06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 20<br />

1. See previous comments in regard to page 16 of the TFTO Submission stating the importance of<br />

2011 work being viewed in conjunction with 2012 work. Amphibian call counts were conducted<br />

in 2012.<br />

2. This statement is incorrect. Please review ESR Appendix 5. In addition to conducting two aerial<br />

surveys in two years, a very detailed habitat analysis was completed using the Ontario<br />

Landscape Tool (OLT) developed by the OMNR. This is significantly more work than that<br />

undertaken by the OMNR to develop moose management guidelines for wildlife management<br />

units. The OMNR conducts moose aerial inventories every 3 years (sometimes as infrequently as<br />

5 or 7 years in northern units) and flies only a small, representative portion of the wildlife<br />

management unit. They currently do not use the OLT to assist in setting management guidelines.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 21-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!