06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(which were not intended to describe conditions at the proposed access corridor) instead of the<br />

material presented in Appendix 4 of the ESR.<br />

8. The databases used were the most complete and up to date data sources available. The<br />

consultation of these databases is a mandatory and commonplace task undertaken with all<br />

baseline studies.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 20-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!