along Porten Road would be retained <strong>and</strong> form a<br />

l<strong>and</strong>scaped setting for the development. Finally, the set back along Ceylon Road would<br />

allow for the inclusion of a garden space which could be used by all residents, with the<br />

intention that it would be l<strong>and</strong>scaped to a simple design (residents would be involved in<br />

the final design of this area).<br />

3.29 Officers consider that the proposed scheme would develop an under utilised<br />

area <strong>and</strong> repair the street scene in this part of the Spring Vale Estate with high quality<br />

building frontages set within a soft l<strong>and</strong>scaped setting provided primarily by the<br />

retention of the existing trees. The development would thereby successfully integrate<br />

into the street scene. The development would also thereby enhance the character <strong>and</strong><br />

appearance of this part of the conservation area <strong>and</strong> would comply with the NPPF,<br />

London Plan <strong>and</strong> local policies.<br />

QUALITY OF ACCOMMODATION<br />

3.30 Policy 3.5 <strong>and</strong> Table 3.3 of The London Plan, Core Strategy Policy H3, Policy<br />

DM A9 <strong>and</strong> Policy DM A2 of the DM LP 2013, <strong>and</strong> <strong>Planning</strong> Guidance SPD 2013<br />

Housing Policy 1, expect all housing development to be of a high quality design <strong>and</strong> be<br />

designed to have adequate internal space. Policy DM E1 <strong>and</strong> DM A9 requires all new<br />

developments to make provision for open space to meet the needs of the occupiers <strong>and</strong><br />

users (ground floor family <strong>and</strong> non family dwellings should have at least 36m² <strong>and</strong> 14m²<br />

of amenity space respectively). Policy DM A2 of the DM LP 2013 supports the<br />

requirement for amenity space <strong>and</strong> also requires family housing on upper floors to have<br />

access to a balcony <strong>and</strong>/or terrace, subject to acceptable amenity <strong>and</strong> design<br />

considerations.<br />

3.31 All of the proposed units would exceed the minimum dwelling size requirements<br />

of both the London Plan <strong>and</strong> DM LP 2013: one-bed flats (52 sqm), two-bed (62 <strong>and</strong> 87<br />

sqm), three bed houses (145 sqm). No units would have all their habitable room<br />

windows facing north. All flats would be provided with outdoor amenity space in the form<br />

of balconies <strong>and</strong>/or terraces. The houses would have ground floor amenity space <strong>and</strong><br />

terraces above. The one bed flats would each require 5 sq.m. whilst 18 sq.m. is<br />

proposed for each; each of the two bed flats would have the required 6 sq.m.; the 2 bed<br />

maisonettes would require 6 sq.m. but each would have 25 sq.m. <strong>and</strong> the 3 bed houses<br />

would each require 36 sq.m., but they would have 41 sq.m. In this case the amenity<br />

space provided is considered to be acceptable. In view of the above the proposed<br />

residential units would be of adequate size <strong>and</strong> layout to provide an acceptable outlook<br />

<strong>and</strong> sunlight <strong>and</strong> daylight levels, <strong>and</strong> external space to occupiers of the residential units.<br />

3.32 London Plan Policy 3.8, Core Strategy Policy H4, <strong>and</strong> Policy DM A4 of the DM<br />

LP 2013, Design Policy 1 of the <strong>Planning</strong> Guidance SPD 2013, <strong>and</strong> the Council's<br />

Supplementary <strong>Planning</strong> Document `Access for All' requires new residential<br />

development to be built to lifetime homes st<strong>and</strong>ards, with ten percent of units designed<br />

to be wheelchair accessible or easily adaptable to this st<strong>and</strong>ard.


3.33 All units would be built to Lifetime Homes st<strong>and</strong>ards; all bathrooms would be<br />

wheelchair accessible <strong>and</strong> dwellings could be easily adapted for wheelchair residents.<br />

There would be lift access to the front doors of the eight flats in the flat block with level<br />

access from the street level. The two houses are easily adaptable for wheelchair use.<br />

The main staircase can also be easily adapted to take a chairlift if required. Officers<br />

thereby consider that policy is met in this matter.<br />

IMPACT ON NEIGHBOURS<br />

3.34 Policy DM G1 states all proposals must be formulated to respect the principles of<br />

good neighbourliness. Furthermore, Supplementary <strong>Planning</strong> Guidance SPD Housing<br />

Policy 8 seeks to protect the existing amenities of neighbouring residential properties in<br />

terms of outlook, light, privacy <strong>and</strong> noise <strong>and</strong> disturbance.<br />

