Streets - City of Bartlesville
Streets - City of Bartlesville
Streets - City of Bartlesville
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Superseg ID<br />
Year<br />
Description<br />
Length (ft)<br />
Area (ft2)<br />
Pavement Type<br />
Model Class<br />
Pavement Strength<br />
PCI<br />
Calculated Priority<br />
B Load Factor<br />
Rehabilitation<br />
Cost<br />
4950 2017 LEISURE LN - 4950 747 1,992 Asphalt Residential Moderate 41 59 35 LOC - Thick Olay 20,916<br />
4410 2017 JOHNSTONE PARK RD - 4410 996 2,213 Asphalt Residential Moderate 41 59 43 LOC - Thick Olay 23,240<br />
6525 2017 PARK HILL LN - 6525 806 2,328 Asphalt Residential Moderate 41 58 35 LOC - Thick Olay 24,449<br />
7985 2017 STATE ST - 7985 542 1,566 Asphalt Residential Moderate 42 58 31 LOC - Thick Olay 16,441<br />
3815 2017 HICKORY AVE - 3815 483 1,073 Asphalt Residential Moderate 42 57 37 LOC - Thick Olay 11,270<br />
1535 2017 9TH ST - 1535 331 662 Asphalt Residential Moderate 42 57 31 LOC - Thick Olay 6,951<br />
8325 2017 TOWER CRT - 8325 409 1,182 Asphalt Residential Moderate 42 57 38 LOC - Thick Olay 12,406<br />
10940 2017 HAMPDEN RD - 10940 667 1,926 Concrete Residential Moderate 40 57 0 LOC - Extensive Panel Replacem 38,529<br />
10895 2017 GRANDVIEW PL - 10895 455 1,313 Concrete Residential Moderate 40 57 0 LOC - Extensive Panel Replacem 26,266<br />
11655 2017 QUEENSTOWN AVE - 11655 654 1,890 Concrete Residential Moderate 41 57 0 LOC - Extensive Panel Replacem 37,792<br />
11530 2017 OSAGE AVE - 11530 821 2,373 Concrete Residential Moderate 41 56 0 LOC - Extensive Panel Replacem 47,459<br />
11710 2017 RIDGEWOOD RD - 11710 1,862 5,380 Concrete Residential Moderate 41 56 16 LOC - Extensive Panel Replacem 107,605<br />
11260 2017 MACKLYN LN - 11260 906 2,618 Concrete Residential Moderate 41 56 1 LOC - Extensive Panel Replacem 52,362<br />
10645 2017 DARTMOUTH DR - 10645 1,511 4,366 Concrete Residential Moderate 41 56 36 LOC - Extensive Panel Replacem 87,311<br />
10310 2017 AVONDALE AVE - 10310 661 1,908 Concrete Residential Moderate 41 56 0 LOC - Extensive Panel Replacem 38,165<br />
11300 2017 MAPLE AVE - 11300 1,008 2,689 Concrete Residential Moderate 41 56 0 LOC - Extensive Panel Replacem 53,773<br />
6370 2017 OHIO ST - 6370 211 703 Asphalt Collector Moderate 60 40 11 COL - Surface Treatment + R&R2 1,407<br />
4905 2017 LARIAT DR - 4905 177 512 Asphalt Collector Moderate 60 40 0 COL - Surface Treatment + R&R2 1,023<br />
8425 2018 TUXEDO BLVD - 8425 355 1,814 Asphalt Arterial Moderate 26 84 41 ART - Thick Olay + R&R2 29,938<br />
6785 2018 QUAIL RIDGE RD - 6785 332 959 Asphalt Collector Weak 27 84 58 COL - Partial Recon (ACP) 19,182<br />
7065 2018 ROGERS AVE - 7065 691 1,996 Asphalt Residential Weak 25 83 66 LOC - Partial Recon (ACP) 39,924<br />
3410 2018 GEORGETOWN DR - 3410 171 456 Asphalt Collector Moderate 26 82 47 COL - Partial Recon (ACP) 9,120<br />
7225 2018 SANTA FE AVE - 7225 648 1,728 Asphalt Collector Moderate 26 82 43 COL - Thick Olay + R&R2 23,328<br />
1395 2018 5TH ST - 1395 331 662 Asphalt Collector Moderate 25 82 54 COL - Partial Recon (ACP) 13,240<br />
2355 2018 CHOLWELL AVE - 2355 661 2,056 Asphalt Residential Weak 25 82 58 LOC - Partial Recon (ACP) 41,129<br />
3420 2018 GEORGETOWN DR - 3420 228 608 Asphalt Collector Moderate 25 82 50 COL - Partial Recon (ACP) 12,160<br />
8930 2018 WISCONSIN ST - 8930 309 893 Asphalt Residential Weak 25 82 60 LOC - Partial Recon (ACP) 17,853<br />
2610 2018 DEERFIELD CIR - 2610 167 445 Asphalt Residential Weak 26 81 66 LOC - Partial Recon (ACP) 8,907<br />
4495 2018 KAW AVE - 4495 648 1,152 Asphalt Residential Weak 26 81 65 LOC - Partial Recon (ACP) 23,040<br />
IMS Infrastructure Management Services <strong>Bartlesville</strong>_byGISID_Rev2a, $1.25M Plan by Super page 13 <strong>of</strong> 25