08.05.2015 Views

Streets - City of Bartlesville

Streets - City of Bartlesville

Streets - City of Bartlesville

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Subsegment Code<br />

Street Number<br />

Block Number<br />

Street Name<br />

From<br />

To<br />

Model Class<br />

Pavement Type<br />

Pavement Strength<br />

Group Number<br />

Length (ft)<br />

Width (ft)<br />

Pave Area (SY)<br />

PCI<br />

Year<br />

Rehabilitation<br />

Cost<br />

2286-1 4630 15 JOHNSTONE PARK JOHNSTONE PARK JOHNSTONE PARK Residential Asphalt Weak 4420 155 20 344 26 2012 LOC - Partial Recon (ACP) 6,889<br />

347-1 4640 5 JOHNSTONE PARK JOHNSTONE PARK JOHNSTONE PARK Residential Asphalt Weak 4425 283 20 629 43 2013 LOC - Thick Olay + R&R1 7,232<br />

341-1 4660 5 JOHNSTONE PARK JOHNSTONE PARK JOHNSTONE PARK Residential Asphalt Moderate 4430 352 20 782 31<br />

336-1 4680 5 JOHNSTONE PARK JOHNSTONE PARK JOHNSTONE PARK Residential Asphalt Moderate 4435 271 25 753 48 2015 LOC - Thick Olay 7,904<br />

2184-1 4690 5 JOHNSTONE PARK JOHNSTONE PARK JOHNSTONE PARK Residential Asphalt Moderate 4440 326 26 942 61 2012 LOC - Surface Treatment + R&R2 1,884<br />

334-1 4690 10 JOHNSTONE PARK JOHNSTONE PARK 1ST Residential Asphalt Moderate 4445 110 27 330 83<br />

734-1 4710 5 JUPITER EOP SKYLINE Residential Asphalt Moderate 4450 445 20 989 97<br />

421-1 4730 10 KANSAS EOP WASHINGTON Residential Asphalt Moderate 4455 997 16 1,772 46 2014 LOC - Thick Olay 18,611<br />

421-2 4730 10 KANSAS EOP WASHINGTON Residential Asphalt Moderate 4460 246 16 437 59<br />

2300-1 4740 5 KATHERINE TUXEDO KENTUCKY Residential Concrete Moderate 11120 662 24 1,764 93<br />

2391-1 4740 10 KATHERINE MICHIGAN TUXEDO Residential Asphalt Moderate 4465 641 20 1,424 33<br />

2447-1 4740 15 KATHERINE INTERURBAN MICHIGAN Residential Asphalt Moderate 4470 619 20 1,376 47<br />

2487-1 4740 20 KATHERINE UNK INTERURBAN Residential Asphalt Moderate 4480 628 20 1,396 28 2013 LOC - Partial Recon (ACP) 27,911<br />

2487-2 4740 20 KATHERINE UNK INTERURBAN Residential Asphalt Moderate 4475 86 20 191 39 2018 LOC - Thick Olay + R&R2 2,198<br />

2051-1 4760 5 KAW HENSLEY FRANK PHILLIPS Residential Concrete Moderate 11125 661 26 1,909 64<br />

2162-1 4760 10 KAW CUDAHY HENSLEY Residential Asphalt Moderate 4490 662 22 1,618 69<br />

2264-1 4760 15 KAW LUPA CUDAHY Residential Concrete Moderate 11125 633 26 1,827 63<br />

2354-1 4770 5 KAW HERRICK LUPA Residential Asphalt Weak 4495 648 16 1,152 38 2018 LOC - Partial Recon (ACP) 23,040<br />

128-1 4780 5 KEELER KEELER 23RD Collector Asphalt Moderate 4505 743 21 1,734 48 2015 COL - Thick Olay 21,671<br />

128-2 4780 5 KEELER KEELER 23RD Collector Asphalt Moderate 4500 572 18 1,144 45 2014 COL - Thick Olay 14,300<br />

910-1 4790 10 KEELER 18TH 20TH Residential Concrete Moderate 11130 1,000 26 2,888 72<br />

910-2 4790 10 KEELER 18TH 20TH Residential Asphalt Strong 4510 349 26 1,008 52<br />

1027-1 4800 5 KEELER 17TH 18TH Residential Concrete Moderate 11135 550 24 1,466 60<br />

1094-1 4800 10 KEELER 16TH 17TH Residential Concrete Moderate 11135 565 26 1,632 62<br />

1157-1 4800 15 KEELER 15TH 16TH Residential Asphalt Strong 4515 446 22 1,090 56 2020 LOC - Moderate Olay + R&R2 12,540<br />

1157-2 4800 15 KEELER 15TH 16TH Residential Concrete Moderate 11135 269 22 657 68<br />

1242-1 4800 20 KEELER 14TH 15TH Residential Asphalt Strong 4520 559 24 1,491 54<br />

1290-1 4800 25 KEELER 13TH 14TH Residential Asphalt Strong 4525 800 31 2,756 44 2022 LOC - Thick Olay + R&R2 31,689<br />

1383-1 4800 30 KEELER 12TH 13TH Residential Asphalt Strong 4530 360 28 1,120 52<br />

1423-1 4800 35 KEELER 11TH 12TH Residential Asphalt Moderate 4535 361 28 1,123 67<br />

1444-1 4800 40 KEELER 10TH 11TH Residential Asphalt Moderate 4540 420 28 1,307 54<br />

1510-1 4800 45 KEELER 9TH 10TH Residential Asphalt Moderate 4545 397 28 1,235 74 2021 LOC - Surface Treatment + R&R2 2,470<br />

1563-1 4800 50 KEELER 8TH 9TH Residential Asphalt Moderate 4550 400 30 1,333 72<br />

1617-1 4800 55 KEELER ADAMS 8TH Residential Asphalt Strong 4555 401 30 1,337 70<br />

1687-1 4800 60 KEELER 6TH ADAMS Collector Asphalt Strong 4560 405 58 2,610 68<br />

1789-1 4800 65 KEELER 5TH 6TH Collector Asphalt Moderate 4565 394 56 2,452 63<br />

1847-1 4800 70 KEELER 4TH 5TH Collector Asphalt Strong 4570 401 58 2,584 61 2012 COL - Surface Treatment + R&R2 5,168<br />

1927-1 4800 75 KEELER FRANK PHILLIPS 4TH Collector Asphalt Moderate 4575 498 45 2,490 72<br />

IMS Infrastructure Management Services <strong>Bartlesville</strong>_byGISID_Rev2a, $1.25M Plan by Subseg page 37 <strong>of</strong> 72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!