for an overlay and $46,000/mi for localized PCC rehab, the <strong>City</strong> needs to spend approximately<br />
$1.45m/year to maintain the current condition average.<br />
Pavement Type<br />
Miles<br />
Average<br />
PCI<br />
Selected<br />
Rehab Based on<br />
PCI<br />
Rehab<br />
Design Life<br />
(yrs)<br />
Annual<br />
Program<br />
(mi/yrs)<br />
Average<br />
Rehab Cost<br />
($/mile)<br />
Annual Cost<br />
($)<br />
Asphalt 151.8 64 Thin Overlay 20 7.6 170,000 1,290,000<br />
Concrete 70.1 66 Localized Rehab 20 3.5 46,000 160,000<br />
Annual Budget Based on Average Design Life ($/yr): 1,450,000<br />
The third methodology to confirm the required amount <strong>of</strong> annual funding is to identify the current network<br />
deficiency, that is the amount required to rehabilitate all streets in the network assuming unlimited<br />
funding, and then divide by the typical life cycle <strong>of</strong> each rehabilitation activity. This is referred to as the<br />
Fix All Estimate and Steady State Budget.<br />
For <strong>Bartlesville</strong>, Fix All Estimate is approximately $32.4M and the Steady State Budget is $1.3M/year,<br />
broken down as follows:<br />
ACP Rehab Function Total Cost ($) % <strong>of</strong> Total ART COL LOC<br />
Life Cycle<br />
Cost ($)<br />
Full Recon (ACP) 1,480,500 6.9 0 309,700 1,170,800 29,500<br />
Partial Recon (ACP) 4,744,200 22.2 217,200 1,368,000 3,159,000 118,400<br />
Thick Olay 3,527,400 16.5 146,000 915,600 2,465,800 141,500<br />
Moderate Olay 5,229,400 24.4 494,700 1,630,900 3,103,800 208,700<br />
Thin Olay 5,608,800 26.2 957,700 2,317,100 2,334,000 224,200<br />
Surface Treatment 450,300 2.1 147,300 128,800 174,200 45,900<br />
Slurry Seal 303,100 1.4 133,900 90,000 79,200 60,700<br />
Routine Maintenance 47,500 0.2 27,000 12,900 7,600 32,200<br />
Total Asphalt Network: 21,391,200 100 2,123,800 6,773,000 12,494,400 861,100<br />
PCC Rehab Function Total Cost ($) % <strong>of</strong> Total ART COL LOC<br />
Life Cycle<br />
Cost ($)<br />
Full Recon (PCC) 112,500 1.0 0 0 112,500 1,500<br />
Partial Recon (PCC) 2,756,400 25.0 0 1,320,600 1,435,800 55,200<br />
Extensive Panel Replacement 3,121,900 28.4 0 1,715,500 1,406,400 104,600<br />
Moderate Panel Replacement 1,840,600 16.7 7,500 592,600 1,240,500 61,400<br />
Localized Panel Replacement 2,149,700 19.5 35,800 700,900 1,413,000 72,500<br />
Creak Seal, Local Rehab 894,600 8.1 70,800 255,100 568,700 90,100<br />
Crack Sealing 108,800 1.0 23,700 33,500 51,600 21,400<br />
Routine Maintenance 24,900 0.2 500 14,200 10,200 13,700<br />
Total PCC Network: 11,009,400 100 138,300 4,632,400 6,238,700 420,400<br />
Total Network Rehab: 32,400,600 2,262,100 11,405,400 18,733,100 1,281,500<br />
3.3 NETWORK BUDGET ANALYSIS MODELS<br />
A total <strong>of</strong> 4 budget runs ranging from $750k to $2.00M per year plus Fix All and Do Nothing options were<br />
ran for the asphalt and concrete networks in order to fine tune the analysis process and identify optimum<br />
expenditures. The budget analysis results are summarized below:<br />
• Fix All - The Fix All budget is similar to the Fix All Estimate in that it assumes each street is<br />
rehabilitated with unlimited funds available. The idea is to identify the upper limit <strong>of</strong> spending the<br />
IMS Infrastructure Management Services <strong>Bartlesville</strong> 2012 Report Rev1 page 17