Page 33<br />

1. Table 4 General Comment: Road construction work is well understood and mitigation measures<br />

are proven and committed to in the final ESR to mitigate items listed in TFTO’s Table 4(see page<br />

89 of the ESR report). GCU will have a competent Registered Professional Forester, very well<br />

experienced in road building, to oversee all of the construction to ensure guidance documents<br />

are followed. This is articulated in the cover letter to the final ESR.<br />

2. GCU's <strong>Environmental</strong> Coordinator will monitor the water crossings on a monthly basis for the<br />

life of the road, to ensure functionality and physical stability, as well as ensure crossings are not<br />

creating sediment problems in the water or failing, ESR page 47. Section 8 of the final ESR<br />

describes the competent professional that will oversee construction and audit the road<br />

installation in accordance with well established guidelines.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 37-