06.05.2015 Views

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

Revised Final Environmental Study Report (24 MB) - Gold Canyon ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 7<br />

1. Corridor alternatives presented during the April 7 pre-ESR consultation have not been included.<br />

2. The ESR relies upon the Technical report contained in Appendix 4 of the <strong>Final</strong> ESR. These<br />

“working draft” reports were provided to TFTO upon request, but were clearly identified as<br />

working drafts of baseline studies being conducted in support of future potential permit<br />

applications for the Springpole <strong>Gold</strong> Project. Data from these baseline studies that is relevant to<br />

the ESR is summarized in the final ESR.<br />

3. GCU initiated discussion with various Stakeholders in April 2012 to be able to incorporate their<br />

views in developing the Project. Throughout discussions with stakeholders, GCU has presented<br />

the most up to date information then available.<br />

4. As noted in Section 3.1.4 of the ESR, in mid-May 2012 GCU provided Open House sessions for<br />

CLFN, SFFN, and LSFN, to solicit feedback on the design of the field portions of the baseline<br />

studies. Additionally, FN technicians were hired by GCU to participate in every baseline study<br />

that was conducted on the property.<br />

5. The details of the consultation process are provided in Section 3 of the ESR. Given the scope of<br />

the Project, all parties have had a significant opportunity to review and provide comment. Prior<br />

to submission of the <strong>Final</strong> ESR, GCU-revised the Project and adopted mitigation measures to<br />

take into account stakeholder concerns.<br />

6. Some submitted letters of concern, others letters/comments in support.<br />

<strong>Gold</strong> <strong>Canyon</strong> Resources Inc.<br />

Response to TFTO Submission for Springpole Access Corridor <strong>Final</strong> ESR<br />

April 2013 Schedule 2/- 6-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!