Streets - City of Bartlesville
Streets - City of Bartlesville
Streets - City of Bartlesville
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Superseg ID<br />
Year<br />
Description<br />
Length (ft)<br />
Area (ft2)<br />
Pavement Type<br />
Model Class<br />
Pavement Strength<br />
PCI<br />
Calculated Priority<br />
B Load Factor<br />
Rehabilitation<br />
Cost<br />
6780 2018 QUAIL RIDGE RD - 6780 268 774 Asphalt Collector Moderate 41 59 30 COL - Thick Olay 9,678<br />
7740 2018 SMYSOR DR - 7740 388 690 Asphalt Residential Weak 42 59 47 LOC - Thick Olay 7,243<br />
6635 2018 PHEASANT CT - 6635 214 808 Asphalt Residential Weak 42 59 43 LOC - Thick Olay 8,489<br />
6375 2018 OHIO ST - 6375 629 2,097 Asphalt Collector Moderate 42 59 32 COL - Thick Olay 26,208<br />
1390 2018 5TH ST - 1390 662 1,618 Asphalt Collector Moderate 42 58 31 COL - Thick Olay 20,228<br />
11755 2018 ROLLING MEADOWS RD - 11755 937 2,707 Concrete Collector Moderate 41 58 30 COL - Extensive Panel Replacem 81,225<br />
3755 2018 HERRICK ST - 3755 633 1,266 Asphalt Residential Moderate 40 57 34 LOC - Thick Olay 13,293<br />
8590 2018 VELMA DR - 8590 671 1,491 Asphalt Residential Moderate 40 57 41 LOC - Thick Olay 15,657<br />
6425 2018 OSAGE AVE - 6425 402 1,340 Asphalt Residential Moderate 40 57 32 LOC - Thick Olay 14,070<br />
2470 2018 COVENTRY CT - 2470 529 1,528 Asphalt Residential Moderate 40 57 32 LOC - Thick Olay 16,046<br />
7025 2018 ROANOKE RIDGE RD - 7025 1,065 2,840 Asphalt Residential Moderate 41 56 36 LOC - Thick Olay 29,820<br />
1820 2018 BEACON COURT (PVT) - 1820 191 424 Asphalt Residential Moderate 41 56 34 LOC - Thick Olay 4,457<br />
2885 2018 EDGEWOOD AVE - 2885 588 1,699 Asphalt Residential Moderate 41 56 38 LOC - Thick Olay 17,836<br />
8795 2018 WESLEY DR - 8795 644 2,147 Asphalt Residential Moderate 41 56 36 LOC - Thick Olay 22,540<br />
2090 2018 CAMDEN CT - 2090 555 1,480 Asphalt Residential Moderate 41 56 33 LOC - Thick Olay 15,540<br />
5520 2018 MC NAMARA ST - 5520 361 722 Asphalt Residential Moderate 41 56 35 LOC - Thick Olay 7,581<br />
5805 2018 MONTICELLO DR - 5805 304 811 Asphalt Residential Moderate 42 56 36 LOC - Thick Olay 8,512<br />
12000 2018 TRAIL DR - 12000 1,083 3,129 Concrete Residential Moderate 41 55 3 LOC - Extensive Panel Replacem 62,579<br />
5695 2018 MICHIGAN ST - 5695 161 464 Asphalt Residential Moderate 42 55 32 LOC - Thick Olay 4,875<br />
12145 2018 WILSHIRE AVE - 12145 674 1,946 Concrete Residential Moderate 41 55 9 LOC - Extensive Panel Replacem 38,927<br />
11165 2018 KENTUCKY ST - 11165 309 894 Concrete Residential Moderate 41 54 33 LOC - Extensive Panel Replacem 17,872<br />
8510 2018 TUXEDO BLVD - 8510 88 430 Asphalt Arterial Moderate 61 39 5 ART - Surface Treatment + R&R2 968<br />
7555 2019 SHAWNEE AVE - 7555 263 584 Asphalt Collector Moderate 26 79 53 COL - Partial Recon (ACP) 11,689<br />
1745 2019 BARBARA AVE - 1745 1,280 2,560 Asphalt Residential Weak 25 79 58 LOC - Partial Recon (ACP) 51,200<br />
5490 2019 MARTIN LN - 5490 214 571 Asphalt Collector Moderate 26 78 52 COL - Partial Recon (ACP) 11,413<br />
4100 2019 INTERURBAN DR - 4100 371 824 Asphalt Collector Moderate 26 78 43 COL - Thick Olay + R&R2 11,130<br />
4400 2019 JOHNSTONE AVE - 4400 409 1,091 Asphalt Collector Moderate 26 78 50 COL - Partial Recon (ACP) 21,813<br />
5850 2019 MORGAN AVE - 5850 999 2,220 Asphalt Residential Weak 26 78 58 LOC - Partial Recon (ACP) 44,400<br />
3050 2019 FENWAY AVE - 3050 662 1,912 Asphalt Residential Moderate 25 75 57 LOC - Partial Recon (ACP) 38,249<br />
IMS Infrastructure Management Services <strong>Bartlesville</strong>_byGISID_Rev2a, $1.25M Plan by Super page 15 <strong>of</strong> 25