06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13. “Stakeholders” refers solely to TFTO<br />

14. GCU has acted in good faith and taken the views and concerns of stakeholders, including TFTO,<br />

into account in the final ESR. The Project has been modified and mitigation measures<br />

incorporated to respond to issues identified by stakeholders. At its January 21 and February 4,<br />

2013 meetings with TFTO, GCU requested TFTO's position on any impacts they felt were<br />

unresolved by the mitigation measures. Three issues were identified at the January meeting.<br />

These were discussed in detail during the meetings, and mitigation measures were updated and<br />

included in Table 3-2 of the ESR, as follows:<br />

• increased theft and vandalism of their properties because of increased access(item 14);<br />

• increased access to remote lakes (item 5); and<br />

• impact to business due to loss of wilderness (item 2).<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 8-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!