<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Springpole <strong>Gold</strong> Access Corridor Project<br />

<strong>Final</strong> <strong>Environmental</strong> <strong>Study</strong> <strong>Report</strong><br />

Minister of the Environment<br />

135 St. Clair Ave. West, 12th Floor<br />

Toronto, ON M4V 1P5<br />

Requests must be received by the Minister within the 30-day comment period, which expires on 2<br />

April 2013, and copied at the same time to the MNR contact person at the address below.<br />

David New<br />

Red Lake South Area Supervisor<br />

Ontario Ministry of Natural Resources<br />

P.O. Box 5003<br />

Red Lake, ON P0V 2M0<br />

Phone: 807-727-1383<br />

Fax: 807-727-2861<br />

Email: dave.new@ontario.ca<br />

Pending successful completion of this EA process, execution of the Project will require the provincial<br />

approvals listed in the bullets below.<br />

<br />

<br />

<br />

Crown Forest Sustainability Act: Forest Resource License to harvest Crown owned timber.<br />

An estimated (stand volumes to be provided in permit application).<br />

Public Lands Act, Lakes and Rivers Improvement Act: Letter of Authority for road<br />

construction, minor water crossings on Crown land. In addition, GCU is seeking a Land Use<br />

Permit to allow GCU to install a gate at the end of the FMP Approved Road (refer to Figure<br />

2-1).<br />

Endangered Species Act Section 17(c): C-Permit (Overall Benefit Permit) for Woodland<br />

Caribou<br />

The proposed work will adhere to the mitigation measures in the guidance documents listed in the<br />

bullets below.<br />

<br />

<br />

<br />

<br />

MNR (1988) and MNR (2010) in relation to AOCs and harvesting of merchantable timber.<br />

MNR (1995) in relation to water crossings and road construction.<br />

MNR (1996) in relation to winter culvert installation.<br />

Approved, specific AOC requirements in the Trout Lake Forest FMP.<br />

3.4.2 Federal<br />

The sole federal authorization that will be required for the Project is the approval pursuant to the<br />

Navigable Waters Protection Act for the water crossing over the Birch River.<br />

The proposed work will adhere to the guidance documents listed in the bullets below.<br />

<br />

<br />

<br />

Current DFO Operational Statements for clear span bridges and mineral exploration.<br />

DFO (1995) in relation to pump intakes.<br />

Wright and Hopky (1998) in relation to any blasting activities near the Birch River crossing.<br />