PaveType FunCL Weak Moderate Strong<br />

Asphalt Arterial 1.5 1.4 1.3<br />

Collector 1.4 1.3 1.2<br />

Residential 1.3 1.2 1.1<br />

Concrete Arterial 1.4 1.3 1.2<br />

Collector 1.3 1.2 1.1<br />

Residential 1.2 1.1 1.0<br />

The effect <strong>of</strong> the PWF is to place an emphasis on weaker asphalt streets with higher functional<br />

classes tapering down to stronger concrete residentials. Priority values are assigned at the<br />

project (supersegment level) and have been reported in Appendix C – Street Inventory by<br />

Supersegment.<br />

• Rehabilitation Strategies and Unit Rates – The rehab strategies, unit rates, PCI ranges and<br />

selection criteria used in the pavement analysis are presented below. Key items presented with<br />

the rehabilitation strategies are:<br />

Rehab Cost ($/yd2) PCI Range Constraint Post Rehab Reset Values<br />

Pavement Type<br />

Pavement Rehab<br />

Description<br />

ART<br />

COL<br />

LOC<br />

Min PCI<br />

Breakpoint PCI<br />

Max PCI<br />

Min Load Factor<br />

Max Load Factor<br />

Reset PCI Value<br />

Minimum Life<br />

Reset Load Factor<br />

Reset Non-Load Factor<br />

Reset Structural Factor<br />

Reset Rough Factor<br />

Selected Rehab Order<br />

ACP Slurry Seal Single Slurry Seal 1.50 1.50 1.50 75 77 80 90 5 0 0 90 14<br />

ACP Surface Treatment Double Slurry, Chip Seal or MicroSurface 2.00 1.75 1.75 70 72 75 0 15 92 5 0 0 92 7<br />

ACP Surface Treatment + R&R1 Double Slurry, Chip Seal or MicroSurface 2.25 2.00 2.00 70 72 75 15 100 92 5 0 0 92 6<br />

ACP Surface Treatment + R&R2 Double Slurry, Chip Seal or MicroSurface 2.50 2.25 2.25 60 62 70 0 15 92 5 0 0 92 5<br />

ACP Thin Olay < 2" ACP Overlay 12.50 11.50 10.50 60 62 70 15 30 93 5 0 0 93 13<br />

ACP Thin Olay + R&R1 < 2" ACP Overlay 13.50 12.50 11.50 60 62 70 30 100 93 5 0 0 93 12<br />

ACP Thin Olay + R&R2 < 2" ACP Overlay 13.50 12.50 11.50 50 52 60 0 20 93 5 0 0 93 11<br />

ACP Moderate Olay 2" to 3 " ACP Overaly 14.50 13.50 12.50 50 52 60 20 40 94 5 0 0 94 10<br />

ACP Moderate Olay + R&R1 2" to 3 " ACP Overaly 15.50 14.50 13.50 50 52 60 40 100 94 5 0 0 94 9<br />

ACP Moderate Olay + R&R2 2" to 3 " ACP Overaly 15.50 14.50 13.50 40 43 50 0 30 94 5 0 0 94 8<br />

ACP Thick Olay 3" + ACP Overlay 16.50 15.50 12.50 40 43 50 30 50 95 5 0 0 95 3<br />

ACP Thick Olay + R&R1 3" + ACP Overlay 17.50 16.50 13.50 40 43 50 50 100 95 5 0 0 95 2<br />

ACP Thick Olay + R&R2 3" + ACP Overlay 17.50 16.50 13.50 25 28 40 0 45 96 5 0 0 96 1<br />

ACP Partial Recon (ACP) Surface Removal, Compaction, 3" Overlay 25.00 22.50 20.00 25 28 40 45 100 98 5 0 0 98 4<br />

ACP Full Recon (ACP) Full Base Reconstruction and 3" Overlay 55.00 45.00 40.00 0 15 25 100 5 0 0 100 15<br />

PCC Crack Sealing Crack and Joint Sealing 1.50 1.50 1.50 75 77 80 92 5 92 14<br />

PCC Creak Seal, Local Rehab Local Rehab and Crack Seal 2.50 2.50 2.50 70 72 75 93 5 93 6<br />

PCC Localized Panel Replacement Panel Repalcement < 5% 8.75 7.50 6.25 60 62 70 94 5 94 12<br />

PCC Moderate Panel Replacement Panel Repalcement < 10% 17.50 15.00 12.50 50 52 60 95 5 95 9<br />

PCC Extensive Panel Replacement Panel Repalcement < 20% 35.00 30.00 25.00 40 43 50 96 5 96 2<br />

PCC Partial Recon (PCC) Surface Removal, Compaction, PCC Surface 125.00 110.00 100.00 25 28 40 98 5 98 4<br />

PCC Full Recon (PCC) Full Base Reconstruction and PCC Surface 175.00 150.00 125.00 0 10 25 100 5 100 15<br />

Pavement Type – ACP = Asphalt or flexible pavement, PCC = concrete or rigid pavement.<br />

Rehabilitation and Description - defines the course <strong>of</strong> action to be taken complete with the<br />

asphalt thickness used to develop the unit rate. The rehabilitation activities may be modified to<br />

more closely match the <strong>City</strong>’s activities at any time. The critical function <strong>of</strong> each rehabilitation is<br />

to ensure sufficient funds have been set aside to be able to complete the work. For example, an<br />

Arterial Moderate Overlay may be exchanged for a grind and inlay complete with a micro surface<br />

so long as it can be completed for $14.50/yd2 and is structurally appropriate for that segment.<br />