Page 9 1. GCU must comply with all applicable legislation and is committed to doing so. 2. Page number reference should be 35. Gold Canyon Resources Inc. Response to TFTO Submission for Springpole Access Corridor Final ESR April 2013 Schedule 2/- 9-
Page 10 1. Detailed comments on the water sampling and Aquatics report are provided in our comments on page 32 of the TFTO Submission, below. The water sampling does not support TFTO’s allegation that exploration activities are polluting Springpole Lake. The Aquatics report describes baseline conditions in contemplation of potential future mining activities and is not related to the access corridor ESR. 2. TFTO does not appear to understand the purpose of the ESR. A Class C EA presents a project, highlights the potential environmental effects of that project, and discusses mitigation measures to reduce/eliminate environmental impacts. GCU must and will comply with all applicable legislation. 3. These activities are not part of the proposed project, or the exploration activities being conducted by GCU. Gold Canyon Resources Inc. Response to TFTO Submission for Springpole Access Corridor Final ESR April 2013 Schedule 2/- 10-
- Page 321 and 322: Gold Canyon Resources Inc: Final En
- Page 323 and 324: Gold Canyon Resources Inc: Final En
- Page 325 and 326: Gold Canyon Resources Inc: Final En
- Page 327 and 328: Gold Canyon Resources Inc: Final En
- Page 329 and 330: Gold Canyon Resources Inc: Final En
- Page 331 and 332: Gold Canyon Resources Inc: Final En
- Page 333 and 334: Gold Canyon Resources Inc: Final En
- Page 335 and 336: Gold Canyon Resources Inc: Final En
- Page 337 and 338: Gold Canyon Resources Inc: Final En
- Page 339 and 340: Gold Canyon Resources Inc: Final En
- Page 341 and 342: Gold Canyon Resources Inc: Final En
- Page 343 and 344: Gold Canyon Resources Inc: Final En
- Page 345 and 346: Gold Canyon Resources Inc: Final En
- Page 347 and 348: Gold Canyon Resources Inc: Final En
- Page 349 and 350: Gold Canyon Resources Inc: Final En
- Page 351 and 352: Gold Canyon Resources Inc: Final En
- Page 353 and 354: Gold Canyon Resources Inc: Final En
- Page 355 and 356: Gold Canyon Resources Inc: Final En
- Page 357 and 358: Gold Canyon Resources Inc: Final En
- Page 359 and 360: Gold Canyon Resources Inc: Final En
- Page 361 and 362: GCU has hired qualified, independen
- Page 363 and 364: The basic environmental protection
- Page 365 and 366: 8. Like the Draft ESR, Notices were
- Page 367 and 368: A full record of consultation is pr
- Page 369 and 370: Page 7 1. Corridor alternatives pre
- Page 371: 13. “Stakeholders” refers solel
- Page 375 and 376: Page 13 1. GCU is proposing to clea
- Page 377 and 378: Page 15 1. GCU is open to developin
- Page 379 and 380: Page 17 1. The economic information
- Page 381 and 382: Page 18 1. This is not a requiremen
- Page 383 and 384: (which were not intended to describ
- Page 385 and 386: Page 21 1. Note that the OLT develo
- Page 387 and 388: Page 22 1. The statement that carib
- Page 389 and 390: Page 24 1. General comment on 5.3.2
- Page 391 and 392: Page 26 1. The background database
- Page 393 and 394: Page 29 1. Comments on Table 3: The
- Page 395 and 396: Page 31 1. Water quality at Springp
- Page 397 and 398: 9. The aquatics baseline report doe
- Page 399 and 400: assessed through toxicity testing a
- Page 401 and 402: Page 34 1. Life of this Project is
- Page 403 and 404: Page 36 1. These recommendations ar
- Page 405 and 406: Page 38 1. Domtar has approval unde
- Page 407 and 408: Page 39 1. This means simply that G
- Page 409 and 410: Page 42 1. The recommendations from
- Page 411 and 412: Supplemental Mitigation Measures fo
Page 9<br />
1. GCU must comply with all applicable legislation and is committed to doing so.<br />
2. Page number reference should be 35.<br />
<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />
Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />
April 2013 Schedule 2/- 9-