3.35 The proposed development would be located on a relatively open part of the<br />

estate, which in terms of buildings contains a single storey garage block.<br />

Notwithst<strong>and</strong>ing this due to the location of the proposed development within the site <strong>and</strong><br />

the set back from the adjacent roads, officers consider that it would not result in a<br />

detrimental impact to surrounding residential buildings, in terms of loss of outlook or<br />

increased sense of enclosure.<br />

3.36 Supplementary <strong>Planning</strong> Guidance SPD Housing Policy 8 states that new<br />

windows (or terraces) should normally be positioned so that they are a minimum of 18<br />

metres away from existing residential windows as measured by an arc of 60 degrees<br />

taken from the centre of the proposed window. Policy DM H11 of the DM LP 2013, says<br />

that `All proposed developments (including new buildings, demolition of existing<br />

buildings, conversions <strong>and</strong> changes of use) will be required to show that there will be no<br />

undue detriment to the general amenities enjoyed by existing surrounding occupiers of<br />

their properties, particularly where commercial <strong>and</strong> service activities will be close to<br />

residential properties. In the case of mixed use developments, similar protection will<br />

also be afforded to the prospective residents <strong>and</strong> other users where there is potential for<br />

activities within the new development to impact on their immediate neighbours on the<br />

same site. SPD Housing Policy 8 adds that roof terraces or balconies likely to cause<br />

harm to the existing amenities of neighbouring properties by reason of noise <strong>and</strong><br />

disturbance will not be supported.<br />

3.37 Ceylon Road to the west is located over 18 m away from the new windows, To<br />

the east Brangwyn Court is over 18m away, there is only an 8m distance between two<br />

new windows <strong>and</strong> Elgar Court (however the proposed windows are high level openings<br />

only) <strong>and</strong> as such officers consider that they would not result in loss of privacy or<br />

overlooking. To the north (Porten Road), there are a few windows within the 18m<br />

distance (10.8 metres), however, the angle is very oblique <strong>and</strong> officers consider that the<br />

degree of overlooking is very limited <strong>and</strong> as such do not consider that the scheme<br />

would result in demonstrable harm in terms of overlooking <strong>and</strong> loss of privacy.<br />

3.38 It is difficult to predict with any accuracy the likely level of noise/disturbance that<br />

would be generated by the use of the proposed balcony/terrace areas. On the upper<br />

floors the scheme would provide six balconies (5 - 6 sqm each), <strong>and</strong> 2 terraces at<br />

second floor level (25 sqm each), <strong>and</strong> two terraces at 4th floor level (20 sqm each). The<br />

larger terraces would have significant screening (full details to be reserved by condition<br />

31). The larger terraces would be located at a high level, <strong>and</strong> together with the<br />

proposed screening as well as their distance relationship to the existing properties, it is<br />

not considered that their use would, in the normal course of events, be likely to harm the


amenities of existing neighbours as a result of additional noise <strong>and</strong> disturbance to a<br />

degree that would justify refusing planning permission. The proposal is therefore<br />

considered to be consistent with Policy DM H9 <strong>and</strong> SPD Housing Policy 8.<br />

Daylight <strong>and</strong> Sunlight<br />

3.39 New development should allow for the protection of adequate light to reach<br />

adjacent buildings. In considering this, the council has regard to the guidance set out in<br />

`Building Research Establishments' (BRE) Report 1991 'Site Layout planning for<br />

Daylight <strong>and</strong> Sunlight - A guide to good practice.' The BRE methodologies set out a<br />

range of non-statutory guidelines to assess the potential for any development to result<br />

in demonstrable harm to neighbours.<br />

3.40 The BRE provides for a number of ways to assess potential reduction of light.<br />

The most common methods are calculation of a Vertical Sky Component (VSC) <strong>and</strong><br />

Average Daylight Factor (ADF). In addition orientation to the sun is taken into account<br />

with regard to impact on existing sunlight conditions.<br />

3.41 The applicant has submitted a sunlight & daylight assessment in accordance with<br />

the BRE guidelines, <strong>and</strong> concludes that the proposed development would not result in<br />

demonstrable harm to the majority of the neighbouring properties in terms of reduction<br />

of sunlight or daylight. Officers have assessed the report <strong>and</strong> concur with its findings.<br />

Policy DM G1 (principles of good neighbourliness) <strong>and</strong> Supplementary <strong>Planning</strong><br />

