Page 18<br />

1. This is not a requirement of a Category C Class EA.<br />

2. The naming convention for the study areas will differ between reports, but should be consistent<br />

throughout each individual report. It is common practice to have study areas that differ<br />

depending on which environmental parameter is being investigated, however, all of the various<br />

study areas will fall into one overriding study area. This hasn't necessarily been clearly laid out<br />

as these reports are DRAFT and are meant to eventually be compiled for future permitting<br />

purposes.<br />

3. GCU disagrees with the assertion that the maps provided in the reports are of poor quality and<br />

low resolution. Figures are exported at 700 dpi, which is a high resolution for a report figure. To<br />

date the ESR report has been distributed to various provincial as well as federal agencies. The<br />

figures presented in the report met the criteria established by these agencies. The baseline<br />

reports have also been distributed and no comments regarding the quality of the figures have<br />

been received.<br />

4. The aerial survey conducted in 2011 covered 81 km 2 . This aerial survey covered only GCU land<br />

claims at that time. Since then, an additional aerial survey has been conducted which covered<br />

approximately 900 km 2 (see ESR appendix 5 "Field report from DST")<br />

5. The exact locations of field work for the 2011 reports is indicated within each of the 2011<br />

baseline reports and TFTO makes reference to the locations of this work in its Submission. The<br />

locations of the data collection efforts post-2011 can be found in the Biological Constraints<br />

<strong>Report</strong> in Appendix 4 of the ESR<br />

6. The exact size and location of the various study areas can be found in the Biological Constraints<br />

<strong>Report</strong> in Appendix 4 of the ESR (Page 9 "Assessment Boundaries" and Figure 1.2 Regional and<br />

Local <strong>Study</strong> Areas in the Springpole Lake Area, page 10)<br />

7. See previous comment (#6)<br />

8. Recommendation is based on incorrect information.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 18-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!