06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8. Please see Section 5.2, page 46 of ESR.<br />

9. This is not a requirement for a category C Class EA. GCU's primary use of the road would be<br />

during winter months, when traffic volumes are low. The speed at which vehicles will travel will<br />

be necessarily slow due road conditions and standards. This will minimize safety issues and the<br />

risk of wildlife strikes.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 17-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!