Guidance SPD Housing Policy 8 (protect the existing amenities of neighbouring<br />

residential properties) are thereby met.<br />

3.42 With regards to windows in Elgar Court (located to the south of the site) there<br />

would be an impact on the majority of the windows facing the development. However<br />

officers have been advised that these windows all comprise kitchens <strong>and</strong> bathrooms,<br />

<strong>and</strong> as such the impact is not on habitable room windows.<br />

3.43 To the west of the site, the properties in Ceylon Road would not experience<br />

either a reduction less than 0.8 times its former value (reductions would be between<br />

0.85 <strong>and</strong> 0.98 of former value). In this respect the impact is within the BRE guidelines.<br />

3.44 To the east of the site is Brangwyn Court, all windows would retain at least 80%<br />

of their former VSC value (81% to 96%).<br />

3.45 To the north is Porten Road <strong>and</strong> here (at 19 - 28 Porten Houses) the<br />

development would affect the adjacent building (three windows at ground/basement<br />

levels). One basement window would retain 75% of its former VSC value <strong>and</strong> the other<br />

would retain 69%. A ground floor level window would retain 72% of its former VSC<br />

value. It has not been possible to determine the uses of these rooms, although the<br />

ground floor window would appear to serve a habitable room. These windows would,<br />

however, retain acceptable daylighting with respect to generally accepted ADF levels.<br />

3.46 A sunlight analysis has been provided, <strong>and</strong> considered by officers. All windows<br />

<strong>and</strong> gardens within 90 degrees of due south have been assessed, in accordance with<br />

the guidelines. The analysis indicates that adjacent property would experience<br />

shadowing in a similar manner to that currently experienced, <strong>and</strong> would be in keeping<br />

with the BRE guidance.


HIGHWAYS MATTERS<br />

Car parking <strong>and</strong> traffic generation<br />

3.47 The NPPF requires developments that generate significant movement are<br />

located where the need to travel will be minimised <strong>and</strong> the use of sustainable transport<br />

modes can be maximised; <strong>and</strong> development should protect <strong>and</strong> exploit opportunities for<br />

the use of sustainable transport modes for the movement of goods or people.<br />

3.48 Policies 6.1, 6.3, 6.10, 6.11 <strong>and</strong> 6.13 of The London Plan set out the intention to<br />

encourage consideration of transport implications as a fundamental element of<br />

sustainable transport, supporting development patterns that reduce the need to travel or<br />

that locate development with high trip generation in proximity of public transport<br />

services. The policies also provide guidance for the establishment of maximum car<br />

parking st<strong>and</strong>ards.<br />

3.49 Core Strategy Policy T1 supports The London Plan. Policies DM J2 <strong>and</strong> DM J3<br />

of the DM LP set out vehicle parking st<strong>and</strong>ards, which brings them in line with London<br />

plan st<strong>and</strong>ards <strong>and</strong> circumstances when they need not be met<br />

3.50 The development would result in the loss of some existing garages within the<br />

estate (4 lost out of a total of 10) as well as a number of surface level parking spaces (8<br />

retained out of 19). Information has been submitted to indicate that only 6 garages <strong>and</strong><br />

7 car parking spaces are currently leased to residents. The applicants consider that the<br />

retention (<strong>and</strong> refurbishment) of the 6 garages together with the 8 spaces would meet<br />

the dem<strong>and</strong> for the estate. There are no specific policies to resist the loss of garages or<br />

parking spaces. The scheme would provide 4 new car parking spaces for the occupiers<br />

of the market units. These spaces would be accessed from the existing access point in<br />

Ceylon Road (would be widened as part of the development). Submitted information<br />

indicates that vehicles can satisfactorily access <strong>and</strong> leave the site from this access<br />

point.<br />

3.51 The proposal would result in the creation of ten new residential units. DM LP<br />

policy DM J2 would require (as a maximum) between ten <strong>and</strong> eleven spaces. The<br />

applicant is proposing four car parking spaces to serve the development. Officers are of<br />

the opinion that this is an acceptable solution on condition that the applicants agree that<br />

the occupiers of all of the new units are not eligible to obtain on-street car parking<br />

permits (Conditions 27-29). A car parking management plan would also be required by<br />

condition (no.32). The development would only have four car parking spaces, <strong>and</strong> as<br />

such the development would be unlikely to generate a significant number of vehicle<br />

movements. Furthermore, there will be an overall reduction in the number of parking<br />

spaces within this part of the estate, limiting vehicle movements. Accordingly, given the<br />

location of the site (PTAL3), which offers good public transport accessibility <strong>and</strong> easy<br />

access to shops <strong>and</strong> services, this is considered to be an appropriate approach in this<br />

case, <strong>and</strong>, it is not considered that the proposed development would be likely to have<br />

an unacceptable impact on the existing amenities of local residents as a result of<br />

increased on-street car parking stress. In addition the applicant would pay the cost of<br />

the works to widen the existing entrance from Ceylon Road. On this basis, the<br />

proposed development is judged to be acceptable in the context of UDP Policy T1 of the<br />

