Page 14<br />

1. GCU has adopted measures to limit access and reduce impacts of the road, including installation<br />

of gates, maximizing setbacks, and signage restricting access.<br />

2. Speed limits on the road will be necessarily low, because of the standard to which it is being<br />

constructed.<br />

3. Local Aboriginal communities were asked to provide information on how the project will impact<br />

their Aboriginal and Treaty rights. To date no specific issues have been raised by any of the<br />

communities.<br />

4. TFTO’s assertions are not substantiated. Information used throughout the document to support<br />

TFTO’s position is either incorrect or taken out of context of the ESR. For example, the concerns<br />

that have been raised by various stakeholders (in general sense) are accurately stated, but the<br />

mitigation measures that have been adopted to address the concerns are completely<br />

disregarded by TFTO<br />

5. GCU is prepared to adopt a good neighbour policy. A TFTO member proposed to write a draft<br />

policy for discussion, but did not follow through. GCU last offered to discuss moving this<br />

forward on the conference calls with the TFTO on January 21 and February 4, but TFTO has not<br />

responded.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 13-