Page 35<br />

1. General comment on Section 5.6: TFTO has misinterpreted the ESR. The ESR is stating that a<br />

road changes the landscape and that the MNR has admitted that they do not fully understand<br />

the implications of those changes. TFTO is also incorrect with regard to the sources used for the<br />

caribou data. Two aerial surveys were completed (2011 and 2012) and data was received from<br />

the MNR covering the dates of 1998-2012. Discussions regarding caribou are ongoing with the<br />

species at risk biologist from Red lake.<br />

2. Page number should be 53.<br />

3. General comment on Section 5.7: Monitoring plans will be developed in consultation with<br />

regulatory agencies and stakeholders once the EA is reviewed and approved. Stipulations and<br />

requirements will be tied to the permitting of the access corridor through the EA process.<br />

4. This type of project is common and proposed mitigation measures are well-established and<br />

proven over decades.<br />

5. GCU intends to have a long-term presence in the region and wishes to develop a working group<br />

to facilitate future discussions regarding the Springpole <strong>Gold</strong> Project. See page of the ESR 31,<br />

items 1, 7, and 8.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 39-