Core Strategy, DM LP Policies DM J1, DM J2, DM J3.<br />

Cycle parking<br />

3.52 London Plan Policy 6.9 provides guidance for the establishment of cycle parking<br />

st<strong>and</strong>ards. Policies DM A9, DM J5 <strong>and</strong> Table 5 of the DM LP 2013 seek to ensure that


satisfactory cycle space is provided for all developments. Secure storage for fourteen<br />

bicycles would be provided for the flats, <strong>and</strong> the houses would have two spaces each in<br />

the ground floor patio area. This provision is more than what would normally be<br />

expected, which would be twelve cycle parking spaces for a development of this size. A<br />

condition is proposed to ensure the cycle storage is implemented before the<br />

development is occupied <strong>and</strong> is maintained for the life of the development (condition<br />

no.12). The proposal is thereby considered to be in accordance with the above policies.<br />

3.53 Access to the existing spaces will not be possible during the redevelopment of the<br />

site. The applicants have proposed that the existing users of the car parking spaces<br />

would be eligible for the period of the development to obtain a temporary on-street car<br />

parking permit. The specific details of how this would be controlled would be covered by<br />

the submission of a car parking management plan (condition 30).<br />

Refuse storage<br />

3.54 London Plan Policy 5.16 outlines the Mayor's approach to waste management.<br />

Core Strategy Policy CC3, <strong>and</strong> policy DM H5 sets out the Councils Waste Management<br />

guidance, requiring development to incorporate suitable facilities for the storage <strong>and</strong><br />

collection of segregated waste.<br />

3.55 The houses <strong>and</strong> ground floor flats have their own dedicated waste storage areas<br />

within their patios, <strong>and</strong> refuse storage space would be provided for all refuse generated<br />

by the other flats at ground floor level on the eastern side of the development . Officers<br />

are satisfied that there is sufficient space within the development for the satisfactory<br />

storage of refuse. However, a condition is proposed to ensure the full details of refuse<br />

storage <strong>and</strong> to ensure that the approved details are implemented before the use is<br />

occupied <strong>and</strong> is maintained for the life of the development (condition no. 11).<br />

Impact of building works<br />

3.56 A Demolition Management Plan (DMP), a Construction Management Plan (CMP)<br />

<strong>and</strong> Construction Logistics Plan (CLP) would be required to ensure that there is no<br />

harmful impact on neighbours <strong>and</strong> on the local highways network. The DMP <strong>and</strong> CMP<br />

shall include demolition details, contractors' construction method statements, waste<br />

classification <strong>and</strong> disposal procedures <strong>and</strong> locations, dust <strong>and</strong> noise monitoring <strong>and</strong><br />

control, provisions within the site to ensure that all vehicles associated with the<br />

construction works are properly washed <strong>and</strong> cleaned to prevent the passage of mud<br />

<strong>and</strong> dirt onto the highway, <strong>and</strong> other matters relating to traffic management to be<br />

agreed. The CLP shall be in accordance with Transport for London (TfL) requirements,<br />

which seeks to minimise the impact of construction traffic on nearby roads <strong>and</strong> restrict<br />

construction trips to off peak hours only. These would be secured by condition (no. 03)<br />

in accordance with DM LP policies DM H5, DM H8, DM H9, DM H10 <strong>and</strong> DM H11, <strong>and</strong><br />

London Plan Policy 6.3.<br />

ENVIRONMENTAL MATTERS<br />

Flood risk<br />

3.57 The NPPF states that inappropriate development in areas at risk of flooding should<br />

be avoided by directing development away from areas at highest risk, but where<br />

development is necessary, making it safe without increasing flood risk elsewhere.<br />

3.58 London Plan Policy 5.11, 5.12, 5.13, 5.14 <strong>and</strong> 5.15 requires new development to<br />

comply with the flood risk assessment <strong>and</strong> management requirements of national policy,


including the incorporation of sustainable urban drainage systems, <strong>and</strong> specifies a<br />

drainage hierarchy for new development.<br />

3.59 Policy CC1 of the Core Strategy requires that new development is designed to<br />

take account of increasing risks of flooding. Policy CC2 states that new development<br />

will be expected to minimise current <strong>and</strong> future flood risk <strong>and</strong> that sustainable urban<br />

drainage will be expected to be incorporated into new development to reduce the risk of<br />

flooding from surface water <strong>and</strong> foul water. This is supported by Policy DM H3 of the<br />

DM LP 2013.<br />

3.60 Although a small part on the edge of the site is located within the Environment<br />

Agency's Flood Zones 2 <strong>and</strong> 3, the majority of the site is in Flood Zone 1 (low risk) as<br />

the ground levels of the estate are higher than much of the surrounding area. The River<br />

Thames flood defences in this area defend the site to a 1 in 1000 year annual<br />

probability of river flooding in any year (


which would target level 4 of the Code for Sustainable Homes. In addition to the carbon<br />

reduction measures outlined above, additional measures are planned to promote the<br />

sustainable use of building materials, ensure efficient use of water, encourage<br />

sustainable waste behaviour, reduce pollution <strong>and</strong> manage the impacts of the<br />

construction process. The measures outlined in the statement comply with the<br />

requirements of London Plan policy 5.3 on sustainable design <strong>and</strong> construction. A<br />

condition would be attached to any permission to ensure the implementation of the<br />

measures outlined in the Sustainability Statement (condition 18).<br />

3.65 It is therefore considered that, subject to conditions ensuring the implementation<br />

of the energy <strong>and</strong> the sustainability measures, the proposal would be judged to comply<br />

with London Plan Policy 5.3 <strong>and</strong> Policy DM H2 of the DM LP on sustainable design <strong>and</strong><br />

construction <strong>and</strong> Core Strategy policy CC1 <strong>and</strong> Policy DM H1 of the DM LP on carbon<br />

reduction.<br />

Contamination<br />

3.66 London Plan Policy 5.21, Core Strategy Policy CC4 <strong>and</strong> Policy DM H7 <strong>and</strong> DM<br />

H11 of the DM LP 2013 states that the Council will support the remediation of<br />

contaminated l<strong>and</strong> <strong>and</strong> that it will take measures to minimise the potential harm of<br />

contaminated sites <strong>and</strong> ensure that mitigation measures are put in place. The applicants<br />

have submitted a preliminary risk assessment relating to contaminated l<strong>and</strong>, which has<br />

been assessed by officers.<br />

3.67 Potentially contaminative l<strong>and</strong> uses, past or present, are understood to occur at,<br />

or near to, this site. In order to ensure that no unacceptable risks are caused to<br />

humans, controlled waters or the wider environment during <strong>and</strong> following the<br />

development works further conditions would be attached to any permission covering the<br />

assessment <strong>and</strong> remediation of contaminated l<strong>and</strong> (Conditions 19 to 23).<br />

PLANNING OBLIGATIONS<br />

CIL<br />

3.68 Mayoral CIL (Community Infrastructure Levy) came into effect in April 2012 <strong>and</strong> is<br />

a material consideration to which regard must be had when determining this planning<br />

application. CIL Regulations (2010) state that in dealing with planning applications, local<br />

planning authorities consider each on its merits <strong>and</strong> reach a decision based on whether<br />

the application accords with the relevant development plan, unless material<br />

considerations indicate otherwise. Where applications do not meet these requirements,<br />

they may be refused. However, in some instances, it may be possible to make<br />

acceptable development proposals which might otherwise be unacceptable, through the<br />

use of planning conditions or, where this is not possible, through planning obligations.<br />

3.69 This development will be subject to a London-wide community infrastructure levy,<br />

charged at a rate of £50 per square metre for development in Hammersmith & Fulham.<br />

An estimate of £23,000 based on 806 sqm of additional floorspace has been calculated.<br />

This takes into account a discount for the affordable housing provided. This will<br />

contribute towards the funding of Crossrail, <strong>and</strong> further details are available via the GLA<br />

website www.london.gov.uk. The GLA expect the Council, as the Collecting Authority, to<br />

secure the levy in accordance with London Plan Policy 8.3.


3.70 The scheme has been assessed for its likely impact on local services, <strong>and</strong> given<br />

the small scale of the scheme <strong>and</strong> its low child yield, it is considered that the<br />

development would not result in substantial dem<strong>and</strong>s on local services.<br />

4.0 CONCLUSIONS <strong>and</strong> RECOMMENDATION<br />

4.1 Accordingly, it is recommended that both planning permission <strong>and</strong> conservation<br />

area consent be granted, subject to conditions.


---------------------------------------------------------------------------------------------------------------------<br />

Ward: Avonmore And Brook Green<br />

Site Address:<br />

Spring Vale Estate Ceylon Road London W14 0PY<br />

© Crown Copyright. All Rights Reserved. London Borough Hammersmith <strong>and</strong> Fulham LA100019223 (2013).<br />

For identification purposes only - do not scale.<br />

Reg. No:<br />

2013/01866/CACHF<br />

Date Valid:<br />

09.05.2013<br />

Committee Date:<br />

31.07.2013<br />

Case Officer:<br />

Neil Egerton<br />

Conservation Area:<br />

: Lakeside/Sinclair/Blythe Road Conservation Area<br />

- Number 36


Applicant:<br />

Mr Eric Holroyd<br />

Housing & Regeneration 3rd Floor, Hammersmith Town Hall Ext. Hammersmith<br />

W6 9JU<br />

Description:<br />

Demolition of four garages, to facilitate redevelopment comprising erection of a four<br />

storey building providing 8 flats (2 x 1 bed, 6 x 2 bed) together with two, 2 storey 3<br />

bedroom dwelling houses; with associated parking, l<strong>and</strong>scaping, <strong>and</strong> alterations to the<br />

footpath <strong>and</strong> vehicle access<br />

Drg Nos:<br />

Application Type:<br />

Conservation Area Consent LBHF<br />

Officer Recommendation:<br />

That the application be approved subject to the condition(s) set out below:<br />

1) The development hereby permitted shall not commence later than the expiration of<br />

3 years beginning with the date of this planning permission.<br />

Condition required to be imposed by section 91(1)(a) of the Town <strong>and</strong> Country<br />

<strong>Planning</strong> Act 1990 (as amended by section 51 of the <strong>Planning</strong> <strong>and</strong> Compulsory<br />

Purchase Act 2004).<br />

2) Unless otherwise agreed in writing by the Council, the demolition of the buildings<br />

hereby permitted shall not be undertaken before:<br />

(i) a building contract for the redevelopment of the site in accordance with<br />

planning permission reference 2013/01865/FR3 has been entered into, <strong>and</strong>;<br />

(ii) notice of demolition in writing <strong>and</strong> a copy of the building contract has been<br />

submitted to the Council.<br />

To ensure that the demolition does not take place prematurely <strong>and</strong> to safeguard<br />

the character <strong>and</strong> appearance of the conservation area, in accordance with policy<br />

DM G7 of the Development Management Local Plan 2013.<br />

3) The demolition hereby permitted shall be undertaken before a scheme for<br />

temporary fencing <strong>and</strong>/or enclosure of the site has been submitted to <strong>and</strong><br />

approved in writing by the Council, <strong>and</strong> such enclosure has been erected in<br />

accordance with the approved details <strong>and</strong> retained for the duration of the building<br />

works.<br />

To ensure that the site remains in a tidy condition <strong>and</strong> to prevent harm to the street<br />

scene, in accordance with policies DM G1 <strong>and</strong> DM G7 of the Development<br />

Management Local Plan 2013.


Justification for Approving the Application:<br />

1) The proposed demolition is considered to be acceptable on the basis that planning<br />

permission exists for a satisfactory redevelopment scheme. Accordingly, it is not<br />

considered that the demolition would have an unacceptable impact on the<br />

character or appearance of the conservation area, in accordance with Policy DM<br />

G7 of the DM LP 2013 <strong>and</strong> Policy BE1 of the Core Strategy 2011.<br />

---------------------------------------------------------------------------------------------------------------------<br />

LOCAL GOVERNMENT ACT 2000<br />

LIST OF BACKGROUND PAPERS<br />

All Background Papers held by Michael Merrington (Ext: 3453):<br />

Application form received: 7th May 2013<br />

Drawing Nos: see above<br />

Policy documents: The London Plan 2011<br />

Core Strategy 2011<br />

Development Management Local Plan July 2013<br />

<strong>Planning</strong> Guidance Supplementary <strong>Planning</strong> Document July 2013<br />

Consultation Comments:<br />

Comments from:<br />

English Heritage London Region<br />

Dated:<br />

03.06.13<br />

Neighbour Comments:<br />

Letters from:<br />

Dated:<br />

Please refer to ref: 2013/01865/FR3 for the report.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!